Transient Pipe Tension Influence on Dynamic Positioning Control During S-Lay Installation

2019-12-10 01:06:16AIShangmaoLIUDepengLIPengMAGang
船舶力學(xué) 2019年9期

AI Shang-mao , LIU De-peng , LI Peng,2, MA Gang

(1. College of Shipbuilding Engineering, Harbin Engineering University, Harbin 150001, China; 2. CNOOC CENER Tech Company Oil Production and Service Branch, Tianjin 300457, China)

Abstract: Traditionally, dynamic positioning (DP) capability and tensioner capability of a laying vessel are calculated by static tension while the dynamic effects are either ignored or taken into account by empirical load amplification factors. A coupled dynamic model of normal S-lay was developed to simulate the closed-loop automatic control process integrating with DP controller. The model sufficiently takes account of the pipeline-rollers contact and the coupling between the pipeline and the controlled surface vessel. By conducting dynamic simulation in time domain and comparing the results achieved, significant coupled dynamic behaviours of applied DP thrust forces are observed, which offers very intuitive evidences of the transient tension effects concerning DP capacity assessment. And tensioner capacity based static results of the tension force would be overestimated.

Key words: S-lay; coupled analysis; transient tension; dynamic positioning

0 Introduction

S-type pipelay operations in deepwater are much more complicated than those in shallow water, and put greater demands on the laying equipment. Normal pipelay starts after completion of the start-up operation when the start-up head touches down on the seabed. Deepwater installation vessels typically require a dynamic positioning (DP) system due to its good performance and the simplified operation procedures for the station-keeping.

The governed parameters for an S-lay configuration include the pipe material properties,tension at the pipelay vessel, stinger shape (curvature radius and roller positions), departure angle and water depth[1]. Among these parameters, tension at the vessel is the only parameter that can be manipulated during the installation by adjusting the vessel position or the holding force of tensioners. The free spanning part from the touchdown point to the stinger gets longer when the water gets deeper. This will make the free spanning pipeline heavier. In order to maintain the sagbend configuration, a large tension force has to be applied to the pipe in order to secure a safe bending radius. Also, when the stinger guides the pipe as it bends from horizontal to the inclination, a more curved stinger is required to guarantee that the pipe does not reach the end of the stinger for the steepest expected departure angle[2].

To avoid losing the pipeline, the applied tension of the pipeline must be less than the workable tension limitation of tensioners. Additionally, the thrusters of a dynamic positioning (DP)system must have the capability to compensate for the external tension forces of pipe acting on the vessel. Traditionally, DP capability and tensioner capability of a laying vessel are calculated by static tension while the dynamic effects are either ignored or taken into account by empirical load amplification factors. This representation lacks the detailed understanding of dynamic interactions between the pipe and the DP station-keeping. A dynamic simulation in timedomain coupled with DP controller is significant to identify limiting environmental operation conditions and to analyze any risk associated with thruster saturation or thruster failures[3].

Some researchers have already emphasized the dynamic effect of the vessel motion on the spanning pipeline, such as Clauss et al (1992)[4]and Gong et al (2014)[5]. However, it is worth mentioning that the dynamic effective tension is still relative to the DP thrust force, because the DP system must compensate for the horizontal drag force of the pipeline. The purpose of this study is to analyze the transient tension effect when integrating S-lay operations with DP demand, since deepwater S-lay operations are a closed-loop automatic control process.

1 Numerical model of the pipeline

Fig.1 Lumped-mass discretization model of the S-lay simulation

A variety of techniques and methods have been developed for decades to analyse the response of marine pipelay system in a dynamic sea environment. the state-to-art computation programs coupled by increasing computer capacity have provided sufficient accuracy of prediction and simulation in spite of existence of uncertainties due to pipe-soil interaction. Herein, the code orcaflex is chosen to implement S-lay analysis because of its friendly interface with Matlab environment, which allows us to use a limited range of OrcaFlex’s facilities for adding the dynamic positioning (DP) tasks.

