999精品在线视频,手机成人午夜在线视频,久久不卡国产精品无码,中日无码在线观看,成人av手机在线观看,日韩精品亚洲一区中文字幕,亚洲av无码人妻,四虎国产在线观看 ?

耦合作用下蓄水速度對心墻壩滲流性態的影響分析

2017-07-29 09:00:44尹偉強傅瓊華高江林周清勇彭圣軍
南水北調與水利科技 2017年4期

尹偉強+傅瓊華+高江林+周清勇+彭圣軍

摘要::水庫初次蓄水速度直接影響土石壩的滲流安全,水位上升使得壩體內應力場復雜多變,影響滲流性態,而忽略應力場影響對滲流分析易造成偏差。基于飽和-非飽和土滲流理論,在考慮初始應力場和滲流場的基礎上針對蓄水速度對滲流場的影響進行數值模擬,并對比和研究了蓄水過程中考慮和不考慮應力場影響下的滲流性態。結果表明,蓄水速度較慢時,應力對各水力要素影響不明顯,提高蓄水速度,心墻上游局部存在較大的水力梯度,孔隙水壓力突變并集中分布,對壩體不利,考慮應力耦合影響計算結果偏于安全。因此,初次蓄水滲流分析有必要考慮應力場的影響,并嚴格控制初次蓄水速度。

關鍵詞:心墻壩;流-固耦合;蓄水速度;滲流性態

中圖分類號:TV139.1 文獻標識碼:A 文章編號:1672-1683(2017)04-0168-07

Abstract:The initial impounding speed directly affects the seepage safety of the earth-rock dam,water rising makes the stress field of the dam complicated and changeable,it may impact seepage state,while ignoring the influence of stress field on the seepage analysis is easy to cause some deviation.Based on the saturated- unsaturated seepage theory,In consideration of the initial stress field and seepage field,analysis the influence of seepage state with different impounding speed by using numerical simulation,then compared and studied seepage behavior under the influence of stress field.The results show that at slow impounding speed,the stress has inconspicuous influence on the hydraulic factors.Increasing impounding speed then local existence of large hydraulic gradient,pore water pressure mutated and clustered,these adverse to the dam,the calculation result is safer when considering the seepage-stress coupling.Therefore,it is necessary to consider the influence of the stress field on the first water storage seepage analysis,and strictly control the initial water impounding speed.

Key words:core dam;seepage-stress coupling;impounding speed;seepage state

土石壩滲流問題長期以來為工程界所關注,由滲流引起的破壞與變形是造成土石壩失事和潰壩的主要原因之一,且滲透破壞大多數出現在蓄水初期[1-2]。水庫初次蓄水時,心墻處于非飽和狀態,庫水位快速上升使得水流不能及時滲入心墻,形成了心墻內外的水壓力突變,易引起滲透破壞[3]。美國的提堂(Teton)大壩就是由于初次蓄水時心墻壩料接觸部位形成逐漸內部沖刷并發展為管涌,導致大壩決口破壞[4];奧地利Gepatsch心墻壩在初次蓄水后壩頂出現嚴重的縱向裂縫、壩殼濕陷變形等現象。

以往的滲流研究中,對初次蓄水速度的影響研究較少[5-7],著重于研究庫水位變化對滲流場和應力變形等方面的影響[8-12],而對土壩滲流場的研究往往忽略了早期施工初始應力場、滲流場及蓄水過程應力耦合作用的影響,未能反應實際狀態下的滲流場。事實上,土壩施工期由于壩料初始含水率及土料受力壓密變形的影響,存在較大的孔隙水壓力及壩體變形,直接影響蓄水初期的滲流性態[13]。壩體應力變形與滲流之間存在復雜的耦合作用,滲流通過改變作用在土體的滲透體積力和滲透壓力而改變有效應力分布,應力通過影響土體的體積應變和孔隙比而影響滲透系數,改變土體滲流流速和孔隙水壓力的分布[14]。因此,有必要在研究初次蓄水速度時考慮應力場-滲流場耦合作用對壩體滲流性態的影響。

