Design on Heavy Oil Wellbore Lift Simulation Experiment Device

2013-06-02 06:17:06WANGXiaomeiYUZhongshengDINGYouqingZHUXincai
機床與液壓 2013年18期

WANG Xiaomei ,YU Zhongsheng,DING Youqing,ZHU Xincai

1.Chongqing University of Science and Technology,Chongqing 401331,China;2.Chongqing University of Technology,Chongqing 400054,China

1.Introduction

The heavy oil exploitation is complex and high cost,and there are many rules have not been mastered.Heavy oil is Non-newtonian fluid.Its physical and chemical flow regularity is quite complex.Multiphase flow model used in engineering currently is obtained through thin oil(Newtonian fluid)flows based on the low pressure test or field test conditions.The model does not apply to heavy oil flow regularity.Therefore,experimental research in this field is an urgent need.It is necessary to develop a new experimental device to provide a scientific basis for understanding the mechanism and laws of heavy oil flow.This paper briefly introduces the structure design of a heavy oil wellbore lift simulation experiment device.

2.Structure of heavy oil wellbore lift simulation experiment device

The wellbore lift simulation experiment device is designed to be a modular small test simulation device.It consists of four parts,including mixing shear module module,module and circular pipe flow circulation module.

Each code illustrated in Fig.1 is shown in Table 1.

Fig.1 Basic structure of the experiment device

3.Characteristics of experiment device

The experimental device has the following features:

1)It can simulate the actual pumping process flow condition.The actual production process is a one-way fluid flow.

2)It realizes the cycle,avoids the dead zone,makes the mix more evenly and higher efficiency,and accords with the real condition.Especially because the static mixer requires one-way flow,it is dif-ficult to evaluate its characteristics if it uses reciprocating driving.

3)Due to the realization of circulation,it makes the heating insulation of the whole system more uniform.

4)The vertical lifting test process is more stable and can be repeated many times,which gets more accurate data.

5)Feeding and sampling are not affected by the volume effect,which is very convenient.

Tab.1 Illustration of each code

4.Instructions of experimental process

1)Experiment preparations

The heavy oil and treatment agent are respectively put into reservoir T2 and T3,and they are put in test requirements for heating and stirred to spare.The purpose of these preparations is to ensure that heavy oil has good fluidity,otherwise the metering pumps can not work normally.

2)Heavy oil flow test

①According to the set proportion to start metering pumps C1 and C2,heavy oil and treatment agent are mixed into reservoir T1.

② The test fluid is heated,stirred and mixed in T1,until it is mixed evenly.

③ Open the manual globe valves F3,F4(or F1,F2)and the electric globe valves K1,K2,and then open the manual globe valve F5 to make the test liquid flow down into the test piping and piston pump cylinder.

④Start the stepping motor DK.At the same time,respectively control the electric globe valves K1 and K2 on or off.It can make fluid in the pipe line further circulation process,and detect parameters until the mixed liquid meets the testing requirements.

⑤Test flow parameters of fluid in measuring section,including differential pressure in measuring section,total pressure in vertical section and fluid flow pipeline etc.And record the related data and test curve,until it reaches the experiment requirement.

⑥ Calculate the test results,analyze the related results,and display and print the test results report.

Note:According to the specific needs in the process of the flow test,respectively make the liquid flow through or not through the mixer.So simulate the actual working condition in the process of pumping which install underground mixer or not,and then make the related evaluation.

Mixture flows into lift module after single or multiple flows through the pump.In lift module,mixture liquid column can move up and down under the control of reciprocating pump,and related flow parameters are obtained through the measuring section.

Each module has its own test system,circulation system and temperature control system,can be run separately and determine the operating effects of various components,and can also analyze the overall effect of the wellbore lift after each module combination.And the corresponding facilities can realize the overall circulation.

3)Mixer flow testing experiment

①According to the set proportion to start metering pump C1 and C2,heavy oil and treatment agent are mixed into reservoir T1.

② Open the manual globe valves F3,F4 and the electric globe valves K1,K2,and then open the manual globe valve F5 to make the test liquid flow down into the test piping and piston pump cylinder.

③Start the stepping motor DK.At the same time,respectively control the electric globe valves K1 and K2 on or off.Pump mixed liquid to observation window G3 height position so far.

