999精品在线视频,手机成人午夜在线视频,久久不卡国产精品无码,中日无码在线观看,成人av手机在线观看,日韩精品亚洲一区中文字幕,亚洲av无码人妻,四虎国产在线观看 ?

METHOD STATEMENT FOR HYDROSTATIC TEST DURING WINTER SEASON

2016-12-29 15:04:06祁迎春
環球市場信息導報 2016年25期
關鍵詞:關鍵點注意事項案例

◎祁迎春

METHOD STATEMENT FOR HYDROSTATIC TEST DURING WINTER SEASON

◎祁迎春

隨著“走出去”“走進去”國家戰略的實施,眾多的國內電建公司承接到國外電站項目,尤其是‘一帶一路’上的優質項目。本文以哈薩克斯坦冬季高寒地帶進行的水壓試驗為實際案例進行注意事項的論述以及關鍵點的安排,為類似的項目執行提供參考。

As more and more Chinese companies have signed and will execute the power plant projects overseas, it is very challenging to perform the work especially to have the hydraulic test in winter Season of rough area, this paper illustrate the typical example successfully demonstrated in this case.

1.Scope of Hydro-Test

The average temperature in China north areas during Winter season is relative lower than other areas, where the lowest temperature in record is -38℃ in the most rough days, therefore,there must be special measures to prepare and execute to control work quality and safety as well as to protect the boiler system and equipment after Hydro-Test.

This method described as follows will introduce the general measures and solution to conduct Hydro-Test in winter season, which is normally applicable to the construction work to be executed in China north areas in Winter season.

2.Construction conditions

analysis

The prefabricated panel materials will be normally used for the boiler building and turbine house, while the indoor temperature is rather difficult to control due to the freezing cold weather and big heat emission from windows and doors even possible air leakage.

On the other hand, it shall be also necessary to consider and take considerate measures to prevent any freezing and corrosive occurrence after the Hydro-Test in the roughly cold days, which will impact the normal schedule of boiler operation due to the heavy working loads to keep insulation and top sealing after the test.

Conclusively, the Hydro-Test to be conducted according to the Project Schedule through winter season will create challenging risks in safety for boiler equipment and pipes, by contrary, the subsequent construction work even normal operation will be delayed in schedule if postpone the Hydro-Test.

3.Preparation works before HyDro-Test

3.1 General Working Procedures for Boiler Hydro Test

The overall Air Tight Test shall be arranged and conducted for the whole boiler hydro system to test and clear all the possible defects existing in welding seams, piping and sealing, whereafter the boiler equipment shall be insulated properly.

The heating surfaces in boiler top and sealing shall be insulated and executed finally after the Hydro-Test to discover the potential quality defect and remedy the defects prior to Hydro-Test.

3.2 Temperature Analysis and Heating Energy Calculation

According to the temperature records of these 3 months in last year of local area, the average temperature and lowest temperature could be calculated,and then calculated the indoor requested temperature and heating load comparing with requested temperature design pressure.

Based upon the calculation and analysis, it shall be confirmed to decide the necessity of installation of additional heating facilities to preventany freezing damages when the boilers are not operating neither considering the heating emission from equipment and process pipes, temporary heating estimation.

3.2.1 Light Tube Heaters will be additionally installed around ash silos, horizontal SH in end shafts and horizontal RH to improve and maintain the temperatures inside boiler.

3.2.2 Coke furnaces will be arranged in boiler building elevation 0m and will be put into use when the temperature falling down -20℃ or the indoor temperature is lower than 5℃.

3.3 Typical HSE Control Points

HSE team will coordinate with construction boiler team to have full and overall inspections of boiler parts and equipment, and conduct the safety training and explanation to all the team members attending the Hydro Test.

HSE team shall arrange appointed personnel to observe the weather condition and checkthe extreme cases in history record.

HSE team will make earlier preparation for counter measures to cope with any error or fault in boiler start-up or site blackout or personnel shifts changing.

3.4 Temporary Protective Measures

Based upon the analysis of local history weather record in local area and monitor the recent weather conditions on site, HSE team and boiler construction team will inspect the overall enclosing and capping conditions again in boiler buildings, such as main gates, windows & doors, flue ducts and air duct inlets, etc.

3.5 Ambient Temperature Observing Work

Observing points will be installed properly in boiler elevation 0m, 18m,57m, 62m to observe the ambient temperature prior to the normal activities of Hydro Test to select the most suitable time to start Hydro Test.

4.PROCESS CONCTROL DURING HYDRO-TEST

4.1 Scope of Hydro-Test

This preliminary system including feeding pipes, economizer, water wall, start-up system, SH and boiler drainage, sampling, air discharging,Nitrogen system.The Reheating Steam system including LTRH, HTRH and attemperator, drainage, air discharging pipes.

4.2 Environment Temperature Observation

According to boiler design, there are none down headers and water discharging in Platen superheater,secondary superheater and vertical reheater, so the water from Hydrotest could not be drained completely from such said areas, therefore, the temperature in tubes, furnace and flue ducts of such heating surfaces will be concentrating observation to control the temperature again any freezing, the temperature shall be more than 5 ℃.

During the preparation stage before test, the indoor temperature in Boiler Building shall be heated up, and HSE team will organize to carefully check every position for the possible air and steam leakage, and ensure that the indoor temperature could be increased gradually and maintained well in the temperature ranges as required, refer to the temperature Curve as follows:

4.3 Temperature Maintaining for Test Water

The temperature control for test water to be pumped to the boiler tubes is the key of overall hydro test.

