Mitigating fire risks in hospitals: Are we primed and geared up?

2024-05-18 20:25:52RamanSharmaSrutiSharma
Asian Pacific Journal of Tropical Medicine 2024年3期

Raman Sharma ,Sruti Sharma

1Department of Hospital Administration,PGIMER,Chandigarh,India

2Department of Hospital Administration,Satellite Centre,Sangrur,PGIMER,Chandigarh,India

The recent incidents have confirmed that fires in COVID-19 hospitals have become a gruelling and nerve-testing challenge[1-3].The increased volumes of oxygen flow,abundance of inflammable alcohol sanitizers,wearing of inflammable kits,and abundance of equipment make it more acquiescent for such incidents and even difficult to control.The density of equipment (especially ventilators)“enriches” air with oxygen,thereby increasing the “combustion risk”.Due to the COVID-19 panic and stigma,the proactive and readiness of healthcare staff is often compromised.Furthermore,periodic maintenance,inspection of gadgets and firefighting installation is also compromised,putting it comparatively at more risk.The continuous training and fire drills,better coordination among stakeholders minimize the possibility of such potentially fatal problems,thereby making healthcare settings a safer environment for patients as well as healthcare providers[4,5].In response to this,preparedness for fire safety was assessed in one of the fully functioning dedicated COVID-19 hospital of North India in reference to NBC 2016,Part IV standards and strategies outlined by the WHO[6,7].

The hospital complies to laid standards,having Passive Fire Protection measures as one of the integral component of three vital componentsviz.structural,fire protection and fire safety in a building.Passive Fire Protection measures are aimed to contain or slowdown the spread through fire resistant walls,fire doors,fire resistant glasses,dampeners and fire proofing claddings.The facility has designated assembly point outside hospital building,fire control room,motorable pathway around the building as well as defined width of the corridors and staircase.The basement is equipped with fire pump house with jockey pump,main electrical driven pump,diesel pump and sprinkler pump.

Fire suppression is critical to circumvent and minimize losses.Fire alarm system,smoke and heat sensors,fire suppression measures(fire extinguishers,water hose reels,mist sprinkler systems,water sprinkler systems,smoke extractors) have been installed at appropriate places and distance to extinguish fire and minimize damages during evacuations.Each block of the building has separate fire escape route,fire curtain for compartmentation,smoke sensors and sprinklers below and above the false ceilings,wet risers,manual call points,public address system,signages and facility of emergency lighting system in case of power failures for corridors and escape routes.All these Active Fire Protection installations are checked/inspected on regular basis to mitigate the losses in case of any unprecedented exigency.

A comprehensive evacuation plan is crucial to save lives in emergency situations and all staff members shall be well versed and experienced in carrying out the process.The hospital’s incident commander is entrusted to determine the time frames for evacuation(depending on the nature of the threat),movement (horizontal/vertical),evacuation routes,level of evacuation (complete or partial evacuation) in the crisis situation to perform the necessary evacuation duties.Patient prioritization evacuation models(dependent on patient acuity,type of event prompting evacuation),evacuation transport equipment (blankets,wheelchairs,beds),patient special needs,prioritizing patients are most logistically and ethically challenging tasks involved.

Regular scheduled training and fire drill(s) are conducted to ensure that staff members are well versed of fire safety strategies and they can act proactively,safely,swiftly and systematically to meet out any sort of exigency.

The laid down building codes/guidelines are the basis of accreditation systems and shall be made mandatory and enforced in true letter and spirit to regulate safety of hospitals.

Conflict of interest statement

The authors declare that they have no conflict of interest.

Funding

The authors received no extramural funding for the study.

Authors’ contributions

RS,SS: Theoretical formalism,final version of the manuscript;RS:Supervised the project.All authors approved the final version of the manuscript.

Publisher’s note

The Publisher of theJournalremains neutral with regard to jurisdictional claims in published maps and institutional affiliations.


登錄APP查看全文

主站蜘蛛池模板: 国产在线视频自拍| 国产真实乱子伦精品视手机观看 | 国产又粗又猛又爽视频| 黄色网在线| 日韩午夜片| 美女啪啪无遮挡| 青青热久麻豆精品视频在线观看| 久综合日韩| 亚洲日本www| 国产乱视频网站| 97青青青国产在线播放| 国产乱子伦无码精品小说| 国产全黄a一级毛片| 亚洲国内精品自在自线官| 蜜芽一区二区国产精品| 国产精品xxx| 国产精品福利尤物youwu| 中文字幕资源站| aⅴ免费在线观看| 找国产毛片看| 久久成人免费| 国产一二三区在线| 亚洲视频免| 欧美精品在线看| 日韩在线视频网| 国产爽爽视频| 在线无码私拍| 四虎成人免费毛片| 国产自在线播放| 欧美成人怡春院在线激情| 91久久偷偷做嫩草影院电| 97视频免费在线观看| 91精品国产丝袜| 亚洲天堂网站在线| 日韩精品无码免费专网站| 色偷偷一区| 综合久久久久久久综合网| 538国产视频| 免费在线一区| 亚洲天堂免费在线视频| 2022国产无码在线| 91高清在线视频| 天天综合色网| 国产亚洲日韩av在线| 成年免费在线观看| 国产在线自在拍91精品黑人| 成年免费在线观看| 2020亚洲精品无码| 毛片网站在线看| 国产综合日韩另类一区二区| 亚洲精品大秀视频| 国产精品久久久免费视频| 国产极品美女在线| 中文字幕永久视频| 中文字幕无码中文字幕有码在线| 一级做a爰片久久毛片毛片| 日本AⅤ精品一区二区三区日| 久久人体视频| 性色一区| 人人爱天天做夜夜爽| 国产精品视频导航| 亚洲天堂网视频| 欧洲熟妇精品视频| 欧美亚洲欧美| 国产18在线| 久久夜色精品| 日韩中文字幕免费在线观看 | 精品福利视频网| 日本成人一区| 国产精品男人的天堂| www.av男人.com| 亚亚洲乱码一二三四区| 国产情精品嫩草影院88av| 久久综合成人| 国产免费久久精品44| 91久久青青草原精品国产| 精品久久久久久成人AV| 91福利一区二区三区| 国产精品三级专区| 国产亚洲精品资源在线26u| 国产精品真实对白精彩久久| 久久96热在精品国产高清|