Ynjun Shng,Kun Li,Wntong He,Chuno Sheng
aKey Laboratory of Engineering Geomechanics,Institute of Geology and Geophysics,Chinese Academy of Sciences,Beijing 100029,China
bShanxi Branch,China State Construction International Holdings Limited,Yangquan 045000,China
From the new Austrian tunneling method to the geoengineering condition evaluation and dynamic controlling method
Yanjun Shanga,*,Kun Lia,Wantong Hea,Chunbo Shengb
aKey Laboratory of Engineering Geomechanics,Institute of Geology and Geophysics,Chinese Academy of Sciences,Beijing 100029,China
bShanxi Branch,China State Construction International Holdings Limited,Yangquan 045000,China
A R T I C L EI N F O
Article history:
Received 26 November 2013 Received in revised form
29 January 2014
Accepted 28 February 2014
Available online 1 July 2014
Unfavorable geological body(UGB)
Multi-factor interaction matrix
Discontinuity dynamic controlling(DDC)
Cut slope
Geoengineering condition evaluation and
dynamic controlling(GEDC)method
The new Austrian tunneling method(NATM)is widely applied in design and construction of underground engineering projects.When the type and distribution of unfavorable geological bodies(UGBs) associated with their inf l uences on geoengineering are complicated or unfortunately are overlooked,we should pay more attentions to internal features of rocks grades IV and V(even in local but mostly controlling zones).With increasing attentions to the characteristics,mechanism and inf l uences of engineering construction-triggered geohazards,it is crucial to fully understand the disturbance of these geohazards on project construction.A reasonable determination method in construction procedure,i.e. the shape of working face,the type of engineering support and the choice of feasible procedure,should be considered in order to mitigate the construction-triggered geohazards.Due to their high sensitivity to groundwater and in-situ stress,various UGBs exhibit hysteretic nature and failure modes.To give a complete understanding on the internal causes,the emphasis on advanced comprehensive geological forecasting and overall reinforcement treatment is therefore of more practical signif i cance.Comprehensive evaluation of inf l uential factors,identif i cation of UGB,and measures of discontinuity dynamic controlling comprises the geoengineering condition evaluation and dynamic controlling method.In a case of a cut slope,the variations of UGBs and the impacts of key environmental factors are presented, where more severe construction-triggered geohazards emerged in construction stage than those predicted in design and f i eld investigation stages.As a result,the weight ratios of different inf l uential factors with respect to f i eld investigation,design and construction are obtained.
?2014 Institute of Rock and Soil Mechanics,Chinese Academy of Sciences.Production and hosting by Elsevier B.V.All rights reserved.
The main concerns for engineering geologists worldwide include the evaluation of engineering geological conditions,the comparison and suggestion of engineering site selection,the forecast of key geological problems and the dynamic adjustment of design and construction items.In China,many kinds of geological and geomorphological environments are commonly observed,and the complex engineering geological conditions are the challenging issues and disputations up to now.
In the stages of f i eld investigation and design,some complex engineering geological conditions often have problems confusing engineers or researchers,possibly making them misunderstand or miscalculate.In the stages of project planning or layout setting,the site selection or project spatial alignment can mostly cause unreasonable strategic decisions or problematic designs when unfavorable geological bodies(UGBs)are not well identif i ed.As a result, multiple inf l uential factors associated with unknown weight ratios and thresholds should be considered as the key issues in following analysis process.As deformation or failure modes of rock mass are not adequately understood,there are potential risks in the excavation or reinforcement schedules.Thus,a synthetic method is needed to address above-mentioned problems.
