999精品在线视频,手机成人午夜在线视频,久久不卡国产精品无码,中日无码在线观看,成人av手机在线观看,日韩精品亚洲一区中文字幕,亚洲av无码人妻,四虎国产在线观看 ?

ABSTRACTSOF SELECTED ARTICLES

2019-02-13 09:01:27
石油石化節能 2019年1期

Research on Wastewater Treatment Technology of Xinjiang Oilfield

ZHONG Zhiying,MA Yao,HU Yuanyuan,ZHU Xinjian(Engineering Technology Research Institute of Xinjiang Oilfield Cmpany)2019,9(1):01-04

Abstract:With the large-scale application of the volumetric fracturing development model,Xinjiang Oilfield expects a sharp increase in the amount of wastewater in the next five years,of which fracturing and returning fluid accounts for more than 50%of the total operating wastewater.At present,the treatment of operating wastewater in Xinjiang oilfield mainly relies on the centralized treatment station that has been built,because the wastewater treatment process has not been considered during the design of the sewage treatment station.After the operation wastewater is recycled to the sewage treatment system,it will cause a great impact on the system and seriously affect the water discharge index of the sewage treatment system.By analyzing the technical status of wastewater treatment in Xinjiang oilfield,this paper proposes a technical scheme to adapt to the“classification classification” of wastewater in Xinjiang oilfield,which not only realizes the resource utilization of wastewater,but also ensures the stable operation of the sewage treatment system.

Key words:Xinjiang Oilfield;working wastewater;subclass classification;processing technology;reinjection processing

Laboratory TestAnalysis of Ultrasonic Treatment of Oily Sludge

ZHANG Xiaodan,GAO Mancang,GAO Lujun,XU Shuo,YANG Jinhui(Fifth Oil Production Plant of HuabeiOilfield Company in CNPC)2019,9(1):05-08

Abstract:with the increasing efforts of national environmental protection,oil sludge from oil fields has been included in the national hazardous waste list.Before,most oil fields and oil-related enterprises simply piled up and buried oil sludge in the open air,which had a serious impact on the environment.In order to solve this problem,ultrasonic processing of oil tank bottom sludge,the size is obtained by orthogonal experiment the effect of different factors respectively ultrasonic frequency>ultrasonic power>reaction temperature>reaction time,followed by a single factor experiment with orthogonal experiment for refinement and validation,got in ultrasonic power of 45 w,40 KHZ ultrasonic frequency,reaction temperature 55℃,reaction time 15 min oil removal rate under the condition of the best.

Keywords:ultrasonic wave;frequency;power;reaction time;reaction temperature

Study On Energy Saving Optimization Of Associated Gas Gathering In SananArea Wang Yanjuan(Natural Gas Branch in Daqing Oilfield Co.,Ltd)2019,9(1):09-10

Abstract:in the Sanan area of Daqing Oilfield,the gas source of the Nanba cryogenic unit was originally supplied by the Sanan turbocharging station,the middle 14th line and the south eight line.Through the analysis and study on the construction of associated gas gathering system and its operation status,During the normal operation of the unit,the optimized scheme of point to point direct supply of associated gas is put forward by using the pressure energy of the associated gas booster station in Sanan area,and the South II-2 pressurized gas transmission is directly supplied to the south eight cryogenic device.The Sanan supercharging station only starts when the equipment is overhauled and malfunctions,thus reducing the operation time,reducing the power consumption of the unit, and improving the quality, efficiency and benefit of the production plant in Sanan area.

