The Applications of the Least-Square Principle in the Security Quality Forecasts about Tunnel Project

2013-02-09 01:51:24OriginalAuthorXUXi
重慶與世界(教師發展版) 2013年1期

Original Author:XU Xi

From Application and Knowledge of Mathematics 2008(6)

(Mapping Department of Construction School of Chongqing Jiaotong University,Chongqing 400074)

Translator:DAI Qian

(Chongqing YUCAI Project Supervision Limited Company,Chongqing 400074)

In people’s lives,the variable research usually impacts them.In general,the variable research includes two types of relationship:function variable research and statistical variable research.The function variable relationship is certain one,one(or one group of)variable value is certain the only function value.The equation of variable is the accurate equation.Another relationship is an uncertain one.It means the independent variable and dependent variable influence each other strongly,but one dependent variable couldn’t ensure the only independent variable.The equation of this relationship is approximate equation[1].

A usual method of statistical relationship analysis is regression analysis method.The first step is building the approximate equation between dependent and independent variable based on observation data.It builds the fitting mathematical model.Then,checking effect and precision of model is necessary.If the model passes test,builders could forecast dependent values,confidence interval,etc by the model[2].

For avoiding fitting error when building model,the general equations include:

The Equation 3)is the least-square principle.Because its high sensitivity,it becomes the basic theory of the regression analysis.

Technically,the forecasting model,which is built by past variable rule,is the auto-regression model.Because the autoregression model is the summarize of past variable relationship,it should be efficient for future dependent and changing trend forecasting if other conditions no change.

1.Building modelby the leastsquare principle

Draw the curve graph(scatter diagram)by observation point.By the linear of curve,the builder should find possible model type(or types).With the possible type(or types),builders could fit the model.If the model is linearity,the way is finding regression coefficienta,bwith least-square and substituting them into the model;if the model isn’t linearity,builders need fit it to linearity firstly,then finding regression coefficient a,b with least-square and substituting them into the model.The final result is one or several primary model(or models).

Test is necessary for regression model.If there is only one primary model,the test only need check the significance of the model.If there are several models,the test would find the best significant one to preserve.

There are many methods for statistical test;the most common method is relativity test.

If the model isn’t linearity,the model need be translated to linearity model before relativity test.This job has finished when model built bya,b,so the relativity test is very simple.The relativity tests before or after linearity translations are the same.

Taking the data pointsxi,yi(i=1,2,3,…,n),the regression equation is:

1.1 The least-square forecasting for values of

The coefficient inverse matrix is:

1.2 relativity test of regression model

Related coefficients ofxi,yiis:

The absolute value ofrreflects linear relativity between yandx,the range is[ -1,+1].The conclusion is following:

For keeping the minimum linear relativity for fitting model,themust be larger than related test requirement(critical value).

Making the significance to α,variance ton- 2 as argument,builders could find the critical value ofrαin related coefficient probability distribution table.If,the model have enough significance on level α;if not,the model is wrong[3].

2.The real example

During or after tunneling,the hole should deformate.The possible situation includes arch settlement,side-well contraction,tunnel bottom bulging,etc.All these situations could be described by mathematical models.

In this article,the author uses the side-well observation data of Shuifu Tunnel in Yunnan Shui-Ma Highway as the example to analyze the application of least-square regression analysis on tunnel construction safety and quality monitoring and forecasting.

Generally,the deformation extent and speed of tunnel are fast and terrible in early period.As time goes by,changing extent should be lease and changing speed would be slow until them end finally.By this situation,the main factor,which should influence the tunnel deformation(includes side-well contraction),is time,so possible model types are index and logarithmic functions.

In the Graph 1,the relative convergence valueu(difference of convergence observation between first day and every other observation day)is the vertical coordinate and timetis horizontal coordinate.The author built a regression model by observation curve(Line 1 in Graph 1),which draw by first seven days’convergence observation(t=1~7 in Table 1).

Graph 1 The convergence deformation analysis curve graph

Table 1 Regression analysis table of 1stto 10thday

By linearity of Line 1,the author finds the equations:

The author uses these two equations to fit the model.

Making the logarithm change on both sides of Equ.(11),it is:

By Equ.(7),the author findsb= -5.439 8 and puts it into Equ.(13),the result isa= -1.717 6.Then,the author putsa、binto Equ.(11),the result is convergence index model:

By the same way,the author finds observations of first seven days(t=1~7)and puts them into Equ.(7).The result isb=1.9128.Putting it into Equ.(14),the author findsa= -6.373 9.Puttinga、binto Equ.(12),the convergence model is:

Puttingt=1~7 into Equ.(17),the result is convergence function value(or forecasting value).Based on the information,the author draws the fitting curve(Line 2).Linearities of Line 1 and Line 2 is similar.

The difference between observation and function result is the regression variance(v).The author puts them into Table 1 for fitting degree:

σ is smaller than 1 mm(the critical precision),so the Equ.(17)is efficient.