In this regard,the authors propose a geoengineering condition evaluation and dynamic controlling(GEDC)method.The GEDC method includes engineering geological evaluation,comparison of engineering site locations,identif i cation of UGB,and dynamic controlling of removal of rock mass fragments during construction. The GEDC is signif i cantly different from the new Austrian tunnelingmethod(NATM)which is based on displacement monitoring and reinforcement of shotcrete and rockbolt with elapsed time,as well as preliminary and secondary support at different steps.The selfstability of rocks grades I-III basically can be guaranteed,while for fractured rock mass of grades IV and V,reinforcement must be employed,depending on variations of structural model and parameters used.In this paper,the GEDC is introduced and a case study of landslide is presented for the purpose of validation.
The GEDC can be regarded as an engineering geological program consisting of three key steps:
(1)Synthetic evaluation of engineering geological conditions by means of interaction matrix of multiple inf l uential factors,analytic hierarchy process(AHP),expert scoring method,etc.
(2)Identif i cation of UGBs by means of f i eld investigation,analogical analysis,etc.
(3)Dynamic controlling of rock mass structures with the aid of backanalysis using monitoring results orof forecast using index thresholds as deformation rate ratio criterion(DRRC),etc.
2.1.Synthetic evaluation of engineering geological conditions
In the earlier stages of project plan and design,assessment of engineering geological conditions associated with comprehensive analysis methods should be considered.According to the engineering geomechanical meta-synthesis system methods(EGMS)(Yang, 1993)and/or the meta-synthesis in the engineering geology (Wang,2011),three components,i.e.the associated theories,expert group experience,in situ observation and monitoring,are combined to constitute an approach to solve problems in associationwith huge open complex system of engineering geomechanics.Some scholars, e.g.Hoek et al.(1995),have already mentioned the importance of theoretical models where above three components for a synthetic evaluation of engineering geological conditions should be combined.
In this approach,the interaction matrix of multiple inf l uential factors,AHP,and expert scoring method is necessary where the input and output can be visibly obtained.
2.1.1.Interaction matrix of multiple inf luential factors
The interaction matrix analysis method was initially proposed in rock mechanics analyses(Hudson and Harrison,1992)and was further developed for engineering geology evaluations(Shang et al., 2000).In this method,the main inf l uential factors at different levels are f i rst selected and compared.Then,an asymmetric matrix is constructed with the factors array at main diagonal line,and their interaction degree codes(generally from 0 to 4)are input spatially clockwise,i.e.for one couple of adjacent factors in the diagonal line, the cause(initiative)action codes are arrayed at rows,while the effect(passive)action codes are at columns.Finally,the sum of each row and column is calculated,respectively,and the weight of any inf l uential factor is equal to the ratio of its cause adding effect values to the sum quantity.On the other hand,the function rating code actuallydependsontheactivedegreeoffactorsinsite,andtherating codes ofN=0,1,2 indicate non-active,active,and intense active, respectively.The sum of the weight ratio associated with the rating code is equal to the total actual assessment values of factorsWi:

