1Introduction

The use of trains in long-distance transportation remains far behind the general expectations although a lot of attention is paid to the transportation mode. Besides complaints about the possible inflexibility of the service providers, there are some more serious drawbacks, e.g. the non-transparent regulations of freight transport by rail. Moreover, the developments show that the transport volume between Germany and Eastern Europe has increased dramatically during the last years. However, in contrast with the other means of transportation, the freight railway industry has remained nearly constant in volume and decreased percentages.

Furthermore, it can also help to administrate terminal-to-terminal connections and justify possible fluctuation of demand and supply and short-term applications for modifications. Establishment of the train connections taking into account the pre- and post-rail hauls: To increase efficiency and flexibility intermodal transport has to be optimized.

2Project Goals

The project focuses on the improvement at the train transportation mode. Therefore, the aim of the project DynKo is related to the enhancement of the efficiency for the real-time organization of the freight transport, in order to raise the competitiveness of particular companies. The goals of the project are the following:

* Relocation of the high volumes to the rail transportation mode

* Improvement of the basic conditions of the rail freight

* Development of new commercial models for using dynamic train capacity

* Development of decision support systems (DSS)

* Increasing the transparency for the use of routes (Information, sensor-based)

3 The Present Results of Dynko

In the first and two stages of the project, analysis of general conditions for the planning instrument, a comprehensive theoretical research with a focus on Project logistics has been spread. Because the geographic scope of the project lies in Eastern Europe and the Far East, the examination of the railway network is correspondingly confined to on those areas. In these two stages, some typical and main routes in the network, e.g. from Duisburg to Moscow or to Romania , were chosen according to the current market analysis that was also recognized by project partners. In those areas, suppliers and customers are active with freight by rail.

The analysis of the general conditions in the regions and countries along the main routes were divided into four aspects: economic, technical and legal conditions, in addition with the possible disturbance variables in the transport network. These four aspects will be discussed in detail as follows:

a. Economic Conditions

In the practice, it is rare to find a direct railway connection between the supplier and the customer (for door-to-door service) or terminals (for terminal-to-terminal service). As a result, a further link to the receivers will be arranged as soon as the cargo train arrives at the railway station. Depending on the current situation of the route (e.g. there is no direct railway linkage between the station and the customer); there are alternative means of transport, e.g. trucks which are the most popular transport substitution in the practice. Due to their huge territorial coverage and flexibility, trucks are widely used in the collection and delivery. Therefore, the costs of operating of the railway freight generally consist of three parts: Costs of pre-rail haul, rail hauls and post-rail hauls. This structure of costs for railway freight with pre- and post-haul can be described. b. Technical Conditions

As mentioned earlier DynKo concentrates on the transport of oversized and heavy hauls by rail (of project logistics). According to the definition of heavy hauls on railway by International Heavy Hauls Association (IHHA), heavy machinery railway freight should meet at least two of the following requirements:

* Unit or combined trains of at least 5 000 metric tons;

* Revenue freight of at least 20 million gross tons per year over a given line haul segment comprising at least 150 km in length;

* Axle loadings of 25 tons or more

c. Legal Conditions

Because the cross-border issues of cargo railway are studied within the project, a common licence for the cargo train in different regions and countries plays a vital role so that the efficiency of rail freight could be increased. Within European Union (EU), all the member countries obey the uniform rules that the Intergovernmental Organization for International Carriage by Rail (OTIF) developed for the carriage of freight (CIM) and passengers (CIV). Some countries in Eastern Europe and Asia, take part in other organizations of international railway carriage, e.g. Russia and Kazakhstan are the member states of Organization for Cooperation of Railways (OSShD). In practice, there is always cooperation between these organizations, i.e. the countries. e.g. Poland, acknowledge both systems of law for rail, e.g. German cargo trains to Poland need not to apply for an additional operating licence for the train to Poland. Besides the operating licence, a possible special licence for regularly or contemplating operating the heavy hauls are also considered, particularly along the intensively studied railway routes within the project.

d. Possible Disturbance Variables

In the practice, there are countless elements that can positively or negatively influence the expected operating process of railway freight. Both kinds of impact on the logistic process can lead to the fluctuation in the supply chain. One of the typical affects is the Bullwhip-Effect which directly causes an increase on reasonable safety stock. A case that was provided by the main project partner vividly shows how the unexpected variables disturbed the normal operation:

A company in Romania consigned the project partner to transport 25 framework packages that were divided into three groups to be sent out respectively. However, the transport delayed for almost 10 days which was caused by the non-transparent rules of the consignee, the 1 license for the transport at the beginning, the 1 consulting for the railway carriage, etc.

