0 Introduction

Now the construction of the Amur-Yakutsk Mainline(AYaM)from Berkakit to Tommot to Nizhny Bestyakh has been completed.The AYaM runs for over 800 km from south to north,almost in a submeridional direction.In essence,the mainline is the first stage of the planned Transcontinental Railway across the Bering Strait.The construction of the second stage is now impossible in the direction of the Bering Strait due to the lack of a railway bridge across the Lena River and towards Magadan due to the reconstruction and construction of the Kolyma Federal Highway.An important task today is to develop a standard engineering-geocryological monitoring program for diagnostics and control of the railway system interaction with the environment,including permafrost,to providing effective construction,operation and maintenance of the AYaM.

1 Materials and methods

The stability of the Berkakit-Tommot-Nizhny Bestyakh railway is to a certain degree dependent on the stability of permafrost in its base.Besides the temperature,the permafrost ice content significantly affects its stability,which,as it is known,increases to the north.The railway section between 670~750 km is characterized by the most complicated geocryological conditions,according to the data of Melnikov Permafrost Institute and geotechnical investigations conducted by“Mosgiprotrans”,“Uralgiprotrans”,“YuzhYakut-TISIZ”,and other organizations.This section of the railway is underlain by the ice complex,with ice contents reaching 50% ~60%[1].

The railway geocryological structure can be briefly described as:

-Permafrost is continuous in the northern part of the Amga Plateau(530~630 km),on the Ust-Maya Plateau(630~700 km)and on the Lena river terraces (700~818 km);

-Permafrost thickness is 100~300 m or more,reaching 400~500 m in the northern part of the route;

-Mean annual temperatures here decrease northward from -1~-7℃;

-In other parts of the railway,permafrost is intermediate,discontinuous and insular with the thickness of 20~30 m to 100~200 m;

-Discontinuous permafrost is typical for the Chulman Plateau(0~130 km),the Aldan Plateau(130~294 km)and the Middle-Amga Plateau(386~530 km),where the mean annual ground temperature is from -1 to-3℃.

The necessity to create an individual construction plan for certain sections,where passive construction methods in permafrost were used,arose due to complex and non-uniform geocryologicalconditions ofthe AYaM.To the greatest extent this was done in the area,where the railway traverses the ice complex.The“Proekttransstroy”LLC together with the Melnikov Permafrost Institute,Central Research Institute and TransIGEM using developments of Moscow State University of Railway Engineering(MIIT)and experience of construction and operation of railways in Russia and abroad have developed the roadbed of AYaM.

Measures to prevent permafrost degradation beneath the embankments included:1)vertical thermosyphons with polystyrene foam insulation in 39 sections (693~710 km,730 km)with the total length of 4.9 km(soils of the IV type of settlement);2)extruded polystyrene foam insulation with the thickness of 5 cm on the side slopes and berms(129 m long at 709 km); 3)overhanging solar screens on the side slopes(100 m long at 709 km);4)thermosyphons(100 m-longsection at 709 km).Measures#1,2,3,and 4 were used in the test sites with similar geocryological conditions.

The analysis of the effectiveness of the measures is presented below.The measures were estimated according to the data of engineering-geocryological monitoring,which was conducted from the beginning of the railway construction(end of the 20th century)[2].

Penoplex polystyrene insulation was extensively used in roadway construction over the ice-rich permafrost(Fig.1).

Fig.1 Penoplex laying

Penoplex boards were installed,for example,in the embankment and berm at kilometer post(KP) 693.2.In the winter of 2010/2011 thermosyphons were installed on the berms(Fig.2).

Since 2010 the ground beneath embankment has tended to cool.A stronger ground cooling is registered under the berm on the right side.Under the left berm a minor ground cooling was registered(Fig.3).

In August 2010 temperature observations in boreholes beneath the berms at KP 693.2 and 693.5 showed that the insulating effect depends on the depth of placement.The deeper Penoplex is placed,the lesser its insulating effect is.Thus,with insulation placed at a depth of 0.7 m at KP 693.5 the depth of seasonal thaw beneath the berm was 1.70 m,while placement at 1.1 m(KP 693.2)resulted in thaw depth of 1.95 m(Fig.4).