④ Shut down electric globe valve K2,and then start stepping motor/piston pump.According to the experiment requirements,make the mixture reciprocating flow through the mixer a certain number of times,and record related parameters(differential pressure in mixer section).At the same time,take the sample,analyze and evaluate the liquid mixing effect under the corresponding number of mixed times by open valve F6.

⑤Contrast and analyze the test results and the mixed effects,display and print the test results report.

Note:The mixed effect of mixer can also be evaluated directly by circulation flow test of mixing liquid under the same conditions.

4)Clean the test system.

①Open the manual globe valve F6 for the fluid discharge.

② Start metering pumps C1 and C2,and pump the residual heavy oil and the treatment agent into reservoir T1,then the mixture is discharged from valve F6.

③Add detergent respectively into the heavy oil reservoir T2 and the treatment agent reservoir T3,and carry out stirring and cleaning.

④ Close the manual globe valve F6,and then start metering the pumps C1 and C2.Mix the detergent into the mixture reservoir T1,and start stirrer and piston pump repeated cyclically to clean the entire pipeline.

⑤Open the manual globe valve F6 to make all detergent mixture flow out.

Note:The cleaning process can be repeated several times until the system pipelines and reservoirs are cleaned up basically.

[1]DU Dianfa,SHI Dayou,ZHANG Yuxiao,et al.Horizontal Wells Development Optimization in Supper Heavy Oil Reservoir[J].Petroleum Geology & Oililfield Development in Daqing,2009,28(6):96-99.

[2]CHEN Rongzhen.Introduction to Oil Drilling Machinery[M].Shangdong:Petroleum University Press,2001.

[3]CHEN Yuquan,GE Wenxun.Modern sensor principle and application[M].Beijing:Science Press,2007.

[4]CHEN Boshi.Electric Drive Automatic Control System-Motion Control System[M].Beijing:Mechanical Industry Press,2004.

主站蜘蛛池模板: 2020国产在线视精品在| 国产导航在线| 国产不卡国语在线| 狠狠做深爱婷婷综合一区| 小说 亚洲 无码 精品| 国产国语一级毛片| 97se亚洲| 亚洲精品爱草草视频在线| 日韩专区第一页| 最新痴汉在线无码AV| 色综合五月婷婷| 欧美成人a∨视频免费观看| 亚洲男女天堂| 亚洲欧洲AV一区二区三区| 亚洲欧美在线看片AI| 亚洲va精品中文字幕| 亚洲美女久久| 欧美自慰一级看片免费| 亚洲一区免费看| 欧美国产菊爆免费观看| 91免费国产高清观看| 蜜桃视频一区二区| 毛片久久久| 国产尤物jk自慰制服喷水| 超薄丝袜足j国产在线视频| 日本亚洲最大的色成网站www| 国内毛片视频| 99热最新网址| 高潮爽到爆的喷水女主播视频| 亚洲欧洲日韩综合| 国产网站一区二区三区| 久一在线视频| 亚洲国产看片基地久久1024| 中文字幕伦视频| 拍国产真实乱人偷精品| 久久精品国产电影| 国产亚洲美日韩AV中文字幕无码成人| 国产欧美视频在线| 久久久久久久久18禁秘| 国产91视频免费| 69av在线| 亚洲中文字幕久久无码精品A| 国产肉感大码AV无码| 天天激情综合| 五月六月伊人狠狠丁香网| 免费毛片全部不收费的| 日日噜噜夜夜狠狠视频| 亚洲乱伦视频| 亚洲成人网在线播放| 一级看片免费视频| 国产精品欧美在线观看| 蜜芽国产尤物av尤物在线看| 亚洲九九视频| 久久久久亚洲AV成人网站软件| 中日韩一区二区三区中文免费视频| 色婷婷久久| 国内精品小视频在线| 这里只有精品国产| 中文国产成人精品久久| 一级成人a做片免费| 无码专区在线观看| 亚洲欧美自拍视频| 九色在线观看视频| 日本一区二区三区精品国产| 国产a网站| 久久久久九九精品影院| 嫩草在线视频| 欧美全免费aaaaaa特黄在线| 成人看片欧美一区二区| 欧美第一页在线| 热这里只有精品国产热门精品| 亚洲综合第一页| 欧美成人综合视频| 亚洲男人天堂2020| 毛片免费高清免费| 久久五月天综合| 免费无码AV片在线观看中文| 欧美三級片黃色三級片黃色1| 国产精品原创不卡在线| 国产精品毛片在线直播完整版| 少妇露出福利视频| 欧美.成人.综合在线|