Keywords:Sanan area;associated gas;gas gathering

The Technology Study of Increasing Speed and Reducing Cost in Deep Well of Daqing Oilfield

QUAN Junsheng(No.3 Drilling Company of Daqing Oilfield Drilling Engineering Company)2019,9(1):11-14

Abstract:Expanding exploration in daqing oil field camp deep strata of the city and shahe group development have a large number of natural gas resources,but these strata belong to glutenite,rhyolite,such as development strata,strong abrasive,high geothermal gradient,hard and soft formation, and the formation cementation ability is poor, easy leakage occurred in drilling,borehole collapse and drilling fluid performance degradation,such as complex,the drilling cycle in more than four months.For this case,the daqing oil field in well bore structure design,bit type,speed up tools development and drilling treating synthetic study,eventually formed the expanding deep Yu Daqing oil fields will be accelerated the formation of form a complete set of technology and craft,make greatly improve drilling speed,drilling cycle shortened more than 37 days on average than before application to speed up technology,drilling cost saving more than 15%,and also save a lot because of lost circulation,borehole collapse accident and increases the drilling cost,etc.The integrated application of the speed-increasing technology and related technology provides technical support for realizing the goal of accelerating,improving quality,lowering cost and increasing efficiency in deep Wells of daqing oilfield.

Keywords:deep well;high temperature;Increase speed;Hydrodynamic flushing;deep drilling

Feasibility Study on Wind Power Complementary Power Supply System of Pumping Unit in Daqing Oilfield

ZHANG Xiaolei(Technical Supervision Center of Daqing Petroleum Administration Co.,Ltd)2019,9(1):15-17

Abstract:In Daqing oil fields,the energy comsumption of pumping unit hold larger proportion in the holistic cost of oil fields.The administration department are highly interested in energy conservation and many energy-efficient technologies are adopted,thus saving a lot of energy and reducing production costs inside certain period.However,in the course of developing many hindering factors have appeared in the evolution.The wind-power hybrid power system is designed in accordance with actual production requirement and also has many characteristics such as security, energy saving, environmental protection and so on.According to development tendencies of Daqing oil fields,we can project that the wind-power hybrid power system will have extensive applications in oil fields.

Keywords:pumping unit;wind-power hybrid power system;energy-saving and emissions cuts;economy benefit evaluation

Application of Lifting Technology of Electric Control Commutation Tower Type Pumping Machine

SU Chengzhi(No.7 Oil Production Plant in Daqing Oilfield Co.,Ltd)2019,9(1):18-19

Abstract:Aiming at the problems of low transmission efficiency,energy consumption and poor energy-saving effect of traditional beam pumping units,the lifting technology test of electronically controlled reversing tower pumping units is carried out in order to reduce single well energy consumption and improve energy-saving effect.By changing the transmission of four-bar linkage of beam pumping unit,the motor can drive the driving wheel and the moving pulley directly through the deceleration of the reducer,and the up and down reciprocating motion is controlled by the intelligent control device,so as to improve the transmission efficiency and system efficiency and reduce energy consumption.Through comparative analysis of test data from four wells,the average system efficiency is increased by 11.29%,the electricity saving rate of 100 meters per ton of liquid is 26.3%,and the average daily electricity saving rate of single well is 56.4 kW,which has better energy saving effect.Four wells have saved 8.176×104kW·h of electricity per year and 5 217 thousand yuan of electricity per year.They have high economic benefits and broad application prospects.

KeywordS:tower type pumping machine;electric control commutation;drive;The efficiency of the system;energy saving

Application and Commissioning of Lithium Bromide Refrigeration Unit in Petrochemical Urea Dewaxing System

XU Qichang,XU Fengbin,ZHANG Lihao,WANG Enliang(JinxiPetrochemical Company in CNPC)2019,9(1):20-23

Abstract:This paper provides a reference for installation and commissioning of lithium bromide refrigeration units in petrochemical plants.In according to the practical experience summary for the application and commissioning of FG-73H×2 lithium bromide refrigeration unit used for circulating refrigerated water(7-13 ℃)in urea dewaxing unit,in terms of the technical problems found in the first commissioning,it is analyzed that the working condition changes of the petrochemical plant have influence on the operation stability of lithium bromide refrigeration unit,and a series of feasible technical schemes are made up.After the second commissioning,the refrigeration unit can be suitable for the change of heat load and the disturbance problem from external environment is solved.The lithium bromide unit can automatically adjust the heat load from 10%to 100%eventually,which is well suitable for the production process environment and meets the production demand.The energy system with low energy consumption,low pollution and high efficiency will be of a good development prospect under green development concept.The debugging results show that the steam-powered lithium bromide refrigeration unit con be used in petrochemical production units,and can supply 7-13℃circulating refrigerated water steadily