In the global coordinate system (XYZ), the ending point P0of the pipeline anchors on the flat seabed, while the point PNcontacts with the tensioner at the other end as shown in Fig.1.The axial stiffness of the line is modeled by simple spring elements between nodes, and bending is modeled by rotational springs. The pipeline is discretized into N elements (Ek, k=1…N)by N+1 lumped-mass nodes (Pi, i=0…N).

The lumped-mass of each element is concentrated on the nodes while the tension and the bending are modelled by extensional and rotational springs. The nonlinear stress-strain relationship of the pipeline is characterized by a load-dependent path of moment-curvature. In the Orcaflex, the Ramberg-Osgood formula is used, which has the following expression

The effective tension at the mid-point of line segment can be calculated as

where Twis the function relating axial strain to wall tension, Piand P0are the internal and external pressure respectively; Aiand A0are the internal and external cross-section areas of the stress annulus respectively; and ν is Poisson’s ratio. The upward contact forces between pipe and seafloor are included in the model while friction effects are neglected.

In practical situations, some of the rollers may miss the pipe contact, resulting in more concentrated forces acting on a fewer number of rollers. If astern/ahead loading acts on the vessel, the rollers can be simplified to a rigid line. Thus the stinger contact search becomes pointwise and depends on the minimum distance d shown in Fig.1.

2 Controlled motion equation of pipelay vessel

2.1 Motion equations in time domain

The exciting force FVon the right hand side including the environmental load, propulsion forces in DP system and the pipeline reaction force acting on the vessel is written as

The standard procedure for performing pipelay dynamic analysis consists of two stages. A static analysis is first applied with only the static components of the environmental loadings.The initial equilibrium positions of the vessel are defined as the static positions of the ends of pipelines. The governing motion equations of the pipeline are highly non-linear, and should be solved iteratively using an incremental correction approach.

The dynamic solution of Eq.(3) may contain spurious high frequency response, a feature inherent in the finite element method. The generalized-α integration scheme has controllable numerical damping which is desirable since it removes this spurious, non-physical high frequency response. This numerical damping also leads to much more stable convergence and hence allows for longer time steps and much faster simulations.

2.2 PID controller and thrust allocation

The thrust forces confine a vessel to pinpoint in a certain permitted range. The Proportion-Integration-Differentiation (PID) controller is herein adapted to control the pipelay vessel motions. The total thrust forces FDPin the PID controller consist of three components: surge, sway and yaw forces, formulated as

where ε=η-ηrefis the vessel position error, KP, KIand KDrepresent proportional gain coefficient, integral gain coefficient and differential gain coefficient. The function of the PID controller takes instant position η as input, and outputs the magnitude of thrust force. An effective way for filtering the oscillatory components of motion is Kalman-Filter[6].

After the thrust system receives the commanded force signal, thrusters produce proper forces and moment to compensate for the environmental loads. Considering a marine vessel equipped with m azimuth thrusters, the generalized force vector is given by

The vector u contains the magnitude of the force produced by each individual thruster, αiis the azimuth of the iththruster, and the ithcolumn of the matrix is given by

where (lxi, lyi)is the location of the iththruster. The quadratic programming (QP) method is used for the optimal thrust allocation algorithm.

2.3 Coupled solution with transient tension

The pipelay model comprises three distinct components: the vessel, the pipeline and a set of connecting contact springs. In this numerical simulation, all forces are not assumed to be feedforward terms but transient forces coupled with the PID controller. The vertical component of pipe reaction force acting on the vessel is passively compensated by the pipelay vessel restoring forces; the horizontal tension of the spanning pipeline is left to active control by the vessel motion control system.

The S-lay simulation is developed from integrating a marine systems simulator (MSS),which contains guidance, navigation, and control blocks for real-time simulation by using Matlab libraries[7]. Based on the framework of MSS, the pipeline, vessel and DP system are integrated into a closed loop. And the flowchart of the simulation code for pipelay vessel motion controlled by DP system is summarized in Fig.2.

