Abstract:Inordertoaddressregional waterresourceshortages,thispaperfocusesontheoptimizationdesignofsmaldiameterprestressdconcretecylinder pipes (PCCP)forthe ShenshuiRiver Reservoir waterconveyanceproject.Byanalyzing the characteristicsoftheproject,theperformanceofPCCPmaterials,andconstructionconditions,areasonabledesignschemeis proposed.Theoptimizationprimarilytargetsaspectssuchaspipelinestructure,jointforms,andanti-corosionmeasureswithan aimtoenhancebotheconomiceficiencyandreliabilityoftheprojetTheresearchfindingsindicatethatsmall-diameterPCCP pipescanmtengineeringrequirements;throughoptimizeddesign,itisposibletoefectivelyreduceprojectcostswhile extending service life,providing a reference for similar water transmisson projects.
Keywords:smalldiameterPCCPpipe;ShenxiRiverReservoir;waterconveyance project;pipelinedesign;optimizationdesign
水資源短缺是制約區域經濟社會可持續發展的關鍵性難題,在水資源時空分布不均的地區尤為重要。實現水資源的高效調配與合理利用,已成為當前水利工程領域亟待解決的課題。深溪河水庫輸水工程作為緩解區域水資源供需矛盾的重點基礎設施項目,其設計方案的合理性、施工質量的可靠性與工程的經濟效益及穩定運行相關。近年來,預應力鋼筒混凝土管(Prestressed Concrete Cylinder Pipe,PCCP)因其優異的力學性能、卓越的抗滲能力以及較長的使用壽命,在輸水工程領域得到了廣泛應用。然而,傳統大直徑PCCP管在中小型輸水工程中面臨建設成本高、施工工藝復雜等問題,限制了其在更廣泛場景中的應用。針對上述問題,本文以深溪河水庫輸水工程為研究對象,采用小直徑PCCP管進行優化設計。通過系統分析工程區域的水文地質條件、管材力學性能及施工技術特點,提出了一套兼具經濟性與可靠性的輸水管線設計方案。研究重點聚焦于管道結構優化、接口形式創新及防腐措施改進等關鍵技術環節,旨在協同提升工程性能與經濟效益。
1 項目概況
本項目屬于小型(1)類別,最大壩體高度達到 63m 總庫容量為 2.779×106m3 ,調節庫容則為 2.08×106m3 。該水庫的正常蓄水位設定在海拔 1300m 處,而死水位位于 1275m ;壩頂高程則達到了 1305m 。此工程旨在灌溉約2.62萬畝(1畝約等于 667m2 的土地,并滿足1.61萬人的安全飲水需求,設計年供水量總計6.412×106m3 ,引用流量的設計值為 0.912m3/s. 。輸水系統的起點設于深溪河水庫大壩下游區域,隨后沿著河流走向鋪設至九門村灣口上方已有的引水隧道入口位置,再通過現有隧道延伸至龍橋村張家灣附近,最終形成2路分支:一路向紅烈方向輸送水資源,另一路則通往十兩坪地區。……