Keywords:lithium bromide chiller;petrochemical plant;circulating chilled water;run and debug

Discussion on Energy Saving Measures for Verification Device of Oil Gas Water Flow Meter

RU Jiwei(Technical Supervision Center of Daqing Petroleum Administration Co.,Ltd)2019,9(1):24-25

Abstract:In view of the problems of high energy consumption, low test efficiency,low test equipment potential, safety and environmental defects in some equipment, the traditional oil,gas and water flow meter calibration equipment has been put forward to transform the frequency and energy saving technology of the metering device of oil and gas flow metering instrument and add water loop.The equipment for the recovery and utilization of the outer drainage of the air pump,as well as the technical measures of improving the technological process of the water flow metering instrument verification device, are improved,and the effect and the comprehensive benefit are analyzed.Practice has proved that these energy-saving technology measures are very effective.

Keywords:oil and gas water;flow measurement;verification device;energy saving measures;discussion

Application ofAutomation Instrument in Oilfield Production Energy Saving

QI Zhaoqing(Daqing Oilfield Automation Instrument Co.,Ltd)2019,9(1):26-28

Abstract:In recent years,the industrial production technology has developed rapidly and rapidly,the use of automation instrumentation equipment has become more and more widespread,and it has played a significant role in the petroleum industry.However,the large number of automated instrumentation and instrumentation arrangements and applications will consume huge energy resources.It is difficult to meet the development requirements of environmental protection and energy conservation in China.Therefore,for the better development of oil fields,we need to develop more environmentally friendly and energy-efficient instruments and formulate more mature plans to meet the needs of oil field production while achieving environmental protection and energy conservation goals.

Keywords:oilfield production;environmental protection and energy conservation;automatic instruments;instruments

Research andAnalysis of Carbon Market in ShengliOilfield

MA Kun(ShengliOilfield Technology Testing Center)2019,9(1):29-30

Abstract:with the acceleration of the national unified carbon market,ShengliOilfield,as a highenergy consuming enterprise,will be included in the control and emission enterprises.And then there's a new transaction--carbon trading,a new asset--carbon assets.Well managed carbon assets are assets;poorly managed carbon assets are liabilities.ShengliOilfield carbon trading,carbon asset management for further support,actively carry out research and analysis,this paper first introduces the system of SengliOilfield actively carry out organization,policy,personnel adjustment,then introduced the two waste heat utilization project in victory in reporting the situation of the greenhouse gas emission reduction projects,the key direction of carbon asset management of Shengli oilfield development analysis,carbon asset management for the future work direction is proposed.

Keywords:the carbon market;voluntary emission reduction projects;measures

Innovation and Practice of Energy Conservation in Shengli Oilfield

SONG Xin,SONGHonglin(Shengli Oilfield Branch of China Petrochemical Corporation)2019,9(1):31-33

Abstract:Since 2014, the oil price has been declining sharply, which has led the whole oil industry to fall into a"cold winter period".At present,international investment in fossil energy has rebounded,and investment in upstream oil and gas industries is at a historic high.Under the guidance of General Secretary Xi Jinping's ecological civilization construction,Shengli Oilfield has made some achievements in energy saving and emission reduction.Energy-saving work needs to seek new breakthroughs in innovation and gain true knowledge in practice.Shengli Oilfield has made some achievements in energy saving and emission reduction in recent years.By summarizing the achievements of Shengli Oilfield,this paper introduces Shengli Oilfield's experiences and practices in energy saving and emission reduction,and analyses its next work ideas and directions.Keywords:Shengli Oilfield;energy conservation;emission reduction;practice