This case study showed the complexity of organization and operation of cargo by rail. To achieve the best results of the disposition instrument as possible, all the possible disturbance factors should be considered and possibly quantized in the DSS according to their influence on the transport chain.

4 Summary

Within project DynKo, the circumstances for the disposition tool, DSS, are analyzed. Furthermore, the market in Eastern Europe of freight transport by rail is also considered in the DSS as an example for the applicability of the tool with customer- and costs-oriented aspects. Some essential conclusions can be derived from the results of the report regarding relevance with project logistics especially heavy freight transport for the DynKo project. Firstly, the potential of cargo train in the future will increase if the legislative, technical and infrastructure problems are solved or improved. The development of the quality of combined transport terminals and the infrastructure in Eastern Europe has been identified. Another important issue is the harmonization of conditions between transport modes. Secondly, the cooperation between regions and countries, not only from the political but also from business perspective, will be strengthened. At last, a DSS will be applied for the integration of all the market participants, including transport entrepreneurs, government, suppliers and customers and also increase transparency of information along the supply chain.

主站蜘蛛池模板: 一级成人a毛片免费播放| 性视频久久| 国产最新无码专区在线| 国产精品漂亮美女在线观看| 国产第三区| 午夜a级毛片| 亚洲精品天堂在线观看| 欧美v在线| 激情無極限的亚洲一区免费| 欧美啪啪一区| 久爱午夜精品免费视频| 日韩成人在线一区二区| 99九九成人免费视频精品| 毛片网站免费在线观看| 国产亚洲欧美日韩在线一区| 亚洲AV电影不卡在线观看| 青青草欧美| 国产美女精品一区二区| 亚洲国产精品美女| 青青操视频在线| 国产精品久久久久久影院| 欧美日韩国产系列在线观看| 国产精品尹人在线观看| 国产肉感大码AV无码| 国产美女丝袜高潮| 高清无码手机在线观看| 亚洲第一天堂无码专区| 999国产精品永久免费视频精品久久| 红杏AV在线无码| 中文无码精品A∨在线观看不卡| 欧美黄网在线| 色妞www精品视频一级下载| 久久久久88色偷偷| 人妻21p大胆| 国产黑丝一区| 在线永久免费观看的毛片| 激情综合五月网| 国产成人a毛片在线| 亚洲成人动漫在线观看| 国产资源免费观看| 日韩AV无码一区| 高清无码一本到东京热| 亚洲色欲色欲www在线观看| 99r在线精品视频在线播放| 国产精品3p视频| 久久毛片免费基地| 久久国产免费观看| 亚洲成年人片| 日韩国产欧美精品在线| 中国国语毛片免费观看视频| 日韩在线永久免费播放| 国产精品无码一二三视频| 亚洲天堂精品在线观看| 无码中文AⅤ在线观看| 99人体免费视频| 国产裸舞福利在线视频合集| 国产主播福利在线观看| 久久无码高潮喷水| 日韩无码一二三区| 色综合天天操| 亚洲va欧美ⅴa国产va影院| 日韩毛片视频| www.av男人.com| 亚洲欧美一级一级a| 色综合中文| 国产精品极品美女自在线看免费一区二区| A级毛片高清免费视频就| 国产精品第页| 精品人妻无码区在线视频| 国产免费一级精品视频| 免费国产不卡午夜福在线观看| 精品一區二區久久久久久久網站| 国产视频大全| 欧美一区精品| av大片在线无码免费| 伦精品一区二区三区视频| 免费无码AV片在线观看国产| 欧美一级爱操视频| 18禁影院亚洲专区| 欧美日韩在线亚洲国产人| 亚洲黄色视频在线观看一区| 有专无码视频|