Fig.2 Flowchart of MSS code for vessel motion controlled by DP system

3 Cases studies

3.1 Parameters and conditions

Major particulars of the DP pipelay vessel are summarized in Fig.3 and Tab.1 (obtained from Yuan et al[8]and Sun et al[9]). There are seven azimuth thrusters in the pipelay vessel,thrusters #1 and #2 are main thrusters with downgraded maximum thrust 734 kN in the aft of the vessel. Five retractable thrusters are optimized for bollard pull, and the maximum thrust of each retractable thruster is 530 kN. Assuming the vessel is fully actuated, the available control input is the vessel thruster data limited to surge, sway and yaw.

Tab.1 Major particulars of ‘HYSY 201’

All studied cases are performed on a pipelay operation in 1 500 m water depth. The properties and input parameters of the laying pipeline are listed in Tab.2, and environmental conditions are shown in Tab.3. An idealized fixed stinger is connected to the stern for launching the pipe into the water at a suitable curvature. The pipeline is laid from 6.2 m below the main deck level at the stern of the barge for the radius of 110 m. There are 20 rollers mounted on the stinger section as shown in Fig.4, in which the rollers are numbered from up to down. It should be pointed out that the aim of performing such cases is to investigate the coupling or transient effect on operation simulation integrating DP demand; the capability of HYSY201 is not our focus, since the realistic parameters of the stinger structure and rollers position equipped on the HYSY201 are very different from the present model.

Tab.2 Pipe properties and parameters in studied cases

Tab.3 Environmental conditions in studied cases

Fig.4 Arrangement position of the rollers in the pipelay simulation

3.2 Transient results and discussions

Firstly two transient coupled simulations are implemented by using the different PID coefficients. Fig.5 shows the contact results between rollers and pipeline in the case with high PID coefficients, indicating that Rollers 17 and 20 are not in contact with the pipe. The time-history results of vessel surge motion and the top tension shown in Fig.6 demonstrate that different PID coefficients lead to different vessel motion, and the DP controller is efficient to keep the vessel around the target position. Few varieties of the statistical tension are observed from both cases with low PID coefficients and high PID coefficients. The reason is that both of the vessel motions are still very small compared to the water depth.

Fig.5 Statistic value of contact spring forces acting on 20 rollers of stinger

Fig.6 Comparison of time history results between low PID and high PID case

Fig.7 Time history statistics results of pipe bending stress along arc length

In the following, the dynamic contribution is discussed based on the results with low PID coefficients. Here a ratio defined by (Max-Mean)/Mean is used to investigate the dynamic contribution for bending stress and tension force of the pipeline.

The maximum bending stress in the overbend and the sagbend sections is shown in Fig.7.The maximum bending stress in the overbend section predicted from the coupled analysis differs from mean value by the ratio of 1%~2%. It can be concluded that the coupled dynamic approach has little dynamic effect on the stress safety assessment of pipes compared to the static state approach, since the overbend stress is much larger than the other part. The large variations of bending stress are observed in the lift-off point zone (about 200%) and touchdown zone(9.28%).

Fig.8 Time history statistics results of effective tension along arc length

Fig.9 Time histories of transient tension force (T0) at the bottom end of the pipeline with low PID coefficient

Fig.8 demonstrates the pipe effective tension and dynamic contribution along the whole arc length. Large variations of the dynamic tension are observed, the ratio at most positions exceeds 37%. At the touchdown zone the ratio rises to 60.4%. Thus the dynamic contribution is significant for the effective tension.

Lastly it is necessary to investigate the transient tensions of two pipe-ends, since the two tensions are directly related to the tensioners and DP system. According to statistics value of the tension at the top end of the pipe (Point PNin Fig.1), the dynamic maximum tension of the high PID case is 44.3% higher than the mean value (shown in Fig.6a). It is noted that this transient tension force TNexceeds nominal allowance tension capacity 4 000 kN of the blocked tensioners. On the other hand, the dynamic effect of the tension force T0(shown in Fig.9) is also remarkable, with 66.5% larger than the mean value.