The tubes of all heating surfaces shall be kept in the ranking of 21℃ -70℃, therefore, the test water shall be controlled in the range of 70℃ -80℃when pumping the feeding up to boiler during hydro test process.

The boiler will be water flushed to clean all the foreign items and subject to inspection and acceptance. Condensing water makeup tank will be pumped full of water, and start heating procedure to control the heating temperature less than 90℃, Meanwhile, chemicals ammonia and acetaldoxime will be injected in ratio to take the sampling mixture subject to test acceptance for its concentration. The condensing water pump will be started up to feed the water to boiler, adjusting the pump recycle opening to keep the desal water flow at the current of 70t/h,maintaining the water tanks operating in higher water level with accepted chemical concentration.

The boiler inside water shall be maintained warmly ranking 25℃ -45℃ for the sake of requirement from metal tubes and for the convenience of manpower inside inspection. The water will be drained utilizing the highest point of discharging valve in bulging system to exchange the hot desal water.

Boiler water in the whole bulging system shall be calculated every hour during the lower pressure stage according to Boiler Water Pressure Curve, then ensure that each part of heating surfaces shall be raised up 35℃-40℃ to satisfy all the tube walls in the bulging system be kept accepted temperature.

The coke furnaces shall be put into use to present any impact from the ambient environment when its temperature lower than 7℃ in boiler elevation 0m, which is very critical to maintain boiler ambient temperature higher than 5℃ and water in tubes are higher than 21℃.

5.Protective measure post Hydro-test

Proper and compete protection measure shall be taken after the Hydro Test considering the continuous freezing weather conditions in the job site until March, therefore, the feeding water to boiler shall be heated and kept recycling, minimum recycle 1 time when the environment temperature falling down -25℃ and control the boiler tube temperature no lower than 8℃, surely the water could be changed to present any freezing as per the tube conditions.

The quantity of coke furnaces could be adjusted according to the weather conditions outdoor and boiler enclosing conditions to keep the boiler indoor temperature over 0℃ after the Hydro Test.

(作者單位: 中國機械工業建設集團有限公司 )

猜你喜歡
關鍵點注意事項案例
聚焦金屬關鍵點
夏季使用農藥注意事項
今日農業(2021年12期)2021-11-28 15:49:26
肉兔育肥抓好七個關鍵點
今日農業(2021年8期)2021-11-28 05:07:50
案例4 奔跑吧,少年!
少先隊活動(2021年2期)2021-03-29 05:40:48
注意事項
請四大名著的作者吃飯,有哪些注意事項
學生天地(2019年35期)2019-08-25 08:58:12
隨機變量分布及統計案例拔高卷
發生在你我身邊的那些治超案例
中國公路(2017年7期)2017-07-24 13:56:38
說明文寫作注意事項
一個模擬案例引發的多重思考
中國衛生(2015年4期)2015-11-08 11:16:06
主站蜘蛛池模板: 欧美亚洲国产日韩电影在线| 日本成人福利视频| 麻豆AV网站免费进入| 一边摸一边做爽的视频17国产| 亚洲二区视频| 91一级片| 婷婷综合在线观看丁香| 日韩最新中文字幕| 国内精品久久人妻无码大片高| 亚洲精品中文字幕午夜| 日韩国产一区二区三区无码| 亚洲熟妇AV日韩熟妇在线| 国产女人喷水视频| 免费A∨中文乱码专区| 国模视频一区二区| 久热这里只有精品6| 91麻豆精品国产91久久久久| 久热re国产手机在线观看| 国产综合日韩另类一区二区| 日日拍夜夜操| AV在线麻免费观看网站| 日韩高清欧美| 国产成人凹凸视频在线| 久久人体视频| 99久久国产综合精品女同| 国产三级成人| 午夜视频免费试看| 国产精品19p| 国产精品无码一二三视频| 国产va在线| 久久久久亚洲AV成人人电影软件| 欧美亚洲国产视频| 九九九九热精品视频| 中国精品自拍| 国产精品理论片| 青青极品在线| 精品国产污污免费网站| 国产主播福利在线观看| 精品撒尿视频一区二区三区| 99er精品视频| 美女一级免费毛片| 国产美女丝袜高潮| 欧美在线视频a| 尤物特级无码毛片免费| 国产h视频在线观看视频| a级毛片网| 有专无码视频| 日韩不卡高清视频| 色综合天天综合中文网| 日韩精品欧美国产在线| 日韩毛片在线播放| 九九九国产| 国产精品熟女亚洲AV麻豆| 亚洲嫩模喷白浆| 欧美一级99在线观看国产| 欧美激情视频二区| 欧美成人日韩| 亚洲aⅴ天堂| 在线看片免费人成视久网下载| 亚洲视频四区| 青青青草国产| 国产成人亚洲无码淙合青草| 五月天香蕉视频国产亚| 亚洲一区无码在线| 91av成人日本不卡三区| 亚洲人成成无码网WWW| 日韩欧美中文字幕在线精品| 无码中字出轨中文人妻中文中| 亚洲综合香蕉| 亚洲日本www| 国产h视频免费观看| 72种姿势欧美久久久久大黄蕉| 欧美日韩亚洲国产主播第一区| 国产精品成人第一区| 亚洲九九视频| 久久国产精品无码hdav| 国产日韩精品一区在线不卡| JIZZ亚洲国产| 中文字幕无码电影| 精品无码一区二区三区电影| 奇米精品一区二区三区在线观看| 一级黄色片网|