為此,本文基于飽和-非飽和土滲流理論,結合實際工程,建立了多孔介質材料的滲流場與應力場耦合分析的非線性數學模型。從孔隙水壓力、滲透流速、水力梯度等方面研究,并對比不同蓄水速度下考慮和不考慮應力場影響的滲流性態,為今后類似工程的設計和運行管理提供科學合理的依據。

1 計原算理與實施

1.1 平衡方程

2.1 計算模型及概況

東谷水利樞紐工程位于江西省安福縣境內的東[HJ2.25mm]谷河上,水庫總庫容1.257億m3,電站裝機容量16 MW,是一座以灌溉和發電為主、兼顧防洪等綜合利用的大(二)型水庫。工程于2009年12月基本建成并開始下閘蓄水,攔河壩采用黏土心墻壩,壩頂高程149.80 m,最大壩高67.8 m。大壩防滲心墻位于大壩中心部位,心墻材質為粉質壤土和重粉質壤土,心墻上游設過渡層、下游側設反濾層,上下游壩殼采用石碴混合料,下游壩趾設堆石排水體,壩體最大剖面見圖1。

為比較和研究不同蓄水速度對壩體滲流性態的影響規律,計算工況同時按考慮和不考慮應力場的影響進行滲流計算。耦合分析中,需各自定義應用位移和水力邊界條件,上、下游水位以下的入滲面及出逸面屬第一類邊界,對于庫水位上升的非穩定滲流,上游迎水面為變水頭邊界,蓄水速度分別以0.5 m/d、1.0 m/d、2.0 m/d線性增加至正常蓄水位146.0 m,下游水位取85.98 m。壩基設無限區域并施加x、y兩向約束,壩坡面及其余邊界均為自由邊界,各工況下耦合計算的初始條件和邊界條件與非耦合計算中相同。

3 計算結果分析

為了更直觀和準確的分析水庫蓄水速度及應力場對心墻壩滲流場的影響,在心墻區及壩殼料區選取A、B兩個監測點。追蹤其滲透特性隨水庫蓄水速度的變化。監測點布置詳圖見壩料分區圖1,結果分析如下。

3.1 蓄水速度對壩體孔隙水壓力的影響

心墻孔隙水壓力一部分來自壩體填筑過程中壩體自重荷載引起的體積力,另一部分是初次蓄水后水流滲入心墻引起的水壓力。由于心墻內的水與心墻上游水不連通,致使心墻內外的孔隙水壓力是突變的[18]。圖4為不同蓄水速度下庫水位上升至正常蓄水位146.0 m時心墻內孔隙水壓力分布圖。結果表明,浸潤線順著壩殼料向心墻下游延伸,浸潤線上升相對庫水位上升而言,存在滯后現象,且蓄水越快滯后現象越明顯,同時壩體內孔隙水壓力有所減小;蓄水速度為0.5 m/d時,壩殼料浸潤線大致呈水平,心墻承擔大部分水頭,浸潤線下降平緩。蓄水速度為2.0 m/d時,浸潤線變化逐漸向上游轉移,水頭損失集中至心墻上游面附近,心墻內浸潤線下降較陡。究其原因,由于心墻土料的滲透系數較小,浸潤面推進較慢形成穩定滲流需要很長的時間。當蓄水較慢時,壩體內浸潤線能隨水位緩慢上升,心墻內能及時達到飽和。反之,隨著蓄水速度的增大,水流來不及滲入心墻,壩體內浸潤線不能隨水位同步上升,壩體內飽和區范圍變小。

考慮耦合作用后,心墻內飽和區域范圍及孔隙水壓力值均有所減小,考慮應力場影響使得浸潤線下降變陡,孔隙水壓力等勢線突變并集中分布現象顯著,且蓄水速度越大受應力場影響越明顯,這意味著心墻局部存在較大的水力梯度,這對壩體來說是不利的。這是由于蓄水初期,壩體填土料浸水少,壩體內孔隙水壓力小而有效應力較大,土顆粒受力壓密變形,因此受應力影響的滲透系數顯著低于不考慮應力的滲透系數,致使耦合分析所得的浸潤線較低,孔隙水壓力也較低。

