建筑設計:戴維斯及合伙人建筑事務所

1 病房區/Patient bays
科羅拉多會議中心臨時護理中心位于科羅拉多州丹佛市,被打造成一座擁有2000 張床位的醫療機構,以應對新冠病毒疫情對該市造成的病床需求激增。展覽大廳層可容納病情穩定的新冠陽性患者,為其在出院前提供氧氣。該項目需要一種實際的設計構建交付方法,采用模塊化設計,使用了毗鄰中央護士站約3m×3m(10ft×10ft)的病患隔間。貯藏及輔助空間位于每排病房的盡頭。每個展廳均設有患者淋浴室。一間小藥房坐落在中心地帶,由位于會議中心低層的主藥房供給?,F有的中庭空間被重新用作員工休息室,而F 展廳則被用于放置員工儲物柜和員工淋浴設施。消防部門要求設計團隊使用防火建筑材料,使得該中心不同于全國的其他設施。最后,團隊共使用了25,330 塊石膏板墻、35,695 根金屬龍骨、長約9.7km(6 英里)、14 噸重的輸氧管道、逾32km(20 英里)的應急電源管道、可前往每間病房的護士呼叫站以及其他眾多材料,全部在18 天內交付。(王單單 譯)

2 患者淋浴室/Patient shower rooms

3 整體平面/Overall floor plan
The Colorado Convention Centre Alternate Care Facility in Denver, Colorado was designed and built as a 2000-bed facility to respond to the rapid demands that the COVID-19 pandemic placed on the City. The Exhibit Hall level houses and supports COVID positive patients who are in stable condition needing oxygen prior to fully discharging them to their homes. The pace of this project required a handson design build delivery method. The design was modular using 10×10 ft patient bays located adjacent to central nurse stations. Supplies and support spaces were at the ends of each patient row, and patient showers were installed in each Exhibit Hall. A small centrally located pharmacy was fed by a main pharmacy on the lower level of the Convention Centre. Existing atrium spaces were re-purposed for Staff Lounges, and Exhibit Hall F was used for staff lockers and staff shower facilities. This facility is different from others built around the country as the fire department required the team to use fire-resistant building materials. In the end, the team used 25,330 sheets of drywall, 35,695 metal studs, 6 miles (14 tons) of piped oxygen, over 20 miles of conduit for emergency power, a nurse call station to every patient room and many more materials. All were delivered in 18 days.

4 患者洗手站/Patient hands wash station

5.6 施工過程/Construction process

7 病房內景/Patient room interior

8 病房區/Patient bays
項目信息/Credits and Data
地點/Location: 美國科羅拉多州丹佛市/Denver, Colorado, USA
客戶/Client: 科羅拉多州/State of Colorado
主持建筑師/Principal Architects: Ann H. Adams (On-site Design Principal), Scott Nevin (Principal in Charge), Peter Carlson (Support Principal)
設計團隊/Design Team: Guadalupe Cantu, Lauren Cooper, Tina Du Mond, Emily Johns, Jeff Leland, Collin McDougall, Abby Noble
合作/Collaborators: United States Army Corp of Engineers, ECC, Hensel Phelps, Davis Partnership Architects, Fentress Architects, RMH Group, Maxon Engineering
暖通、電氣及給排水工程/MEP Engineers: RMH Group
總承包/Contractor: Hensel Phelps
材料/Materials: 石膏板墻,鋼龍骨/Drywall, Steel Studs
建筑面積/Floor Area: 約53,605 m2/577,000 ft2
設計周期/Design Period: 18天/18 days
建造時間/Construction Period: 2020.04
竣工時間/Completion Time: 18天/18 days
繪圖/Drawings: ?Davis Partnership Architects
攝影/Photos: ?Vic Moss courtesy of Hensel Phelps Construction