【Abstract】Rolling dynamic compaction (RDC), which employs non-circular module towed behind a tractor, is an innovative soil compaction method that has proven to be successful in many ground improvement applications. RDC involves repeatedly delivering high-energy impact blows onto the ground surface, which improves soil density and thus soil strength and stiffness.

【Key words】ground improvement; rolling dynamic compaction (RDC); real-time monitoring; earthwork; instrumentation

The quality of earth structures highly depends on the compaction state of fill layers, which can be made up of a wide range of various materials,e.g. non-cohesive and cohesive soils, granular material, artificial powders, fly ashes, grain mixtures, and stabilized materials. Thus, both compaction equipment and compaction procedure need to be selected carefully taking into account the used fill material since compaction mainly contributes to achieve sufficient bearing capacity and uniform settlement behavior of the earth structure.

Ground Improvement is a technique that improves the engineering properties of the treated soil mass. Usually, the properties modified are shear strength, stiffness and permeability. Ground improvement has developed into a sophisticated tool to support foundations for a wide variety of structures. Properly applied, i.e. after giving due consideration to the nature of the ground being improved and the type and sensitivity of the structures being built, ground improvement often reduces direct costs and saves time.

Common issues seen today in the field are:

€Y孴he operator loses track of his passes and the job becomes guesswork

€Y孴he supervisor cannot monitor pass count performance and cannot verify accurate completion of the compaction job

€Y孖nconsistent density

€Y孶nder-compaction or over-compaction

€Y孭enalties, missed bonuses, premature road failure and legal issues

Recent developments for measurement and analysis of machine power response caused by changes in physical soil properties have the potential to change completely the future of earthwork construction. The technologies which allow engineers to record and supervise the compaction process and see the changes in physical and mechanical properties of soils have been developed, among them:

Intelligent compaction is the use of real-time measurements of the response of a compaction machine to provide on-the-fly adjustments to the machine parameters that affect compaction, such as drum vibration, amplitude, frequency, and roller speed. The beginnings of intelligent compaction can be traced to work in Sweden, where vibratory compactors were instrumented to measure the accelerations of drum roller during the compaction process.

The basic principle of a CCC system is to detect the soil stiffness by evaluating the motion behaviour of the drum. The parameters influencing the motion behaviour of the drum influence the values of CCC systems as well.

The operator can focus primarily on maintaining proper vehicle speed and rolling pattern. Another significant development in intelligent compaction has been the incorporation of global positioning system (GPS) technology and compaction operations. There are a number of advantages in the incorporating the two systems. Won-Seok et al. document two major advantages. One is that it allows an operator to compact a section freely without being restricted to a predetermined area inputted in a computer system.

Historically, measuring soil compaction during earthwork construction operations has been a key element to ensure adequate performance of the fill. Current state-of-practice relies primarily on process control (lift thickness and number of passes) and/or end-result spot tests using nuclear moisture-density gauge or other devices to ensure adequate compaction and proper moisture control has been achieved. While providing relatively accurate information, these inspection approaches have several disadvantages:

1.require continuous observation for method/process control;

2.offer measurements only for a small percentage of the fill volume (typically 1:1,000,000) for spot tests;

3. require construction delays to allow time for testing;

4.result in downtime for data analysis; and

5. cause safety issues due to personnel in the vicinity of equipment.

The compaction monitoring system has a lot of advantages. A significant advantage of the compaction monitoring system is that measurements are often output to a computer screen in the cab of the roller in real time to allow the operator to identify areas of poor compaction and make necessary rolling pattern changes. By making the compaction machine a measuring device and insuring compaction requirements are met the first time, the compaction process should be better controlled to improve quality, reduce rework, maximize productivity, and minimize costs. Productivity should be improved and delays for post process inspections could be avoided. Improved safety is an additional benefit due to reduction of people on the ground for inspection measurements.

The CIR technology is a reliable control and verification tool which is fully integrated into to the quality control process. The process captures the specification requirements as established by the design/consulting engineers, develops correlations between measured data and the specific engineering properties being measured and requiring control, establishes control limits, captures data and plots the results for verification.

The soil’s response to the load delivered by the drum is monitor and thanks to the fully integrated GPS, the indication of soil’s strength/stiffness all over the site during the earthworks is accurately produced.