圖5為不同蓄水速度下壩體有效應力分布圖。壩體蓄水后由于浮力和水壓力的影響,心墻上游側壩殼的大主應力低于下游側的大主應力,心墻應力拱效應逐漸消失。同時由于心墻受水壓力作用,上游壩殼料部分區域小主應力降低至接近于零。蓄水速度增大,浸潤線上升緩慢,壩體內孔隙水壓力變化滯后,使得壩體內仍存在明顯的拱效應。已有研究表明,墻前水位上升快和心墻拱效應是水力劈裂發生的條件之一[19]。因此,水庫加快初次蓄水速度不利于心墻有效應力分布,影響壩體安全。

3.2 蓄水速度對滲透流速的影響

圖6是壩軸線斷面上不同點的流速隨高程變化曲線。結果表明,提高蓄水速度,心墻內滲透流速數值上有所減小,飽和區的滲透流速大于非飽和區;各工況下計算所得滲透速度具有相似的分布規律,即滲透速度在心墻內隨高程變化呈現先增后減的趨勢,在自由面處即飽和和非飽和交界面上,流速都出現突變現象,這是因為飽和區滲透系數遠大于非飽和區,隨著庫水位上升,基質吸力逐漸減小,心墻內部分土體由非飽和狀態向飽和狀態轉變;飽和區內考慮應力耦合計算值低于非耦合值,非飽和區內影響不明顯,提高蓄水速度,應力對流速變化影響顯著增大,自由面出現明顯峰值。

圖7為壩體內不同點的滲透流速隨時間變化曲線。心墻上游壩殼料A點,滲透速度隨著蓄水速度增大而增大,蓄水前期水流前鋒未到達A點時接近于0,隨后陡增至峰值后逐漸減小并趨于平緩,這是因為上游壩殼料的滲透系數較大,滲流阻力較小,因而滲透流速滯后不明顯。心墻內壩軸線B點,滲透流速隨蓄水速度增大而減小,B點水流滯后于A點,蓄水初期滲透流速平緩隨后逐步增大,水位上升越快增幅越大,這是因為心墻內滲透系數很小,滲流阻隔較大,水位上升形成穩定滲流的時間要很長;考慮應力耦合計算后,A、B兩點滲透流速數值上小于非耦合值,流速變化相對于非耦合有一定的滯后,且由于心墻料較壩殼料軟易壓縮變形,應力作用使心墻內土料壓實滲透性變小,因此心墻內滲透流速相對壩殼料而言,非耦合與耦合值相差明顯。

3.3 蓄水速度對水力梯度的影響

蓄水初期心墻內水力梯度直接影響壩體滲流穩定,實際水庫蓄水和水流入滲是需要很長時間的,心墻上游面很容易產生過大的水力梯度。因此,有必要研究心墻內蓄水速度對水力梯度的影響規律,以便為土石壩蓄水速度提供參考。

表2為心墻水力梯度成果表。最大水力梯度為6.57發生在蓄水速度2.0 m/d耦合工況下,出逸區最大水力梯度為1.57發生在蓄水速度0.5 m/d非耦合工況下,蓄水速度較慢時,應力對水力坡降影響不明顯。圖8為不同蓄水速度下庫水位上升至正常[CM(22]蓄水位146.0 m時心墻內水力梯度分布圖。這表明,庫水位上升較慢時,心墻內水力梯度分布均勻,最大水力坡降分布于心墻下游區,因此出逸區是影響滲透穩定的關鍵區域,碎石區過渡層的設計是大壩滲透穩定的保障;庫水位上升較快時,滲流區域集中在心墻上游面較小范圍內,滲透路徑短,因而心墻上游存在較大和集中分布的水力梯度;考慮應力耦合影響后,水力梯度數值上較非耦合大,耦合作用使得水力梯度等勢線分布有向心墻上游偏移的趨勢,水力梯度愈加集中分布于過渡層與心墻料結合區范圍,而局部過大水力梯度也是引起心墻水力劈裂的原因之一[20]。因此,提高蓄水速度對壩體局部滲透穩定不利,考慮應力影響對滲透破壞的判斷偏于安全。