4 Conclusions

Simultaneous prediction of the transient tensions on the structural, motion response and DP force provides useful insights into S-lay operations in this study. The numerical model integrates the major aspects related to normal deepwater S-lay operation including the structural behaviour of the pipe, a roller-pipeline interaction, the DP forces via a PID controller and Kalman filter, and the loose coupling between the pipe structural response and the vessel motion response. The major contributions of this study are summarized as follow:

(1) A PID controller and Kalman Filter are integrated into the pipelaying motion equations in time domain. This coupling approach can be used to effectively predict the pipeline transient tension, surface vessel motion and required thrust force of the controller simultaneously to ensure operation safety.

(2) Numerical simulation results showed that the dynamic contributions are more significant for the tension force at the top of the pipeline than for the stress and strain of the pipeline structure. Tensioner capacity based static results of the tension force would be overestimated.

(3) Numerical simulation results offer very intuitive evidence of transient pipe tension effects on deepwater S-lay DP thrust. A coupled analysis approach in deep water is therefore recommended for the prediction of DP thrust forces to compensate the horizontal pipe tension.

主站蜘蛛池模板: 欧美一区精品| 国产91视频观看| 国产黑丝视频在线观看| 2020国产精品视频| 亚洲福利一区二区三区| 久久精品亚洲热综合一区二区| 国产精品久久自在自线观看| 青青青视频91在线 | 国产激情无码一区二区三区免费| 亚洲侵犯无码网址在线观看| 99这里只有精品免费视频| 毛片网站观看| 久久久久久高潮白浆| 亚洲欧美不卡中文字幕| 久久国产乱子| 日韩专区欧美| 成年人久久黄色网站| 亚洲国产综合第一精品小说| 自偷自拍三级全三级视频| 综合五月天网| 欧美成人亚洲综合精品欧美激情| 四虎综合网| 国产乱子伦精品视频| 色综合天天综合中文网| 亚洲色图综合在线| 亚洲欧洲日产国码无码av喷潮| 亚洲水蜜桃久久综合网站| 欧美天堂在线| 波多野结衣亚洲一区| 国产激情影院| 韩国v欧美v亚洲v日本v| 亚洲成人黄色在线观看| 少妇精品网站| 日本精品影院| 丁香五月婷婷激情基地| 国产精品欧美亚洲韩国日本不卡| 久久美女精品| 综合色在线| 国产簧片免费在线播放| 伊人久久久久久久| 亚洲Aⅴ无码专区在线观看q| 久久久久久久久久国产精品| 亚洲欧洲日韩综合色天使| 国产综合精品日本亚洲777| 亚洲欧洲日韩综合色天使| 久久婷婷六月| av在线手机播放| 午夜限制老子影院888| 国产区福利小视频在线观看尤物| 永久在线精品免费视频观看| 国产精品福利在线观看无码卡| 无码久看视频| 亚洲天堂网在线视频| 99中文字幕亚洲一区二区| 9啪在线视频| 日本免费福利视频| 日韩在线播放中文字幕| 国产人免费人成免费视频| 最新日韩AV网址在线观看| 成人免费一级片| 亚洲男人天堂久久| 日本爱爱精品一区二区| 国产一区二区三区精品欧美日韩| 欧美成人国产| 97国内精品久久久久不卡| 免费jjzz在在线播放国产| 久久五月天综合| 亚洲a免费| 丁香婷婷综合激情| 欧美色亚洲| 极品性荡少妇一区二区色欲| 亚洲欧美日韩精品专区| 日韩福利在线视频| 国产精品人成在线播放| 岛国精品一区免费视频在线观看| 亚洲成a人片77777在线播放| 国产成人亚洲毛片| 午夜性刺激在线观看免费| 高潮毛片免费观看| 亚洲最新地址| 国产最爽的乱婬视频国语对白| 亚洲爱婷婷色69堂|