林恒雨



摘 要:深基坑開挖期間容易產(chǎn)生土體變形,需要適時進(jìn)行監(jiān)測。本文結(jié)合漳州市測繪地理信息中心建設(shè)工程項目,對基坑坡頂、周邊建筑等進(jìn)行監(jiān)測,分析了基坑監(jiān)測頻率、基坑監(jiān)測控制標(biāo)準(zhǔn)和險情預(yù)報。
關(guān)鍵詞:深基坑;位移;監(jiān)測
中圖分類號:TU753 文獻(xiàn)標(biāo)識碼:A 文章編號:1003-5168(2019)35-0104-03
Analysis of Deep Foundation Pit Monitoring Technology for
a Construction Project in Zhangzhou
LIN Hengyu
(Zhangzhou Design Research Institute of Surveying and Mapping,Zhangzhou Fujian 363000)
Abstract: Soil deformation is prone to occur during the excavation of deep foundation pits, and monitoring is needed at an appropriate time. Based on the construction project of Zhangzhou Surveying and Mapping Geographic Information Center, this paper monitored the pit slope and surrounding buildings, analyzed the pit monitoring frequency, the pit monitoring control standard and the danger forecast.
Keywords: deep foundation pit;displacement;monitoring
漳州市測繪地理信息中心建設(shè)工程由漳州市測繪設(shè)計研究院組織建設(shè),其主要從事城市測繪設(shè)計、科研、開發(fā)和應(yīng)用等基礎(chǔ)工作。項目位于漳州市龍文區(qū)龍溪南路西側(cè),占地面積約為1 300m3。該工程由地上六層辦公建筑和地下二層車庫組成。工程范圍內(nèi)無架空線路布設(shè),場地北側(cè)、西側(cè)有天然氣管線通過。基坑支護(hù)采用內(nèi)支撐支護(hù)形式,開挖深度約為7.390~9.060m。
1 基坑監(jiān)測項目及方法
基坑監(jiān)測的目的在于實時記錄現(xiàn)場數(shù)據(jù),并將監(jiān)測記錄與設(shè)計單位提供的設(shè)計值進(jìn)行對比分析[1]。當(dāng)監(jiān)測記錄的數(shù)值大于設(shè)計值且超出規(guī)范時,監(jiān)理單位應(yīng)及時反饋并采取措施,避免支護(hù)結(jié)構(gòu)的破壞以及其他事故。其間要以施工過程中的實時監(jiān)測記錄為基礎(chǔ),指導(dǎo)現(xiàn)場施工,實現(xiàn)信息化施工。
1.1 監(jiān)測項目
基坑監(jiān)測項目主要依據(jù)基礎(chǔ)工程的各種特點確定[2]。在進(jìn)行基坑設(shè)計時,本工程綜合考慮了基坑施工現(xiàn)場的環(huán)境、支護(hù)形式、支護(hù)工藝等因素,確定了7個監(jiān)測項目,如表1所示。
表1 基坑工程監(jiān)測項目
[序號 監(jiān)測項目 點數(shù) 備注 1 基坑坡頂水平位移 10 — 2 基坑坡頂豎向位移 10 — 3 深層水平位移(測斜) 7 — 4 地下水位 2 — 5 周……