Numerical Analysis of Three-Layer Deep Tunnel Composite Structure

2021-04-27 10:29:22WeiweiSunHongpingMinJianzhongChenChaoRuanYanjunZhangandLeiWang

Weiwei Sun,Hongping Min,Jianzhong Chen,*,Chao Ruan,Yanjun Zhang and Lei Wang

1Hubei Key Laboratory of Theory and Application of Advanced Materials Mechanics,School of Science,Wuhan University of Technology,Wuhan,430070,China

2China Construction Third Bureau Green Industry Investment Co.,Ltd.,Wuhan,430035,China

3Fujian Lutong Pipe Technology Co.,Ltd.,Quanzhou,362000,China

ABSTRACT To date,with the increasing attention of countries to urban drainage system,more and more regions around the world have begun to build water conveyance tunnels,sewage pressure deep tunnels and so on.However,the sufficient bearing capacity and corrosion resistance of the structure,which can ensure the actual service life and safety of the tunnel,remain to be further improved.Glass Fiber Reinforced Plastics(GFRP)pipe,with light weight,high strength and corrosion resistance,has the potential to be applied to the deep tunnel structure.This paper proposed a new composite structure of deep tunnel lined with GFRP pipe,which consisted of three layers of concrete segment,cement paste and GFRP pipe.A new pipe-soil spring element model was proposed for the pipesoil interaction with gaps.Based on the C3D8R solid model and the Combin39 spring model,the finite element numerical analysis of the internal pressure status and external pressure stability of the structure was carried out.Combined with the checking calculation of the theoretical formula,the reliability of the two finite element models was confirmed.A set of numerical analysis methods for the design and optimization of the three-layer structure was established.The results showed that from the internal GFRP pipe to the outer concrete pipe,the pressure decreased from 0.5 to 0.32 MPa,due to the internal pressure was mainly undertaken by the inner GFRP pipe.The allowable buckling pressure of GFRP pipe under the cover of 5 GPa high modulus cement paste was 2.66 MPa.The application of GFRP pipe not only improves the overall performance of the deep tunnel structure but also improves the construction quality and safety.The three-layer structure built in this work is safe and economical.

KEYWORDS GFRP pipe;deep tunnel structure;finite element analysis;internal pressure;external pressure stability;pipe-soil interaction

1 Introduction

As the result of the current increasing engineering requirements and more complex geographical environment,the tunnel structure has been further investigated around the world.The optimization design of the tunnel structure is an important direction of continuous development,such as the Kanda Deep Tunnel,Tokyo “underground temple,” Kuala Lumpur Tunnel,Thames Sewage Tunnel,Yellow River Crossing Tunnel and so on [1–5].In the structural scheme of Wuhan Great East Lake Deep Tunnel,multi-piece precast concrete segments were used as the external pressure bearing structure.In order to withstand the pressure of water delivery,avoid external groundwater leakage and internal water delivery corrosion,cast-in-place reinforced concrete was used as the secondary lining.However,there are some construction difficulties and quality risks in the implementation of this scheme,such as multiple procedures,long construction period,large risk of sealing and anti-corrosion in segmented pouring,which have certain influence on the reliability of sewage transportation.Glass Fiber Reinforced Plastics (GFRP) pipe,as a composite material pipe with light weight,high strength,corrosion resistance and excellent hydraulic properties,has been widely used in various industries such as municipal,marine,and nuclear power [6–8].At present,this kind of pipe or material has been used in some major new tunnel lining or renovation projects,such as the Northern Sewerage Project (NSP)-the largest and most complex sewage tunnel project in Australian history,and the Northside Sewer Relief Tunnel(NSRT) in Houston [9,10].The NSP project used DN1600-DN2500 GFRP pipes as the lining of the deep tunnel,with a length of 12.5 km and a design life of 100 years.In the NSRT project,approximately 8 miles of DN3000 GFRP pipes were used to refurbish the original HDPE lining that had fallen off due to corrosion.

The multi-layer composite structure has been applied more and more in engineering construction.Many existing methods of multi-layer structure analysis were based on the assumption of a through-the-thickness distribution of displacements,the derivation of strain and stress,and the application of virtual work principle.At present,more scholars use finite element method to establish the calculation model of composite laminar structure,most of which are based on the equivalent single-layer theory (ESL).From the classical laminated plate theory (CLPT) [11],the first-order shear deformation theory (FSDT) [12],to the higher-order shear deformation theory(HDST) [13],lateral deformation capability becomes more and more accurate with the increasing model complexity,but it is not sensitive to the single layer of laminated structure.Layer-wise theory can accurately describe the interlaminar stress and strain of composite laminated structures,but the calculation cost will increase as the number of layers [14].

