Dam foundation excavation techniques in China: A review

2013-07-10 12:24:46YuzhuZhangWenboLuMingChenPengYanYingguoHu

Yuzhu Zhang, Wenbo Lu, Ming Chen, Peng Yan, Yingguo Hu

StateKeyLaboratoryofWaterResourcesandHydropowerEngineeringScience,WuhanUniversity,Wuhan430072,China

Dam foundation excavation techniques in China: A review

Yuzhu Zhang, Wenbo Lu?, Ming Chen, Peng Yan, Yingguo Hu

StateKeyLaboratoryofWaterResourcesandHydropowerEngineeringScience,WuhanUniversity,Wuhan430072,China

A R T I C L E I N F O

Articlehistory:

Received 27 February 2013

Received in revised form 24 July 2013

Accepted 6 August 2013

Dam foundation

Protective layer (PL)

Excavation

Blasting

Rapid construction

A protective layer (PL) is commonly reserved above foundation surface to protect the underlying rock mass during dam foundation excavation. In China, the PL of dam foundation is conventionally subdivided into two or three thin layers and excavated with the shallow-hole blasting method, even by pneumatic pick method in case of soft rock mass. The aforementioned layered excavation of the PL delays the construction of the whole project. After nearly 30-year practices, several safe and efficient methods for the PL excavation of dam foundation are gradually developed. They include shallow-hole bench blasting with cushion material (SBC) at the bottom of the hole, and horizontal smooth blasting (HSB). The PL is even cancelled on the condition that horizontal pre-split technique is employed during dam foundation excavation. This paper introduces the aforementioned two PL excavation methods (shallow-hole blasting and bench blasting) and horizontal pre-split technique of dam foundation without protective layer (HPP). The basic principles of blasting method, blasting geometry, charge structure, drill-and-blast parameters of typical projects are examined. Meanwhile, the merits and limitations of each method are compared. Engineering practices in China show that HSB is basically the optimal method for dam foundation PL excavation in terms of foundation damage control and rapid construction. Some new problems for dam foundation PL excavation arising, such as strong unloading and relaxation phenomenon that encountered in the gorge region of southwest China, are needed to be addressed; and the corresponding countermeasures are discussed as well.

? 2013 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V. All rights reserved.

1. Introduction

With the rapid development of economy, a sharp increasing demand for electricity is required in China in the last three decades. As a result, many large-scale hydropower projects have been completed or are under construction in China (Jia et al., 2010), as shown in Table 1. Construction of hydropower projects often involves large-scale and high-intensity excavation, whilst drill-and-blast method is still the main method for rock dam foundation excavation. The dam foundation surface serves as the bearing surface, and it should be noted that water pressure is acting on the bedrock where the weak interfaces between the dam and the bedrock are observed. Therefore, the stabilities of the reservoir-dam system and the bedrock are critically important during dam foundation excavation by blasting. In the process of dam foundation excavation, weathered and other weak rocks need to be fragmented by blasting and removed. Meanwhile, blasting-induced damage should be strictly controlled, especially in the regions in the vicinity of the designed excavation contours such as the foundation surface. Hence, close attention has been paid to blasting techniques which are employed on dam foundation surface.

Generally, the following four steps are taken during dam foundation excavation, i.e. (1) removing the loose rock mass before excavation, (2) excavating the main rock body at a certain distance above the planned foundation level, (3) excavating reserved rock mass near the planned foundation level, and (4) cleaning the foundation (Murphy et al., 1976; Novozhilov and Oganesyan, 1978; Mgalobelov, 2000; Kühnel, 2004).

In Europe and USA, the main rock body at a certain distance above the planned foundation level is usually excavated by loosening blasting method combined with controlled perimeter blasting techniques, such as pre-splitting, cushion blasting or smooth blasting. The selection of specific blasting method and thickness of the reserved rock mass are generally left to the contractor. The reserved rock mass near the planned foundation level is usually excavated by shallow-hole blasting or prying with hydraulic excavator.

In the former Soviet Union, during the dam foundation excavation process, a protective layer (PL) above the designed foundationsurface must be reserved. The main body of the rock mass is excavated by bench blasting, and the PL will be excavated by the controlled perimeter blasting. In China, this former Soviet Union’s method was adopted in dam foundation excavation before 1980s. Typical dam foundation excavation method is shown in Fig. 1.

Table 1 Statistics of dam construction in China.