4 結論

心墻壩初次蓄水速度對土石壩的滲透穩定至關重要,結合實際工程通過非線性流-固耦合方法,對土石壩滲流性態的研究表明:

(1)提高蓄水速度,水流入滲滯后致使壩體內飽和區域變小,心墻內滲透流速減小并局部存在較大的水力梯度。孔隙水壓力有所減小,表現突變并集中分布,對壩體不利。

(2)考慮應力場影響后,計算所得飽和區內滲透流速低于非耦合值,非飽和區內影響不明顯,流速變化相對非耦合有一定的滯后,水力梯度等勢線分布向心墻上游偏移且數值上高于非耦合值,心墻內孔隙水壓力集中分布愈明顯,計算結果偏于安全。

(3)水庫快速蓄水時,應力對各水力要素影響顯著增大,在分析土石壩蓄水速度影響的非穩定滲流場時,有必要考慮應力-滲流的耦合影響,確保大壩的安全穩定運行,并嚴格控制初次蓄水速度。

參考文獻(References):

[1] 汝乃華,牛運光.大壩事故與安全·土石壩[M].北京:中國 水利水電出版社,1997.(RU Nai-hua,NIU Yun-guang.Dam accidents and safety·earth-rockfill dams[M].Beijing:China Water & Power Press,1997.(in Chinese))

[2] Foster M,Fell R,Spannagle M.The statistics of embankment dam failures and accidents[J].Canadian Geotechnical Journal,2002,37(5):1000-1024.DOI:10.1139/t00-030.

[3] 陳生水,鐘啟明,曹偉.土石壩滲透破壞潰決機理及數值模擬[J].中國科學:技術科學,2012,42(6):697-703.(CHEN Sheng-shui,ZHONG Qi-ming,CAO Wei.Breach mechanism and numerical simulation for seepage failure of earth-rock dams[J].Scientia Sinica Techologica,2012,42(6):697-703.(in Chinese))

[4] Stacey S,Norbert D.Lessons from the failure of the Teton Dam[C].Forensic Engineering Proceedings of the Third Forensic Engineering Progress.San Diego:[s.n.],2003:178-189.DOI:10.1061/40692(241)20.

[5] 王冕,陳群.庫區蓄水速度對不均勻心墻滲流場的影響[J].地下空間與工程學報,2014(S2):1794-1799.(WANG Mian,CHEN Qun.Influence of reservoir filling velocity on the seepage in the non-uniform core wall[J].Chinese Journal of Underground Space and Engineering,2014(S2):1794-1799.(in Chinese))

[6] 雷紅軍,馮業林,劉興寧.糯扎渡水電站蓄水速度對心墻堆石壩安全的影響研究[J].大壩與安全,2012(5):1-5.(LEI Hong-jun,FENG Ye-lin,LIU Xing-ning.Effect of impounding speed on safety of Nuozadu core wall rockfill dam[J].Large Dam & Safety,2012(5):1-5.(in Chinese))DOI:10.3969/j.issn.1671-1092.2012.05.002.

[7] 王年香,章為民,張丹,等.高心墻堆石壩初次蓄水速率影響研究[J].鄭州大學學報:工學版,2012(5):72-76.(WANG Nian-xiang,ZHANG Wei-min,ZHANG Dan,et al.Effect of initial impounding speed on high core rock-fill dam[J].Journal of zhengzhou university:Engineering Science,2012(5):72-76.(in Chinese))DOI:10.3969/j.issn.1671-6833.2012.05.016.