The methods of pipe-soil interaction usually include contact surface method,PSI element method and spring element method.The contact surface method defines the contact of the pipesoil solid model,which used to be the static analysis due to its large computational cost and difficulty in convergence during large deformation.Through the way that one side shares nodes with pipeline and other side represents the soil surface,PSI element comprehensively considers the contact surface property of the pipe-soil and the deformation characteristics of the soil,which simplifies the analysis process,but this element only has displacement freedom degree.The spring element method reflects constitutive relation of the soil by defining stiffness coefficient of the spring,which means that the soil around the pipe is discretized into springs distributed at a certain interval,without the need to establish the soil entity.Chen et al.[15] adopted the Link180 model to solve the problem between buried structure and surrounding soil,but it cannot simulate the special case of existing gap between the pipe and soil.Through the definition of the F-D value of the combin39 spring element,the pipe-soil interaction with gap required in this paper can be simulated.Kim et al.[16] conducted a finite element analysis on the structural performance of buried GFRP pipes,in which the Mohr–Coulomb failure criterion was adopted for soil conditions and linear elastic modeling was adopted for the beam element of GFRP pipe.Rafiee et al.[17]established a comprehensive model to evaluate the long-term creep of composite structures under constant load,and obtained the overall deformation and stress–strain distribution of the pipe through numerical calculations.Gherlone [18] performed a finite element analysis of the static response,free vibration and critical loads of the sandwich structure by using the mixed Refined Zigzag Theory model.

2 Formulation of the Problem

This paper proposed a three-layer deep tunnel composite structure lined with GFRP pipe,which was composed of concrete segment with high resistance to external pressure,GFRP pipe with high resistance to internal pressure and cement paste,as shown in Fig.1.The application of GFRP pipe improves the overall performance of the tunnel structure.Compared with the traditional cast-in-place prestressed reinforced concrete,it simplifies the construction process of cast-in-place and thus greatly improves the quality and safety of construction.The outer layer of the actual structure is a rigid reinforced concrete segment with strong resistance to external pressure,and the construction of internal structure is carried out after the concrete segment construction has been completed for a period of time,the main load of inner lining is internal water pressure.

Figure 1:Schematic diagram of three-layer structure

Based on the finite element analysis of solid element model and the checking calculation of elastic mechanics theory formula,the basic characteristics of deep tunnel composite structure under internal pressure were analyzed.Based on the finite element analysis of the pipe-soil spring element model and the checking calculation of the buckling formula of M45 manual,this paper carried out research on the external pressure stability of the GFRP pipe with the gap between the soil and the pipe.The transfer law of internal pressure and strain from inside to outside and the allowable buckling pressure with gaps in tube-soil interaction were obtained to evaluate the safety and reliability of the structure and guide its structural design.The three-layer composite structure gives full play to the high external compressive strength of outer layer and high internal compressive strength of inner layer,which is a safe and economical structure.

3 Internal Hydraulic Analysis of Three-Layer Structure

3.1 Finite Element Analysis of Internal Hydraulic

In the analysis of pipe-soil interaction,the contact surface method is the most accurate solution,which can clearly see the stress distribution cloud diagram of the entire pipe and soil.In this paper,the contact surface method of solid elements was used to analyze the internal pressure of the three-layer structure.According to the structure size and material parameters of the deep tunnel composite structure lined with GFRP pipe,the finite element analysis model of the three-layer structure was established by ABAQUS finite element analysis software.

In ABAQUS,the types of solid elements based on stress-displacement are the most abundant.The 8-node hexahedral linear reduction integral element-C3D8R was adopted,and the contact pair properties of frictionless and hard surface contact were adopted.The calculation results of displacement by linear reduction integral element are more accurate,and the analysis accuracy will not be greatly affected when there is distortion or large deformation of mesh.The dimensions and material parameters of the three-layer structure were shown in Tab.1.The finite element analysis model 1 was shown in Fig.2.Constraint types were axial constraints on two end faces,x-direction constraints on the upper and lower sides,and y-direction constraints on the left and right sides.After applying the internal pressure of 0.5 MPa,the stress and strain of each layer were obtained,as shown in Figs.3 and 4.The specific value of the stress–strain results was shown in Tab.2.

