Analysis on Variation and Workload Confirmation Transmission System Optimization Cases

2017-12-26 00:05:48李成寶黃俊
環球市場信息導報 2017年33期
關鍵詞:工程

◎李成寶 黃俊

Analysis on Variation and Workload Confirmation Transmission System Optimization Cases

◎李成寶 黃俊

A large foreign project, one of the world's largest LNG plant construction projects, 36 core process modules in construction with a total weight of 200,000 tons approximately, project duration started from July 2014 and will be completed in July 2017. The variation and workload confirmation transmission management system is established and implemented with exploration and innovation in this project, the author elaborated variation and workload confirmation transmission system by extraction of optimized cases in order to provide a practical reference for variation and workload confirmation management work in oil and gas module construction projects.

Preface

Due to the particularity of variation and workload confirmation work in this large foreign project, the author perform classification management to the variation and workload confirmation transmission system which is divided into discipline engineering and mechanical and electrical installation engineering according to bidding and contract awarding mode.

Variation and workload confirmation transmission system optimization case analysis

Variation confirmation transmission optimization case

Current transmission path: 1 variation submitted by subcontractors (with paper variation account)-2 PMT discipline engineers review and sign-3 PMT document control engineers sort-4 subcontractors document control engineers register, receive, sign, distribute, and transfer to PMT after its leader’s signature-5 PMT document control engineers register, receive, sign, distribute to module managers for signature and transfer to design department-6 design department document control engineers register, receive, sign, distribute and transfer to PMT after its leader’s signature -7 PMT document control engineers register, receive, sign and distribute to PMT discipline engineers-8 PMT discipline engineers review and signleaders approve

Optimized transmission path: 4 subcontractors document control engineers register, receive, sign, distribute and transfer to design department after its leader’s signature-5 design department document control engineers register, receive, sign, distribute and transfer to PMT after its leader’s signature-6 PMT document control engineers register, receive, sign and distribute to PMT discipline engineers-7 PMT discipline engineers submitted to module managers for signature, then PMT discipline engineers review and submitted to leaders for approval

Workload confirmation transmission optimization case

At the early period of this project, PMT designate department A responsible for subcontracting management of mechanical and electrical installation engineering and small structure bulk materials division and transmission. During the process of implementation, it was discovered that column internals, electric heat tracing were unable to be divided by discipline. Afterward it was determined that functional management department A responsible for electric heating and PMT construction department A responsible for column internals. Due to subcontracting contracts signing and site actual situation, special workload confirmation sheet increasingly but document control engineers cannot confirm transmission direction according to documents. Afterward it was determined that PMT discipline engineers to make special mark on account, this method can effectively avoid the probability of error, mistake, omit and others in the process of transmission. After optimization, it was concluded that functional management department A responsible for discipline engineering subcontracting management, electric heat tracing and special workload transmission and signing work. PMT construction department A responsible for subcontracting management of mechanical and electrical installation project, bulk materials, column internals transmission and signing work in order to ensure each discipline workload confirmation transmission in good order and synchronously with variation confirmation transmission.

Conclusion

After years of development, domestic project management theory has basically formed a unique project management system and project management personnel have adequate knowledge about project management knowledge system. The author devotes himself into the practice, innovation and implementation of variation and workload confirmation transmission management system, and this paper extracted two optimized cases to perform analysis in order to provide a reference only for variation and workload confirmation and management work in oil and gas module construction projects.

(作者單位:海洋石油工程(青島)有限公司)

猜你喜歡
工程
《工程爆破》》征稿征訂
工程爆破(2022年3期)2022-07-26 01:58:56
《工程爆破》征稿簡則
工程爆破(2022年2期)2022-06-17 14:13:56
子午工程
太空探索(2016年6期)2016-07-10 12:09:06
工程
工程
工程
工程
工程
工程
工程
主站蜘蛛池模板: 亚洲bt欧美bt精品| 国产亚洲美日韩AV中文字幕无码成人 | 99久久人妻精品免费二区| 99爱在线| 国产又色又爽又黄| 人妻丰满熟妇av五码区| 欧美一级视频免费| 亚洲天堂免费| www成人国产在线观看网站| 毛片久久久| 国产精品乱偷免费视频| 欧美人与动牲交a欧美精品| 午夜三级在线| 欧美另类视频一区二区三区| 精品国产成人三级在线观看| 久久亚洲中文字幕精品一区| 97视频免费在线观看| 国产一区免费在线观看| 国产精品高清国产三级囯产AV| 日本三级欧美三级| 成年网址网站在线观看| 国产精品55夜色66夜色| 久久久久久久久18禁秘| 丁香五月激情图片| 亚洲国产综合精品中文第一| 日韩无码精品人妻| 青青草原国产免费av观看| 高清视频一区| 成人在线综合| 国内精品免费| 尤物特级无码毛片免费| 亚洲天堂免费| 亚洲国产在一区二区三区| 色老二精品视频在线观看| 99国产精品一区二区| 中文精品久久久久国产网址| 国产第一福利影院| 亚洲午夜片| 老色鬼久久亚洲AV综合| 亚洲综合天堂网| 免费人成在线观看视频色| 久久久噜噜噜久久中文字幕色伊伊| 婷婷五月在线| 久久久噜噜噜久久中文字幕色伊伊| 亚洲aaa视频| 国产成年无码AⅤ片在线| 2021精品国产自在现线看| 久久黄色视频影| 久996视频精品免费观看| 亚洲国产中文综合专区在| 尤物在线观看乱码| 色综合五月婷婷| 国产成人亚洲日韩欧美电影| 韩国福利一区| A级全黄试看30分钟小视频| 麻豆精品视频在线原创| 爆乳熟妇一区二区三区| 久久国语对白| 国产精品主播| 欧美高清国产| JIZZ亚洲国产| 国产亚洲精品va在线| 曰韩人妻一区二区三区| 国产欧美专区在线观看| 亚洲天堂在线视频| 欧美色图久久| 亚洲欧美在线精品一区二区| 亚洲欧美h| 麻豆国产原创视频在线播放| 亚洲第一黄色网| 性色一区| 国产精品污视频| 亚洲性影院| 天天色天天综合| 国产午夜无码片在线观看网站 | 青青草原偷拍视频| 丝袜久久剧情精品国产| 国产97区一区二区三区无码| 色婷婷天天综合在线| 波多野结衣爽到高潮漏水大喷| 99成人在线观看| 亚洲A∨无码精品午夜在线观看|