[8] 謝定松,蔡紅,李維朝,等.庫水位快速變動條件下心墻壩上游壩殼自由水面線變化規律研究[J].巖土工程學報,2012(9):1568-1573.(XIE Ding-song,CAI Hong,LI Wei-chao,et al.Variation laws of seepage lines in upstream shell of core dams under rapid drawdown of reservoir level[J].Chinese Journal of Geotechnical Engineering,2012(9):1568-1573.(in Chinese))

[9] 賀亞魏,孟軍省,劉雪梅.水位升降對粘土心墻土石壩滲流穩定性分析[J].武漢大學學報:工學版,2008(5):92-96.(HE Ya-wei,MENG Jun-sheng,LIU Xue-mei.Analysis of seepage stability of earth-rock dam with clay core under ascending and descending water table conditions[J].Engineering Journal of Wuhan University,2008(5):92-96.(in Chinese))

[10] 陳群,張利民,朱分清.填料分層對砂礫石壩滲流場的影響[J].巖土工程學報,2006(2):179-183.(CHEN Qun,ZHANG Li-min,ZHU Fen-qing.Effects of material stratification on the seepage field in a rockfill dam[J].Chinese Journal of Geotechnical Engineering,2006(2):179-183.(in Chinese))DOI:10.3321/j.issn:1000-4548.2006.02.007.

[11] 柳厚祥,李寧,廖雪,等.考慮應力場與滲流場耦合的尾礦壩非穩定滲流分析[J].巖石力學與工程學報,2004,23(17):2870-2875.(LIU Hou-xiang,LI Ning,LIAO Xue,et al.Unsteady seepage analysis of tailings dams considering coupling of stress and seepage fields[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(17):2870-2875.(in Chinese))DOI:10.3321/j.issn:1000-6915.2004.17.004.

[12] 徐連民,常強,肖前軍.土石壩非穩定滲流場和應力場耦合分析方法[J].大壩與安全,2013(6):35-41.(XU Lian-min,CHANG Qiang,XIAO Qian-jun.Coupling analysis method of unsteady seepage field and stress field for earth- rockfill dams[J].Large Dam & Safety,2013(6):35-41.(in Chinese))DOI:10.3969/j.issn.1671-1092.2013.06.011.

[13] 陳向浩,鄧建輝,陳科文,等.高堆石壩礫石土心墻施工期應力監測與分析[J].巖土力學,2011(4):1083-1088,1094.(CHEN Xiang-hao,DENG Jian-hui,CHEN Ke-wen,et al.Stress monitoring and analysis of gravelly soil corewall in high rockfill dam during construction[J].Rock and Soil Mechanics,2011(4):1083-1088,1094.(in Chinese))DOI:10.3969/j.issn.1000-7598.2011.04.022.

[14] 周中.土石混合體滑坡的流-固耦合特性及其預測預報研究[D].長沙:中南大學,2006.(Zhou zhong.Study on fluid solid coupling characteristics and prediction of debris mixture landslide[D].Changsha:Central South University,2006.(in Chinese))

[15] Fredlund D G,Rahardjo H.Soil mechanics for unsaturated soils[J].New York:John Wiley and Sons Inc,1993.

[16] Van genuchten M T.A closed form equation for predicting the hydraulic conductivity of unsaturated soils[J].Soil Science Society of American Journal,1980,44:892-898.

[17] 毛海濤,何華祥,邵東國,等.無限深透水壩基滲流場與應力場耦合分析[J].水動力學研究與進展A輯,2015,02:223-229.(MAO Hai-tao,HE Hua-xiang,SHAO Dong-guo,et al.The coupling analysis of seepage field and stress field on the infinite deep pervious foundation[J].Chinese Journal of Hydrodynamics,2015,02:223-229.(in Chinese))DOI:10.16076/j.cnki.cjhd.2015.02.015

[18] 陳繼平,曹林曦,劉明華,等.礫石土心墻堆石壩施工期孔隙水壓力分析[J].巖土力學,2008(S1):176-180.(CHEN Ji-ping,CAO Lin-xi,LIU Ming-hua,et al.Pore water pressure analysis during construction of gravelly soil corewall rockfill dam[J].Rock and soil mechanics,2008(S1):176-180.(in Chinese))DOI:10.3969/j.issn.1000-7598.2008.z1.033.