The thickness of the PL is determined associated with the geometry of blasting-induced damage zone (BDZ). The BDZ is generally defined as the rock zone beyond the excavation boundary where the physical, mechanical and hydraulic properties of the rock mass have been significantly affected due to blasting excavation (Cai and Kaiser, 2005; Blümling et al., 2007; Malmgren et al., 2007; Wu et al., 2009; Bastante et al., 2012). The larger the BDZ is, the thicker the PL is. In gorge regions with high in situ stress, rapid excavation of rock mass will lead to a quick release of in situ stress that induces an excessive deformation and a bigger excavation-induced damage zone (EDZ) during dam foundation excavation (Li et al., 2010; Duan et al., 2011; Chen et al., 2012).

According to theConstructionTechnicalSpecificationsonRock FoundationExcavatingEngineeringofHydraulicStructuresinChina(DLT5389-2007), the thickness of the PL in the vicinity of the horizontal foundation surface should be determined by in situ blasting test. If an in situ blasting test is difficult to perform, a thickness of 25–40 times the cartridge diameterDof the last layer for bench blasting is proposed, as shown in Table 2. The thickness of dam foundation PL of some newly constructed large-scale projects (Luo and Shen, 2003; Bao and Wan, 2006; Zhao et al., 2008; Guan and Yuan, 2009) is listed in Table 3.

Fig. 1. Typical dam foundation excavation method in China.

Table 2 PL thickness H proposed in technical specifications by National Development and Reform Commission of People’s Republic of China (2007).

2. Layered excavation of dam foundation protective layer

The layered blasting excavation of the PL has been employed in China for several decades since 1960s. In the current technical standard DLT5389-2007, the conventional layered blasting excavation is still suggested as a reliable method for dam foundation PL excavation. The 3-layer PL excavation should be considered, and the excavation of each layer is strictly controlled. Typical procedure of layered blasting excavation of PL is shown in Fig. 2.

(1) The first layer

Shallow-hole bench blasting should be adopted. After the excavation of the first layer, the remaining thickness of the PL should be not less than 1.5 m. Cartridge diameter should be less than 40 mm.

(2) The second layer

For the second layer, the single-hole blasting method should be adopted. After the excavation of the second layer, for intact/hard or relatively intact/hard rock mass, the remaining thickness should be not less than 0.5 m; for jointed/soft rock mass, the remaining thickness should be not less than 0.7 m. The angle between the drilling hole and the horizontal foundation surface should be not less than 60?. Cartridge diameter should be less than 32 mm.

(3) The third layer

For intact/hard or relatively intact/hard rock mass, the drilling hole should not go through the horizontal foundation surface; for jointed/soft rock mass, the bottom of drilling hole should be 0.2 m above the horizontal foundation surface, and the final 0.2 m of rock mass should be excavated by prying. The provisions for angle of the drilling hole and cartridge diameterand detonating method are the same as those for the second layer.

Table 3 Thickness of dam foundation PL of some newly constructed large-size projects (Luo and Shen, 2003; Bao and Wan, 2006; Zhao et al., 2008; Guan and Yuan, 2009).

Fig. 2. Typical procedure of layered blasting excavation of PL.

The idea of bench blasting with shallow-hole and thin-layers is preferable owing to the strict control of the BDZ. However, the construction speed of the PL excavation is signi ficantly reduced due to such a layered excavation method (Zhang, 2003). Different from the general construction projects, hydropower projects usually have a large investment and a long construction period. It is of great significance for the rapid construction of hydropower projects. Engineers and researchers in China have made great efforts to revise the conventional layered excavation method and develop some new methods that are safer and more ef ficient.

3. New methods for dam foundation protective layer excavation

Production experiments of some excavation methods (shallowhole bench blasting with cushion at the bottom of hole (SBC), horizontal pre-split of dam foundation without PL (HPP)) had been proposed for some large-size hydropower projects since 1970s. The examples are Gezhouba (Yangtze River, Hubei Province) in 1971 (SBC), Dongjiang (Xiangjiang River, Hunan Province) in 1978 (HPP). However, the first technical standard of dam foundation excavation, i.e.ConstructionTechnicalSpeci ficationsonRock FoundationExcavatingEngineeringofHydraulicStructures(SDJ211-83) (Ministry of Water Resources and Electric Power of People’s Republic of China, 1983) in China, layered blasting was required in PL excavation of dam foundation.