Fig.2 Instalation of thermosyphons(KP 693.2)

Fig.3 Changes in temperature isotherms and permafrost table beneath the embankment at KP 692.61-number of soil layer;the permafrost table:2-in 2007,3-in 2011,4-in 2013;temperature contours:5-on 23.09.2007,6-on 17.09.2011,7-on 30.08.2013;8-rock with≤10%fines;9-Penoplex insulation boards;10-thermosyphons;11-temperature borehole.

Fig.4 Changes in depth of thaw and ground temperature beneath the berms during insulation placement at different depths at KP 693.2 and 693.5.

The thermosyphons were put into operation in the winter of 2010/2011 on berms of the mentioned above kilometer posts.Three-year observations in boreholes located at varying distances from thermosyphons have indicated that their cooling effect is strong within 0.5 m radius(B-18)and is sharply reduced at a distance of 1.3 m(B-9)(Fig.5).Observations of following years also confirmed the similar effect.At KP 693.5 the permafrost table beneath the berm rose to the Penoplex placement level(0.7 m),whereas at KP 693.2 it remained at the same level(1.95 m).The positive effect of Penoplex and thermosyphons is also noticeable at KP 708.9.At KP 708.8,overhanging snow sheds/ solar screens were installed on the side slopes,2.5~3.0 m-high embankment(Fig.5).

Fig.5 Overhanging snow sheds/solar screens

During the first two winters the sufficient cooling effect was not achieved.In 2013 ground temperatures at 0.2 and 1.5 m beneath the centerline were-1.1 and-1.3℃ respectively.The permafrost table rose almost to the level of the natural ground surface.A minor ground cooling effect was registered beneath the right slope.The permafrost table is at a depth of 0.3~ 0.5 m from the natural surface.Beneath the left slope the permafrost table is at 1.0~1.3 m depth.Ground temperatures beneath the sideslopes shows a little change insignificantly.In 2011 thaw depth on a 2 m rock bank to the left of the embankment was about 2.2 m.Ground temperature at 10 m depth was-1.5℃.In 2012 and 2013,thaw depths estimated from temperature measurements were 2.7 m and 2.6 m respectively,while ground temperature increased to-1.1℃.At the toe of the left sideslope,seasonal thaw depth was 2.2~2.3 m and ground temperature was 1.2℃,indicating permafrost degradation in this area.

At KP 708.9,2.5 m high embankment with Penoplex board insulation and thermosyphons was constructed in 2010.After roadbed completion the only operating borehole beneath the left berm was preserved (Fig.7).In the winter of 2010/2011 there was a tendency in the ground thermal regime to cool due to the thermosyphons and the thermal insulation.

Fig.6 Changes in temperature isotherms and permafrost table beneath the embankment at KP 708.81-number of soil layer;the permafrost table:2-in 2008,3-in 2011,4-in 2013;temperature contours:5-on 26.08.2008,6-on 17.09.2011,7-on 31.08.2013;8-rock with≤10%fines;9-solar screen/snow shed;10-temperature borehole.

Fig.7 Changes in temperature isotherms and permafrost table beneath the embankment at KP 708.91–number of soil layer;the permafrost table:2-in 2008,3-in 2011;temperature contours:4-on 26.08.2008,5-on 17.09.2011;6-rock with≤10%fines;7-Penoplex insulation boards;8-thermosyphons;9-temperature borehole.

2 Condusions

In 2012/2013 ground temperatures beneath the berms preserved their tendency to cool.The permafrost table rose to the natural surface level.Ground temperature beneath the berm was-2.5℃ at 1.5 m depth in the end of the warm season[3].

The following conclusions can be made from the results:

1)The stability of the roadbed and engineering structures is affected by the temperature regime changes caused by controlled removal of water at edges of nonfilterable embankments.

2)Experimental monitoring investigations of berms have shown Penoplex effectiveness for improvement of railway characteristics in waterlogged areas.

3)The cooling effect of thermosyphons and Penoplex insulation is strong beneath the right berm and minor beneath the uphill side.Heat insulating effect of Penoplex depends on the depth of its placement.The cooling effect of thermosyphons is noticeable within 0.5 m radius and is sharply reduced at a distance of 1.3 m.The overhanging snow sheds/solar screens installed on the sideslopes of the 2.5~3.0 m high embankment have not had an expected cooling effect.