Table 1:Dimensions and material parameters of three-layer structure

Figure 2:Finite element Model 1 for internal pressure analysis

In this paper,another set of simulations was performed to verify the reliability of the above simplified constraints.The three-layer structure was embedded into the surrounding elastic medium,that was,solid elements of soil with modulus 15 MPa were established outside the threelayer structure.Internal pressure of 0.5 MPa was applied inside to observe its mechanical response.Also,there was only continuum mechanics,and there was no elastic mechanics.The finite element analysis model 2 was shown in Fig.5.The constraint types were full constraints at the bottom and axial constraints at the two end faces.The stress–strain cloud diagram of Model 2 were obtained,as shown in Fig.6.The stress–strain results of each layer obtained by Model 2 were basically consistent with model 1,as shown in Tab.3.

Figure 3:Stress results of three-layer structure

3.2 Theoretical Analysis Based on Elastic Mechanics

The three-layer structure proposed in this paper was composed of concrete segment,Cement paste and GFRP pipe.Under the action of internal pressure P,the pressure,stress and strain of each layer were deduced through elastic mechanics theory.The theoretical calculation model of three-layer structure was shown in Fig.7.

For the convenience of analysis,the three-layer structure was divided into 1~3 layers from the outside to the inside,the material parameters and pressure of each layer were parameterized.ai,bi,ti,qia,qib,Ei,?ia,?ib,σia,σibwere the inner radius,outer radius,thickness,internal pressure,external pressure,modulus,internal strain,external strain,internal stress,and external stress of theith layer respectively.According to the stress–strain relationship and the coordinated relationship of deformation,the calculation formulas for the strain and stress of each layer were derived through elastic mechanics,as follows:

Figure 4:Strain results of three-layer structure

where,Hi,Ii,JiandKiwere the calculation coefficients set in this paper,which could be calculated according to the following formula:

where,qiaandqibwere the internal pressure and external pressure of theith layer respectively.When the internal pressure of innermost layer wasPand the external pressure of outermost layer is 0,q3awas equal toP,q1bwas equal to 0,q3bandq2bwere calculated according to the following equation:

Table 2:The stress–strain results of finite element model 1

Figure 5:Finite element model 2 for internal pressure analysis

The material parameters of the three layers were shown in Tab.1.The relevant data were substituted into the formula to calculate the stress and strain of each layer,and the theoretical calculation results were shown in Tab.4.

Figure 6:Stress–strain cloud diagram of Model 2

Table 3:The stress–strain results of Model 2

The basic characteristics of the three-layer structure under the action of internal pressure P were analyzed by numerical simulation of finite element and checking calculation of theoretical formula.According to the requirements of different materials,sizes and working conditions,we can continuously optimize the structural design through a set of numerical analysis methods established by solid element model and theoretical calculation formula.The stress–strain results of each layer obtained by finite element analysis and theoretical calculation are consistent,the external hoop strains of the concrete segments are 60.52 and 62.40μ?respectively,the external hoop strains of the GFRP pipe are 100.2 and 95.31μ?respectively,the errors are respectively 3.01% and 5.13%.When the internal pressure is transmitted to the outermost concrete segment,it is reduced from 0.5 to 0.32 MPa,and the internal pressure is mainly borne by the innermost GFRP pipe.The mutual verification of theoretical formula and finite element analysis confirms the reliability of the C3D8R solid element model in this paper.

Figure 7:Theoretical calculation model of three-layer structure

Table 4:Theoretical calculation results

4 External Pressure Stability Analysis of GFRP Pipe

4.1 Finite Element Analysis Based on Pipe-Soil Spring Element Model

Considering the influence of water seepage in the outer structure,a new spring element model of pipe-soil interaction was proposed to analyze the external pressure stability of GFRP pipe,and the allowable buckling pressure with gaps was obtained.In the three-layer structure,GFRP pipe is surrounded by cast-in-place cement paste,which is equivalent to a high modulus soil cover,and does not need to consider the impact of buried depth andin-situsoil.There is often a gap between GFRP pipe and cement paste,its value varies with construction method and quality.In general,the construction gap can be 0.2 mm when the pipe is filled with compacted concrete and carefully grouted.