The principle of continuous impact response (CIR) is simple and similar to that of Froumentin et al. who conducted field trials on a prototype compaction aid that utilized the global positioning system (GPS) technology. The system was dual frequency and had an accuracy of +1 cm. The cab was fitted with a GPS receiver, on board processor, and a touch-sensitive color graphic screen (11.5 x 8 in).

Like Froumentin et al. the CIR technology is used together with the continuous induced settlement (CIS) technology; the CIR measures and records the change in soil’s strength and stiffness and the number of passes while the CIS measures and records the continuous induced settlement, then a color-coded map of the two measurements can be generated. We have can distinguish two different frequencies, the first one comes from the CIR and the second one from the CIS.

A Global Positioning System (GPS) device allows the operator to quickly know the position of the roller equipment while operating. To display and save positions reported by a GPS device on the computer screen, the GPS device must have an input/output (I/O) interface. A GPS-compatible cable that connects to a computer is also needed.

The new generation GPS toolbar requires a communications (COM) port connection. The GPS Connection Setup dialog box will not recognize a GPS device connected via Universal Serial Bus (USB) port. Some GPS device manufacturers provide drivers to map the USB connection to a virtual COM port that then can be used. Bluetooth devices also can be configured to use a virtual COM port.

At the end of this analysis about real-time monitoring of improvement effect under rolling dynamic compaction (RDC), we have noticed that sensors and the global positioning system (GPS) are of great importance in the recent advanced technologies used by civil engineers in geotechnical engineering especially for earthworks. In order to design a new monitoring device, one should have some electronic, electric and mechanic skills which are very useful for the purpose. The drum is instrumented with the accelerometer or impactometer. The engineer should be able to read/interpret the map generated by the sensors and the GPS. The real-time monitoring of improvement effect under RDC avoids the loss of time and reduced costs. There still have the desire to design a new monitoring system which will further the progress of science.

主站蜘蛛池模板: 亚洲一级毛片免费看| 成人伊人色一区二区三区| 97se亚洲综合不卡 | 日韩视频福利| 91区国产福利在线观看午夜| 777国产精品永久免费观看| 国产成人资源| 亚洲第一成年网| 91小视频版在线观看www| 久久性视频| 欧美国产综合色视频| 国产地址二永久伊甸园| 国产99精品视频| 亚洲一道AV无码午夜福利| 三级视频中文字幕| 亚洲精品自在线拍| 一级香蕉视频在线观看| 激情综合婷婷丁香五月尤物 | 国产女人爽到高潮的免费视频| 久久亚洲高清国产| 亚洲成人精品| 欧美日韩高清| 好吊日免费视频| 欧美日韩一区二区在线播放| 亚洲bt欧美bt精品| 国产欧美日韩综合一区在线播放| 欧美亚洲国产视频| 亚洲欧美成人| 99无码熟妇丰满人妻啪啪| 欧美日韩动态图| 国产成人精品一区二区不卡 | 国产麻豆福利av在线播放| 99热线精品大全在线观看| 亚洲经典在线中文字幕| 欧美午夜小视频| 玖玖精品在线| 超清人妻系列无码专区| 无码av免费不卡在线观看| 女人av社区男人的天堂| 亚洲国产欧洲精品路线久久| 日韩a级毛片| 四虎精品免费久久| 婷婷久久综合九色综合88| 影音先锋丝袜制服| 欧美日韩北条麻妃一区二区| 青青草91视频| 欧美激情视频二区三区| 久久不卡国产精品无码| 午夜少妇精品视频小电影| 亚洲国产成人精品一二区| 国产精品无码影视久久久久久久 | 国产特级毛片| 亚洲国产系列| 高清色本在线www| 国产毛片不卡| 激情综合网址| 亚洲成a人片| 高清不卡毛片| 亚洲国产精品国自产拍A| 欧美怡红院视频一区二区三区| 国产精品久久自在自线观看| 熟妇无码人妻| 在线视频精品一区| 欧美日韩专区| 2021无码专区人妻系列日韩| 婷婷色丁香综合激情| 综合色在线| 国产美女人喷水在线观看| 欧美一级黄片一区2区| 精品国产91爱| 三上悠亚精品二区在线观看| 成人欧美日韩| 国产在线观看成人91| 中文字幕不卡免费高清视频| 亚洲国产中文欧美在线人成大黄瓜| 欧美日韩导航| 国产91全国探花系列在线播放| 欧美在线视频a| 亚洲欧美激情小说另类| 欧美自慰一级看片免费| 亚洲精品国产自在现线最新| 99re在线视频观看|