The author checks Equ.(17)by curve linearity,fitting degree and related index,all results prove that the equation is efficient.

On the 7thday,the author putst=8、9、10 into Equ.(17)for forecasting value.Comparing forecasting values and observation values of 8th,9th,10thday,all variances are not over 3 mm(the safety value in〈Technical Specifications for construction of Highway tunnel〉),so the observing is efficient.

Regression analysis of 1stto 13th:as the same way,the author compares the function values and observation values of ten days(t=1~10)in Table 2.

The author calculates the variance values(v)and puts them into the Table 2.In Table 2,the author chooses forecasting value of 8th,9th,10thday to draw Line 2,the result prove that Equ.(19)is significant.Then,the author putst=11、12、13 to calculate forecasting value of these three days.Comparing with observation of these three days,the author gets the variance values and puts them into Table 2.The result proves that the observing is efficient.

Regression analysis of 1stto 16thtime period:By calculate values oft=1 ~13 in Table 3 and related observation values,the author fitted the model:

The author calculates the variance values(v)and puts them into the Table 3.By the forecasting value of 11th,12th,13thday,the author draws the curve of forecasting curve.It proves that the Equ.(20)is significant.Puttingt=14、15、16 into Equ.(20)to calculate forecasting value of these three days.Comparing with observation of these three days,the author gets the variance values and puts them into Table 3.The result proves that the observing is efficient,too.

Table 2 Regression analysis table of 1stto 13thday

Table 3 Regression analysis table of 1stto 16thday

3.Conclusion

All above processes are the application of least-square regression analysis on tunnel construction safety and quality observing.It has advantages as rigorous logic,clear idea,distinct process and nice result.The forecasting rule and theory for mathematical model building are right,and the calculation process is un-complex.

The method in this article is not only useful for tunnel construction monitoring,but also suitable for bridge,highway construction safety and quality control.

Reference:

[1] Wang Xinzhou,Tao Benzao,Qiu Weining,et al.Advanced Surveying Adjustment[M].Beijing:Surveying and Mapping Press,2006.

[2] Bai Fengshan,Yao Huanmin,Li Chunling,et al.Mathematical Modelling[M].Harbin,Harbin Institute of Technology Press,2002.

[3] Wang Xuemin.Applied Probability and Satistics[M].Shanghai:Shanghai University of Finance and Economics Press,2005.

(責任編輯 魏艷君)

主站蜘蛛池模板: 欧美成人一级| 欧美日韩综合网| 日韩成人在线视频| 国产性生交xxxxx免费| 亚洲天堂网站在线| 日韩大乳视频中文字幕| 一本大道香蕉高清久久| 91麻豆久久久| 国产麻豆91网在线看| 国产永久在线视频| 欧美在线视频不卡| 日韩毛片免费观看| 茄子视频毛片免费观看| 欧美在线国产| 青青极品在线| 亚洲熟妇AV日韩熟妇在线| 久久久久亚洲精品成人网| 亚洲国产成人精品青青草原| 久久无码av三级| jijzzizz老师出水喷水喷出| 国产精品黄色片| 久久国语对白| 欧美不卡在线视频| 午夜一区二区三区| 欧美精品高清| 欧美在线精品一区二区三区| 99福利视频导航| 激情无码字幕综合| 亚洲熟女中文字幕男人总站| 伦精品一区二区三区视频| 成年人午夜免费视频| 国产xxxxx免费视频| 久久香蕉欧美精品| 亚洲免费毛片| www.99在线观看| 国产色爱av资源综合区| 中文无码毛片又爽又刺激| 亚洲v日韩v欧美在线观看| 亚洲伦理一区二区| 播五月综合| 亚洲欧洲美色一区二区三区| 中文字幕色在线| 欧美成人二区| 小13箩利洗澡无码视频免费网站| a在线亚洲男人的天堂试看| 免费无码又爽又黄又刺激网站| 久久国产精品国产自线拍| 欧美午夜一区| 高清精品美女在线播放| 国产高清在线精品一区二区三区| 国产爽妇精品| 波多野一区| 8090成人午夜精品| 国产精品永久在线| 欧美成人午夜在线全部免费| 亚洲无码91视频| 国产精品无码AV中文| 五月婷婷丁香色| 亚洲天堂视频在线免费观看| 伊人久热这里只有精品视频99| 少妇精品在线| 日韩中文精品亚洲第三区| 欧美日韩午夜| 国产天天色| 真实国产乱子伦视频| 91精品国产91欠久久久久| 婷婷午夜天| 欧美精品H在线播放| 午夜福利视频一区| 日本免费精品| 日韩第八页| 日韩无码白| 国产aaaaa一级毛片| 一级成人a毛片免费播放| 亚洲中字无码AV电影在线观看| 九色在线观看视频| 日本一区二区三区精品国产| 国产小视频免费观看| 中文精品久久久久国产网址 | 嫩草在线视频| 人妻无码中文字幕第一区| 自拍偷拍欧美|