There are many elements that can be used to simulate springs in ANSYS finite element analysis software,and they have their unique applications in many aspects,such as link180,combin39,and combin40.The link180 element is defined by two nodes,cross-sectional area,mass per unit length,and material properties.It can simulate the soil around the pipe,but it cannot simulate the special case of existing gap between the pipe and soil.The combin39 spring element is a unidirectional element with nonlinear function,defined by two nodes and a generalized forcedeformation curve,as shown in Fig.8.In the structural analysis,the points (D1,F1,etc.) on the curve represent the relationship between force and translational displacement or the relationship between moment and rotational displacement.By the definition of real constants,force and deformation values of up to 20 points in the curve can be input.Through the definition of the F-D value of the combin39 spring element,the pipe-soil interaction with gap required in this paper can be simulated.The derivation formula of the stiffness coefficient k of combin39 is as follows:

where,E1is the elastic modulus of the spring element (Pa),Ais the cross-sectional area of the spring element (m2),L1is the length of the spring element (m),Esis the elastic modulus of the soil around the pipe (Pa),andRis the radius of the pipe (m).

Figure 8:Generalized force-deformation curve

In the spring element model of pipe-soil interaction,GFRP pipe was established by shell63 element,and the combin39 element was established through the nodes on the surface to simulate the cement paste,as shown in Fig.9.The constraints applied by the GFRP pipe were axial constraints on the middle plane,x-direction constraints on the upper and lower sides,and y-direction constraints on the left and right sides.Fixed constraints were applied to the ends of the spring elements.The constraint diagram was shown in Fig.10.The external pressure of 1.0 MPa was applied to GFRP pipe,as shown in Fig.11.

The external pressure stability of GFRP pipe under the soil condition of low modulus without gap and high modulus with gap was analyzed respectively.The first-order stability coefficient was extracted to obtain its critical external pressure,as shown in Fig.12.The calculation results were shown in Tab.5.Under the soil condition of 5 GPa high modulus with 0.2 mm gap,the stability coefficient of the GFRP pipe was 2.66 and the allowable buckling pressure was 2.66 MPa.

Figure 9:The spring element model of pipe-soil interaction

Figure 10:Constraint of the spring element model

Figure 11:External pressure of the spring element model

Figure 12:Diagram of stability analysis results

Table 5:Calculation results of the spring element model

4.2 Theoretical Analysis Based on M45 Specification

The American Water Works Association (AWWA) Manual M45,Fiberglass Pipe Design,contains detailed information on the design,specification,procurement and installation of fiberglass pipe and fittings.The M45 manual is usually used for reference and planning of new fiberglass piping design projects.For buckling analysis of buried pipes,the appropriate external load should be equal to or less than the allowable buckling pressure.Due to the restraining effect of soil around the pipe,the external radial pressure that causes the buckling of buried pipe will increase a lot.The allowable buckling pressure in the M45 manual is determined by the following formula [19]:

where,qais allowable buckling pressure (kPa),FSis design factors,ris average radius of pipe(mm),Cnis scalar calibration factor (0.55),EIis stiffness factor per unit length of pipe wall(N m2/m),andφsis factor to account for changes in stiffness of compacted soil (0.9),Msis composite soil constraint modulus (MPa),kvis modulus correction factor,andRhis factor for depth of fill.

The M45 buckling formula does not consider the gap between pipe and soil,and is often used to calculate the allowable buckling pressure of buried pipe under low soil modulus,such as 3 and 5 MPa.In this paper,the allowable buckling pressure of GFRP pipe under low soil modulus was calculated by the M45 buckling formula in order to verify the reliability of the pipe-soil spring element model.Due to the effect of the concrete segment and cement paste,the influence ofin-situsoil and filling depth need not be considered,FS,kvandRhwere set as 1,0.74 and 1 respectively.Combined with the material parameters in Tab.1,allowable buckling pressures of GFRP pipe were 0.376 and 0.529 MPa respectively under the coverage of low modulus’soil with 3 and 5 MPa.Allowable buckling pressures obtained from pipe-soil model and M45 formula were shown in Tab.6.

Table 6:Comparison of calculation results

5 Conclusion

Based on the numerical analysis of finite element and the verification of theoretical formulas,the following research conclusions were obtained in this paper.

A new deep tunnel composite structure lined with GFRP pipe was presented.Based on solid element model,pipe-soil spring element model and theoretical formulas,a set of numerical analysis methods for evaluating the safety and reliability of the structure and guiding its structural design and optimization were proposed.