whereWiis the actual weight ratio of factori,ranging from 0%to 100%;Nis the rating code from the actual function of factors in site,N=0,1,2;αiis the weight ratio of factoriin one region or obtained from the interaction matrix,andαi=0%-100%.
2.1.2.Analytic hierarchy process(AHP)
The AHP is commonly used in engineering for comparison of priority of various factors at different levels.The AHP is regarded as one level-structural mathematical model.First,the level analytical model is set up.Then,a judgment matrix A is organized with codes 1-9.Next,the calculation is carried out step by step to obtain different evaluation results with math checks(Saaty,2008).The random consistency indexCIis used to check the logic trueness of the judgment matrix:

whereλmaxis the maximum value of eigenvalue of the matrix A, andnis the number of eigenvalue in the matrix A.
Generally,ifCI≤0.1,it can be noted that the judgment matrix is consistent,and the calculated value of weight ratioWis acceptable.
The random indexRIis

Finally,the total level arrayand consistencyare checked.Priority of each parameterCitothe highest target levelA,through levelBiin terms ofA/Ci,is represented asW(A/Ci)for overall priority of the consistency ratios of random arrays:

In this way,the total random consistency ratioCRvalues of parameters in levelCcan be obtained.
2.1.3.Expert scoring method
The results using expert judgment system are scored for different parameters with various weight ratios and ratings. Various parameters values are summarized and represented through expert assessment in a way of semi-quality and semiquantity.The factors constituting the engineering geological conditions are determined based on relative standards or specif i cations.Practically,the expert scoring method based on experiential judgmentofinteractionsandsyntheticevaluationofgeoengineering conditions is widely applied in engineering practice but mostly qualitatively.Thus,it should be noted that the weight ratio of expert judgment results is theoretically different,so the selection of expert,who is familiar with the actual engineering geological situations and has the mandatory knowledge of corresponding theory,is critically important.
2.2.Identif ication of UGB
Classif i cation and zonation are the main approaches for identifying various site-specif i c UGBs.Classif i cation of UGBs and corresponding measurements associated with different kinds of UGBs are illustrated in Fig.1.
The UGB can be divided into 3 types,i.e.soft rock and hard soil, karst cavern,and weak discontinuity,each composed of different media and components.In sites,risks and geohazards have a close relationship with UGB(see Fig.1),where the scientif i c adjustmentfor geohazards prevention should be adopted in order to gain a desirable result.

In order to identify site-specif i c UGB,regional investigation and comparison are important.In practice,the analogical analysis (Langer,1999)and precedent typical analysis method(PTA)(Li et al.,1998)are used for identif i cation of the UGB,which often constitute the observation and monitoring in the construction stages followed,aiming to feasible excavation and reinforcement (Shang et al.,1996).

Fig.2.Chart showing formation of the discontinuity dynamic controlling opinion.
2.3.Discontinuity dynamic controlling in construction stages
At present,the NATM is widely used in modern tunnel design and construction,and it emphasizes to some extent the essential integration of monitoring,rapid determination of surrounding rock instability boundaries,shotcrete protection and quick closing of fractured surrounding rocks timely at primary stage,and geological forecast followed by advanced supports.The greatest uncertainty or risk we encounter during excavation comes from the discontinuity dynamic controlling(DDC)which is put forward (Fig.2)Luo and Wu,1991 based on practice and experiences in construction.Inordertounderstandrockmassstructure discontinuity,some theories in terms of adjustment measures are developed such as safety island theory(Hu and Yin,1996)for selecting suitable engineering site in tectonic-active areas.With respect to variation and adjustment of structures in space and time,we adopt principle for dominant discontinuity identif i cation to describe structural effects on engineering project in space,and the NATM to control surrounding rock stability in time.The former focuses on spatial controlling and comparison,while the latter is on process controlling.
The minimum disturbance induced by excavation to UGB is desirable in managingexcavation rate,reinforcement measures and speed,which can be implemented with the help of f i eld monitoring and forecast obtained from index thresholds or DRRC(Shang et al., 2013).To determine the mechanical parameters of surrounding rocks,back analysis of monitored data is usually adopted to obtain lateral stress coeff i cient and elastic modulus to numerically evaluate surrounding rock stability in project design(Shang et al., 2002).

Fig.3.Flow chart for engineering geological work at various stages.

Fig.4.Slope slipping at an expressway in North China.(a)Landslide controlled by the mica schist(photo taken in NE direction,22 April 2012);(b)Landslide when installing anchor cables(photo taken in NW direction,15 April 2012);(c)Cutting of saprolite and shallow layers of mica schist for unloading(26 October 2013).
During the whole procedure of project site selection,design and construction,the engineering geology is dominant in decision making.The whole procedure starts from strategic decision or comparison of engineering candidate sites in order to identify the UGBs to avoid unfavorable problems induced by UGB during construction.WhenusingGEDCmethod,theproblemisnow transferred to dynamic controlling for diminishing disturbance on weak surrounding rocks,i.e.regular monitoring,smaller advancement rate,weak blasting and excavating,support in advance,etc. (Fig.3).
At the different stages of f i eld investigation,plan,design and construction,the synthetic evaluation of engineering geological conditions are signif i cantly different from discontinuity dynamic controlling and adjusting(Fig.3).Consequently,different methods are necessary to deal with various problems encountered to gain an optimal result.