[19] 殷宗澤,朱俊高,袁俊平,等.心墻堆石壩的水力劈裂分析[J].水利學報,2006,37(11):1348-1352.(YIN Zong-ze,ZHU Jun-gao,YUAN Jun-ping,et al.Hydraulic fracture analysis of rock-fill dam with core wall[J].Journal of Hydraulic Engineering,2006,37(11):1348-1352.(in Chinese))DOI:10.3321/j.issn:0559-9350.2006.11.011.

[20] 張丙印,李娜,李全明,等.土石壩水力劈裂發生機理及模型試驗研究[J].巖土工程學報,2005,27(11):1277-1281.(ZHANG Bing-yin,LI Na,LI Quan-ming,et al.Mechanism analysis and model test of hydraulic fracturing in embankment dams[J].Chinese Journal of Geotechnical Engineering,2005,27(11):1277-1281.(in Chinese))DOI:10.3321/j.issn:1000-4548.2005.11.009.

主站蜘蛛池模板: 亚洲福利片无码最新在线播放| 国产大全韩国亚洲一区二区三区| 青草视频免费在线观看| 国产色图在线观看| 亚洲最黄视频| 国产精品久久久久久影院| 国产亚洲一区二区三区在线| 国产欧美视频在线| 美女免费黄网站| 国产精品女主播| 国产69精品久久久久妇女| 欧美国产精品不卡在线观看| 手机在线免费毛片| 岛国精品一区免费视频在线观看 | 亚洲免费播放| 欧美有码在线| 曰韩人妻一区二区三区| 国产无码网站在线观看| a级毛片网| 无码久看视频| 亚洲 欧美 偷自乱 图片| 澳门av无码| 日本精品影院| 亚洲床戏一区| 97在线公开视频| 看你懂的巨臀中文字幕一区二区| 特级毛片8级毛片免费观看| 亚洲AV无码乱码在线观看代蜜桃| 久久综合亚洲色一区二区三区| 国产簧片免费在线播放| 国产女同自拍视频| 岛国精品一区免费视频在线观看| 精品人妻一区二区三区蜜桃AⅤ| 亚洲成人一区在线| 国产精品久久久久久久伊一| 白浆免费视频国产精品视频| 99er精品视频| 狠狠亚洲婷婷综合色香| 亚洲日韩久久综合中文字幕| 国产精品久线在线观看| 欧美综合区自拍亚洲综合天堂| 五月天综合网亚洲综合天堂网| 国产靠逼视频| 国产成人8x视频一区二区| 青草娱乐极品免费视频| 国产成人精品一区二区三在线观看| 亚洲视频无码| 日韩精品无码一级毛片免费| aa级毛片毛片免费观看久| 亚洲乱强伦| 久久久久久久97| 天天综合网在线| 久久综合九九亚洲一区| 播五月综合| 国产亚洲视频免费播放| 男人天堂伊人网| 国产超薄肉色丝袜网站| 小13箩利洗澡无码视频免费网站| 日韩一区二区在线电影| 久久9966精品国产免费| 国产真实乱了在线播放| 国产无码制服丝袜| 日韩免费毛片| 国产精品欧美亚洲韩国日本不卡| 亚洲国产欧美国产综合久久| Jizz国产色系免费| 久久香蕉国产线看观看式| 婷婷综合色| 久久天天躁狠狠躁夜夜2020一| 亚洲码一区二区三区| 日韩色图区| 亚洲成人黄色在线| 国产精品午夜福利麻豆| 亚欧美国产综合| 国内99精品激情视频精品| 成人在线视频一区| 国产福利微拍精品一区二区| 亚洲成人播放| 国产玖玖视频| 欧美成人免费一区在线播放| 午夜福利视频一区| 国产一级小视频|