In internal pressure analysis,the internal pressure was mainly borne by the innermost GFRP pipe.The errors for the external hoop strains of the concrete segments and the GFRP pipe were respectively 3.01% and 5.13%.The stress–strain of each layer obtained by finite element analysis and theoretical calculation was basically consistent,which confirmed the reliability of the C3D8R solid element model in this paper.

A pipe-soil spring element model was proposed to analyze the external pressure stability of GFRP pipe under the soil condition of 5 GPa high modulus with 0.2 mm gap,and allowable buckling pressure of GFRP pipe was 2.66 MPa,which met the external pressure requirement of deep tunnel.

Under the soil condition of 3 and 5 MPa low modulus,the allowable buckling pressures obtained by the M45 were 0.376 and 0.529 MPa,the allowable buckling pressures obtained from the pipe-soil spring element model were 0.367 and 0.558 MPa,with errors of 2.39% and 5.48%,respectively,which confirmed the reliability of the pipe-soil spring element model.

The outer lining of the three-layer structure was concrete segments with high resistance to external pressure,and the inner lining was GFRP pipe with high resistance to internal pressure.The three-layer structure gave full play to the characteristics of the material.The application of GFRP improved the overall performance of tunnel structure.Compared with the traditional cast-in-place prestressed reinforced concrete,it simplified the construction process and greatly improved the quality and safety of construction,which was a safe and economical structure.

Funding Statement:This project was supported by the Fundamental Research Funds for the Central Universities (WUT:2018IB001) and the Fundamental Research Funds for the Central Universities (WUT:2019III130CG).

Conflicts of Interest:We declare that we do not have any commercial or associative interest that represents a conflict of interest in connection with the work submitted.

主站蜘蛛池模板: 亚洲高清在线播放| 91视频日本| 亚洲女同欧美在线| 国产小视频在线高清播放| 999国产精品| 好久久免费视频高清| 国产激情无码一区二区免费| 欧美午夜视频| 色综合国产| 午夜a视频| 四虎国产精品永久一区| 在线观看视频一区二区| 亚洲男人天堂2020| 国产a v无码专区亚洲av| 性做久久久久久久免费看| 久久久亚洲色| 国产成人高清精品免费5388| 亚洲人成影视在线观看| 欧美在线精品怡红院| 91九色国产porny| 成年片色大黄全免费网站久久| 中文字幕乱码中文乱码51精品| 国产天天射| 五月婷婷丁香综合| 亚洲成人一区在线| 日韩中文精品亚洲第三区| 欧美日韩亚洲国产主播第一区| 亚洲自拍另类| 久久久精品国产亚洲AV日韩| 国产一二视频| 无码AV日韩一二三区| 毛片在线播放a| 日本不卡在线| 国产福利免费在线观看| 毛片基地视频| 亚洲综合激情另类专区| 国产手机在线ΑⅤ片无码观看| 中国国产高清免费AV片| 超碰aⅴ人人做人人爽欧美| 尤物精品国产福利网站| 久久99国产综合精品女同| 狠狠色丁香婷婷综合| 亚洲综合18p| 国内精品久久九九国产精品| 91成人试看福利体验区| 欧美五月婷婷| 亚洲 欧美 偷自乱 图片| 91精品视频在线播放| av在线无码浏览| 国产日本视频91| 无码中文字幕精品推荐| 99精品热视频这里只有精品7| 免费jjzz在在线播放国产| 久久毛片网| 国产jizz| 亚洲av无码人妻| 最新痴汉在线无码AV| 日本在线亚洲| 色婷婷综合在线| 亚洲一级无毛片无码在线免费视频| 欧美不卡视频在线观看| 国产特级毛片aaaaaaa高清| 中文字幕亚洲综久久2021| 狠狠色成人综合首页| 亚洲国产中文欧美在线人成大黄瓜 | 日韩av无码精品专区| 日韩国产 在线| 综合亚洲色图| 国产毛片基地| 色综合中文综合网| 九九九精品视频| 欧美成一级| 日本黄色a视频| 性色一区| 亚洲精品无码久久久久苍井空| 四虎影视无码永久免费观看| 国产免费看久久久| 久久a级片| 中文字幕伦视频| 在线高清亚洲精品二区| 国产不卡国语在线| 永久免费av网站可以直接看的 |