摘" 要:裝配式疊合管廊是近年來又一綜合管廊工程的重大技術(shù)突破。其原理是將管廊構(gòu)配件在預(yù)制廠預(yù)制好裝到板車后再運(yùn)輸?shù)绞┕がF(xiàn)場,通過現(xiàn)場拼裝而形成的一種施工工藝。跟普通的管廊構(gòu)件相比,裝配式疊合管廊技術(shù),實(shí)現(xiàn)了規(guī)模化生產(chǎn)、輕量化拼裝,減少現(xiàn)場資源投入,符合綠色施工,縮短工期,降低成本,成型后廊體外觀質(zhì)量優(yōu)良,可免二次裝修。
關(guān)鍵詞:疊合管廊;拼裝工藝;吊裝驗(yàn)算;預(yù)制裝配式;施工流程
中圖分類號:TU990.3" " " 文獻(xiàn)標(biāo)志碼:A" " " " " 文章編號:2095-2945(2023)28-0141-04
Abstract: The prefabricated stacked pipe gallery is another major technological breakthrough in recent years for integrated pipe galleries. The principle is to prefabricate the pipe gallery components in the prefabrication plant, install them on board trucks, and then transport them to the construction site, forming a construction process through on-site assembly. Compared with ordinary pipe gallery components, prefabricated stacked pipe gallery technology achieves large-scale production, lightweight assembly, reduces on-site resource investment, conforms to green construction, shortens construction period, reduces costs, and has excellent appearance quality after forming, which can avoid secondary decoration.
Keywords: composite pipe gallery; assembly technology; hoisting checking calculation; prefabricated assembly type; construction process
隨著我國市政工程的快速發(fā)展,市政綜合管廊逐漸成為一種新型施工工藝,疊合管廊就是其中一種,其中構(gòu)件如何定位、吊裝、現(xiàn)澆混凝土是管廊成型的關(guān)鍵。本文就安南路(濱海東大道—翔安大道段)的疊合管廊拼裝為例,對管廊拼裝、混凝土澆筑、構(gòu)件吊點(diǎn)的驗(yàn)算進(jìn)行分析,為今后類似工程提供相關(guān)經(jīng)驗(yàn)。
1" 項(xiàng)目概述
本文以翔安南路(濱海東大道-翔安大道段)的疊合管廊拼裝為工程實(shí)例。2020年,翔安南路疊合管廊開始施工,該項(xiàng)目位于翔安區(qū),西起濱海東大道,東至翔安大道,總長約4.147 km。其中疊合裝配式預(yù)制拼裝2.873 km,構(gòu)件尺寸及長度詳見表1。
2" 管廊拼裝工藝流程
2.1" 工藝步驟流程
相關(guān)工藝步驟流程如圖1所示。
2.2" 工藝說明
2.2.1" 安裝準(zhǔn)備
提前構(gòu)件進(jìn)行編號,根據(jù)圖紙安裝的順序,按照編號所對應(yīng)的構(gòu)件類型進(jìn)行布置。
2.2.2" 測量放線
現(xiàn)場按照安裝位置,用專用測量儀器在混凝土墊層上用墨斗線精準(zhǔn)彈出疊合內(nèi)外墻、疊合底板等的安裝位置[1]。……