[1] Varlamov S P,Scriabin P N,Shender N I,et al.Permafrost conditions of the Tommot-Kerdem Railroad in the territory of the ice complex[J].Science and Eeducation,2006,44(4):78-83.

[2] Shesternev D M,Litovko A V.Geocryological problems of operation of the railway section“Berkakit—Tommot”/D.M.Shesternev,A.V.Litovko[A].Problems of Engineering Permafrost Studies.Materials of the IXth International Symposium[C].Yakutsk:Permafrost Institute SB RAS Press,2011:260-265.

[3] Shesternev D M,Varlamov S P,Scriabin P N,et al.Engineering and geocryological conditions of the“Berkakit-Tommot-Yakutsk”section of the AYaM[J].Scientific and Technical Report,2013,174-179.

猜你喜歡
施工
后澆帶施工技術在房建施工中的運用
鋁模板在高層建筑施工中的應用
后澆帶施工技術在房建施工中的踐行探索
新型環保建筑材料在土木工程施工中的應用
防滲漏技術在民用建筑施工中的應用
后澆帶施工技術在房建施工中的應用
后澆帶施工技術在房建施工中的應用
土木工程施工技術創新探討
防滲漏施工技術在房建施工中的應用
上海建材(2017年4期)2017-10-16 01:33:34
土木工程施工實習的探討與實踐
主站蜘蛛池模板: av在线人妻熟妇| 国产91丝袜在线播放动漫 | 色婷婷亚洲十月十月色天| 久青草国产高清在线视频| 无码精油按摩潮喷在线播放 | 国产激情第一页| 成人福利在线看| 亚洲精品亚洲人成在线| 亚洲欧美不卡中文字幕| 成年片色大黄全免费网站久久 | 五月婷婷丁香综合| 欧美激情第一欧美在线| 国产精品中文免费福利| 精品1区2区3区| 国产91蝌蚪窝| www中文字幕在线观看| 国产在线拍偷自揄观看视频网站| 91精品网站| 婷婷成人综合| 国产欧美日韩在线一区| 欧美丝袜高跟鞋一区二区| 久久伊人操| 亚洲AⅤ无码日韩AV无码网站| 91在线日韩在线播放| 国产一区二区影院| 高清大学生毛片一级| 国产欧美日韩精品综合在线| 四虎亚洲国产成人久久精品| 日韩中文字幕免费在线观看| 国产在线视频自拍| 中文字幕亚洲精品2页| 97成人在线观看| 久久香蕉国产线看观看精品蕉| 午夜福利无码一区二区| 欧美成人免费午夜全| 茄子视频毛片免费观看| 无码电影在线观看| 日本一本在线视频| 亚洲色图欧美视频| 99久久99这里只有免费的精品| 不卡国产视频第一页| 亚洲第一天堂无码专区| 国产特级毛片| 亚洲性网站| 四虎永久免费地址| 欧美日韩国产在线人| 日本免费一区视频| 欧美国产精品拍自| 亚洲永久精品ww47国产| 欧美日韩国产成人在线观看| 久久亚洲国产最新网站| 精品国产黑色丝袜高跟鞋| 在线观看国产精品一区| 青青国产视频| 香蕉99国内自产自拍视频| 亚洲无码精品在线播放 | 在线毛片网站| 玩两个丰满老熟女久久网| 国产一区二区网站| 欧美一级黄片一区2区| 人妻中文字幕无码久久一区| 中字无码av在线电影| 精品福利视频网| 久久黄色视频影| 亚洲无码视频图片| 国产精品99久久久久久董美香 | 天天色天天操综合网| 天堂av综合网| 久久99精品久久久久纯品| 久久性妇女精品免费| 精品国产免费观看| 一级成人a做片免费| 重口调教一区二区视频| 欧美a级在线| 精品三级在线| 曰AV在线无码| 亚洲AⅤ无码国产精品| 国产视频你懂得| 色偷偷综合网| 好吊色妇女免费视频免费| 制服丝袜亚洲| 国产欧美一区二区三区视频在线观看|