Management and Practice of Energy Saving in Pumping Well Site

ZHONG Yi,LIN Fazhi,SUN Xiangwen(No.5Oil Production Plant in Daqing Oilfield Co.,Ltd)2019,9(1):34-36

Abstract:At present,lifting equipment is mainly pumping unit,system efficiency as an important index to evaluate the lift efficiency of pumping unit,when the system efficiency is lower than 22%as the system efficiency is low.The system efficiency test shows that the low efficiency of the system is generally characterized by high power consumption,high single consumption, low liquid production, and the analysis of the factors affecting the system efficiency, the low efficiency of the system is mainly due to the production of liquid yield,unreasonable parameters,equipment mismatch and other reasons.In order to improve the system efficiency of low production status,combined with on-site management experience,based on the actual operating parameters,the system efficiency of the impact of the cause classification,the establishment of ground parameters optimization, pump diameter replacement, node control, pumping, drag equipment optimization measures,received significant energy-saving effect.

Keywords:system efficiency;impact factors;node;energy saving

Leak Detection and Repair(LDAR)Basic Information Statistics Manipulation Method

LI Jun,HUANG Minchao,ZUO Shenmei,YU Zhe,WANG Hejing(Appraisal Center for Environment and Engineering)2019,9(1):37-39

Abscract: LDAR is an important policy of our country VOCs control, specification and policy documents require petroleum refining,petrochemical and synthetic resin industry LDAR.LDAR basic information statistics is the basis of LDAR field detection, leakage repair, emission calculation and mathematical statistics,so LDAR basic information statistics is a very important link in LDAR.At present,there is no detailed procedure to guide enterprises to carry out LDAR basic information statistics,which leads to the problems of large investment of manpower and material resources and difficult to guarantee the authenticity of LDAR basic information statistics,and more difficult to follow up LDAR work.To solve this problem,this paper puts forward the LDAR basic information statistics.This makes LDAR into effect,and helps to improve the atmospheric environment situation at the present stage in China.

Keywords:VOCs;LDAR;basic information;statistics

Exploration and Practice of Safety and Efficiency Installation Method of Coiled Yubbing

GAO Sen,CHEN Xiong,LIU Ruijun(CCDC Changqing Downhole Technology Company)2019,9(1):40-43

Abstract:Coiled tubbingtechnique with high efficiency and low cost is widely used at home and abroad, then the routine procedure of infixing coiled tubing is too tedious, result in the installation of injector hydraulic pipeline and the installation of downhole tools affected by jointly and severally,on-site installation labor efficiency is low.Aiming at the present situation that the procedure of inserting coiled tubing complexity and low efficiency,put forward a new method of using winch system on the ground to insert coiled tubing,in the meanwhile,aiming at hydraulic pipeline installation of injector and installation of downhole tools,put forward improvement measures of installing hydraulic pipeline and downhole tools connectors on the ground,specific equipment modification, tool development and operation practice were carried out, while ensuring the quality of site constructiion,realize the coiled tubing installation security and highefficiency.

Keywords:coil tubbing;installation;safety;high-efficiency

Application of Heat Insulation andAnti-wear Tubing in High Waxy Oil Wells

FU Yarong,LI Yangmin,YANG Zhongfeng,WANG Xiuyan,ZHAI zhongyang,HE Gaiying,XU Wenning,ZHAO Xiaolong,TANG Jing ,HAO Limin(North China Oilfield Company)2019,9(1):44-46