Table 2Evaluation of weight ratios of inf l uential factors from the interaction matrix.
4.1.Brief description of a cut slope
One rock slope is taken as an example,which sits in the western part of the Taihang Mountain,Yuxian,North China(E113°25'40'', N38°28'20'').The stratum of this project belongs to Huili Group of Longhuahe Formation,the Upper Archean(Arlnh),which is basically composed of biotite plagiogneiss(Shanxi Geology Bureau, 1965).
The strike of the Taihang Mountain is nearly SN,and the elevation above sea level is 600-1000 m.The cut slope,located just between two creeks of a gully,is 51.4 m high and 160 m long,with 7 excavation steps(Fig.4).On 2 July 2011,after a 2-day heavy rainfall (0.4-70.7 mm/d in that region),the slope slipped locally at the SW part(Fig.4a).On 18 September 2011,when the 2nd step from the slope root was undercut and anchor cables were installed(Fig.4b), the whole slope slipped and cable installation failed.After f i eld investigation,it was knownthat the main slipping direction is 265°, and the dip angle of the slipping face is 26°;the frontier margin is 300 m wide,and the main axis is 280 m long,with a coverage area of 42,000 m2;the overburden thickness is 5-15 m,averaging 11 m. The total volume of slipping mass is approximately 460,000 m3.
4.2.Assessment of engineering geological conditions
Different evaluations of the site-speci fi c engineering geological conditions at different stages were carried out for this project.After fi eld investigation,it is clear that the slope,considered as an insequent structure,is underlain by granite-gneiss formation.Themechanical parameters of the rock mass,cohesioncand internal friction angle φ,of the 3 groups of gneiss samples are 12 MPa and 42.1°,respectively.The design is to cut the slope by 7 steps and to reinforce it using anchor cables within concrete frames.But after slope slipping,f i eld investigation shows that the slope is a typical consequent slope:the dip directions of the slope and the gneissosity are 270°and 265°,respectively;and the dip angles of the cut slope and schistosityare 38°and 25°,respectively.There are 5 interlayers of sericite-schist in the slope,of which the#3 and#4 interlayers(sequential order from the ground surface)constitute the slipping face.The cohesioncand internal friction angle φ of the rock mass obtained from back analysis of the slipped slope,using the rigid limit equilibrium method,are 4 kPa and 23.5°,respectively,suggesting that the design revision is needed,and the measures,such as removal of the disintegrated rocks in shallow depth and using anti-slide piles,were put forward.But in 2012, some f i ssures occurred again in the concrete frames during construction.Finally,the cut volume is accumulated to such a large value that saprolite and cataclastic rocks at shallow depth were all cut off(Fig.4c).

Table 1Assessment of slope conditions at different stages.
In order to understand the landslide mechanism and the suggested countermeasures,the authors combine the variations of evaluations and measurements at different stages(see Table 1).

Fig.5.The hierarchy models affecting stability of the cut slope.

Table 3Application of the AHP method.
4.3.Evaluation of inf luential factors effects
First,a qualitative description is needed to determine different weight ratios of the interaction matrix in investigation,design and constructionperiods(Table 2).The comparison of inf l uential factors at three levels of A,B and C is carried out(Fig.5).Then,using the AHP method,the weight ratios of the 6 parameters at level C are computed(Table 3).
In the expert scoring system,there are 4 items with different priorities(Table 4).The sum of different values of inf l uential factors is put into the blanks according to expert group experience.Then different weight ratios of the factors are added to obtain the overall values.
Above all,the weight ratios of the three artif i cial factors in combination with the natural factors from the interaction matrix, AHP,and expert scoring method are roughly represented as a result of natural factors 55%,investigation 16%,design 9%,and construction 20%(Table 5).
As a result,this assessment method of weight ratios of different inf l uential factors was approved and accepted by the responsiblemanagers.As for the plan effect in this procedure,which is governed by lots of factors during investigation and design,it is strategically important for selection of various schemes in advance. However,in this context,it is not considered due to its complex factors.

Table 4Results of the expert scoring method.

Table 5Suggested results of three kinds of methods for evaluation of effects.
The assessment of engineering geological conditions is conducted based on synthetic analyses of inf l uential factors with respect to geologyand engineering scopes using interaction matrix, AHP,expert scoring method,analogical method,etc.Based on UGB explorations and advance identif i cations,it is suggested for major project to keep away from the poor geological conditions in space. For determination of weight ratios of different inf l uential factors, different methods can be applied in various conditions.It is desirable if the input data are the same and the output results from different models can be compared and integrated.In this case,f i eld investigation,design and construction are the dominant factors accounting for excavation landslide in expressway in North China.
We wish to con fi rm that there are no known con fl icts of interest associated with this publication and there has been no signi fi cant fi nancial support for this work that could have in fl uenced its outcome.
We appreciate f i nancial support by the National Natural Science Foundation of China(No.41372324).The support from the Chinese Special Funds for Major State Basic Research Project under Grant No.2010CB732001 is also appreciated.
Hoek E,Kaiser PK,Bawden WF.Support of underground excavations in hard rock. Rotterdam:A.A.Balkema;1995.p.215.
Hu HT,Yin YP.Theory and evaluation methods of regional crust stability“safety island”.Earth Science Frontiers(China University of Geosciences,Beijing) 1996;3(1/2):57-68(in Chinese).
Hudson JA,Harrison JP.A new approach to studying complete rock engineering problems.Quarterly Journal of Engineering Geology 1992;25:93-105.
Langer M.Principles of geomechanical safety assessment for radioactive waste disposal in salt structures.Engineering Geology 1999;52(3-4):257-69.
Li SH,Wu XY,Ma FS.Application of precedent type analysis(PTA)in the construction of Ertan hydro-electric station,China.International Journal of Rock Mechanics and Mining Sciences 1998;35(6):787-95.
Luo GY,Wu H.Theory of preferred plane in neotectonics analysis for geotechnical investigation.Beijing:Geological Publishing House;1991.pp.1-148(in Chinese).
Saaty TL.Decision making with the analytic hierarchy process.International Journal of Services Sciences 2008;1(1):83-98.
Shang YJ,Li SH,Li K,Song J,Sun YC.The deformation rate ratio criterion(DRRC): from empirical hypothesis to decision verif i cation.Global view of engineering geology andtheenvironment.London:Taylor&FrancisGroup;2013. pp.675-83.
Shang YJ,Cai JG,Hao WD,Wu XY,Li SH.Intelligent back analysis of displacements fortunnelinginChina.TunnelingandUndergroundSpaceTechnology 2002;17(4):381-9.
ShangYJ,WangSJ,LiGC,YangZF.Retrospectivecaseexampleusinga comprehensive suitability index(CSI)for sitting the Shisanling power station, China.InternationalJournalofRockMechanics&MiningSciences 2000;37(5):839-53.
Shang YJ,Yang ZF,Liu Y,Tang CH.Study of the prediction approaches on sally ports in geoengineering design.Journal of Engineering Geology 1996;4(4):15-24(in Chinese).
Shanxi Geology Bureau.Regional geological survey report(1:200,000,Yuxian County Sheet);1965(in Chinese).
Wang SJ.Meta-synthesis in the engineering geology.Journal of Engineering Geology 2011;19(1):1-5(in Chinese).
Yang ZF.System science and its application in engineering geomechanics.In:Key Laboratory of Engineering Geomechanics,Institute of Geology and Geophysics, Chinese Academy of Sciences,editor.The annual report of 1992.Beijing:Seismic Press;1993.pp.127-36(in Chinese).

Yanjun Shangis an Engineering geologist from Institute of Geology,ChineseAcademyofSciences(CAS).HegothisM.Sc. in Structural Geology and Geophysics at the Nanjing University and his Ph.D.in Hydrogeology and Engineering Geologyat the Institute of Geology,CAS in 1997.He has carried out more than 10 consulting projects on engineering site selection,geohazards investigation,and identif i cation of unfavorable geological bodies,e.g.soft rocks and hard soils for classif i cation of geomaterials so as to predict the construction-triggeredhazards.Hehaspublishedmorethan 160 papers in Chinese and English and is the author of 2 books.AsamemberofIAEGandofISRM,hewasthekeynote speakerinmanyconferencesinChinaandothercountries.In 2006 he obtained the Richard Wolters prize of the IAEG.
*Corresponding author.Tel.:+86 10 82998634.
E-mail address:jun94@mail.igcas.ac.cn(Y.Shang).
Peer review under responsibility of Institute of Rock and Soil Mechanics,Chinese Academy of Sciences.
Journal of Rock Mechanics and Geotechnical Engineering2014年4期