Abstract:Conventional paraffin cleaning methods such as chemical(microorganism),heat washing,mechanical and electrothermal cleaning methods have made great progress and development;frontier wax-cleaning and anti-waxing methods are being tried;heat insulation tubing of different materials can clear and prevent wax.The anticoagulant effect has been proved by field test,but neither of them has realized the combination of oil well cleaning and preventing wax and surface oil gathering.The heat insulation and wear resistant oil pipe composed of ordinary oil pipe 35CrMo inner pipe, heat insulating layer 35CrMo seal sleeve, tetrafluoroethylene rubber sleeve,vacuum seal sleeve,oil pipe coupling,etc.Its insulation layer can block the loss of formation heat energy carried by crude oil during lifting process.The lifting edge and wellhead temperature are higher than that of crude oil waxing point temperature,which has the function of anti-wear and anticorrosion after cold rolling and medium frequency tempering treatment of 35CrMo alloy inner pipe.After the application of 16 oil wells,the wellhead temperature is increased by 21.37℃,the average daily power consumption of single well is reduced by 23.58 kW·h.the average maximum suspended load of pumping unit is reduced by 10.27 kN,and the chemical and thermal cleaning measures are eliminated,and the partial wear of rod and pipe is alleviated.The change of single well oil gathering mode from three-tube mixing heat to single-tube oil gathering.The"one pipe multifunction"is realized,and the traditional technology of oil recovery and ground gathering and transportation is simplified to the maximum extent.

Keywords:heat insulation;heat preservation;abrasion resistance;tubing;high wax content;oil well

主站蜘蛛池模板: 欧美三级自拍| 亚洲二区视频| 亚洲福利片无码最新在线播放| 亚洲最黄视频| 波多野结衣一区二区三区四区视频| 看看一级毛片| 国产00高中生在线播放| аv天堂最新中文在线| 久久黄色视频影| av在线5g无码天天| 97精品久久久大香线焦| 自偷自拍三级全三级视频| 亚洲精品日产精品乱码不卡| 亚洲精品成人片在线播放| 成人综合久久综合| 久久黄色影院| 亚洲国产中文在线二区三区免| 欧美性猛交xxxx乱大交极品| 国产97公开成人免费视频| 中国毛片网| 欧美激情视频二区三区| a在线观看免费| 国产欧美在线| 天堂va亚洲va欧美va国产| av大片在线无码免费| 无码久看视频| 久久91精品牛牛| 成人午夜网址| 噜噜噜久久| 亚洲精品国产乱码不卡| 亚洲综合第一区| 国产爽爽视频| 毛片免费观看视频| 欧美色视频网站| 中文字幕色在线| 亚洲乱码在线视频| 小13箩利洗澡无码视频免费网站| 久久精品国产国语对白| 免费a级毛片视频| 久久久久久久久亚洲精品| 欧美中日韩在线| 久无码久无码av无码| 日韩A∨精品日韩精品无码| 91久久精品国产| 波多野结衣一区二区三区88| 一区二区三区四区精品视频 | 久久香蕉国产线看观看精品蕉| 久久黄色免费电影| 亚洲五月激情网| 免费全部高H视频无码无遮掩| 天天躁夜夜躁狠狠躁图片| 免费视频在线2021入口| 99er精品视频| 青青草a国产免费观看| 四虎影视永久在线精品| 99久久精品国产自免费| 亚洲高清在线天堂精品| 精品久久综合1区2区3区激情| 在线免费看黄的网站| 最新加勒比隔壁人妻| 丁香婷婷激情网| 国产久操视频| 四虎永久免费地址在线网站| 宅男噜噜噜66国产在线观看| 国产成人免费视频精品一区二区| 亚洲综合第一区| 欧美激情福利| 国内精品视频在线| 欧美不卡视频一区发布| 99无码中文字幕视频| 国产成年女人特黄特色毛片免| 在线免费不卡视频| 国产精品漂亮美女在线观看| 国产在线91在线电影| 自慰网址在线观看| 欧美国产日本高清不卡| 成人福利在线视频免费观看| 99精品热视频这里只有精品7| 国产精品久久久久无码网站| 天堂成人在线视频| 欧美成人精品一级在线观看| 91久久天天躁狠狠躁夜夜|