With the progress of theories and practices in engineering, some modi fications were made inConstructionTechnicalSpeci fications onRockFoundationExcavatingEngineeringofHydraulicStructures(SL47-94) (Ministry of Water Resources and Ministry of Electric Power Industry of the People’s Republic of China, 1994). In SL47-94, the layered blasting excavation method was recommended, but it also pointed out that blasting methods for dam foundation excavation with or without PL could be adopted if they were proven to be feasible by blasting test. During this period, one-time blasting excavation methods for dam foundation with or without PL were used in many large-scale hydropower projects, such as Longtan (Hongshui River, Guangxi Zhuang Autonomous Region), Xiaowan (Lancang River, Yunnan Province), Gaobazhou (Qingjiang River, Hubei Province), Xiluodu (Jinsha River, Sichuan Province and Yunnan Province), etc., and good engineering and economic bene fits have been achieved.

In the current technical standard DLT5389-2007, some new methods, such as SBC, HSB, HPP, are recommended for the first time, as they are proven to be feasible by blasting test, and the layered blasting excavation is just reserved but no longer recommended as the preference method.

Statistics of dam foundation excavation methods for part of the large-scale hydropower projects in China are listed in Table 4.

3.1.Shallow-holebenchblastingwithcushionatthebottomof hole

In 1982, the SBC was proposed and then applied to production excavation of dam foundation PL at Wanan hydropower station (Ganjiang River, Jiangxi Province). Since then, this method was employed in several other projects, such as Dongfeng hydropower station (Wujiang River, Guizhou Province), Geheyan hydropower station (Qingjiang River, Hubei Province), first-phase longitudinal cofferdam of the Three Gorges Project (Yangtze River, Hubei Province), etc.

Fig. 3. Schematic diagram of stress wave interaction on the interface of explosive and cushion. Aris the amplitude of the reflection wave.

3.1.1.Basicprinciples

The schematic diagram of stress wave interaction on the interface of explosive and cushion is shown in Fig. 3. The stress state of the bedrock beneath the blasting hole can be effectively ameliorated by setting a flexible cushion at the bottom of the blasting hole. Generally, the sonic impedance of cushion material (ρ1C1) is smaller than that of explosive (ρ0C0). When the detonation wave strikes the interface of explosive and cushion materials, the reflection and transmission of detonation wave would occur on the interface, and the amplitude of transmitted wave can be written as

whereAtandA0are the amplitudes of transmitted wave and incident wave, respectively; ρ0and ρ1are the densities of explosive and cushion material, respectively;C0andC1are the sound wave velocities of explosive and cushion material, respectively.

As a consequence, the stress wave acting on the bedrock under the borehole is reduced. When the stress is reduced to a value less than the ultimate compressive strength and the ultimate tensile strength of the bedrock, effective protection of the bedrock can be achieved.

3.1.2.Technicalpoints

(1) Reasonable cushion materials with low sonic impedance

Cushion design basically includes three parts, namely the cushion length, the cushion location and the cushion materials. In general, the cushion should be set above the foundation surface, and the cushion length should not be too large in order to avoid excessive blasting toes.

According to the action principle of the cushion, it can be seen that the smaller the wave impedance of cushion materials is, the better protection effect the bedrock will get. Currently, the cushion materials commonly used in projects include sawdust, rock debris, polyethylene foam, bamboo tube, wood, etc. In practice, blasting effect and economic evaluation of different cushion materials will be screened in optimum design. Cushion design parameters of typical projects (Pan, 1994; Xu and Lin, 1999; Zhen, 1999) are shown in Table 5.

(2) Shallow-hole blasting

In shallow-hole blasting, the low bench and the small diameter boreholes are adopted, which is one of the important means to reduce the charge per delay interval and blasting vibration. In engineering practices, the bench height is usually less than 5 m, and the borehole diameter is usually less than 50 mm.

(3) Detonating hole by hole

Detonating hole by hole, namely millisecond delay blasting, which would transform a big charge of blasting into a seriesof continuous small-dose blasting, can improve rock-breaking capacity of explosive, and reduce blasting vibration.

Reasonable selection of delay interval, which is generally selected by empirical estimation method in engineering field, has major impacts on blasting effect. The commonly used empirical estimation method in China is pioneered by Zhengyu Zhang from Yangtze River Scientific Research Institute (Zhang, 2003). According to related calculation results and engineering practices, the commonly used delay interval between boreholes often falls into the period of 5–40 ms.

Table 4 Statistics of dam foundation excavation methods for some large-size hydropower projects in China.

Table 5 Cushion design parameters of typical projects (Pan, 1994; Xu and Lin, 1999; Zhen, 1999).

3.1.3.Typicaldrill-and-blastdesign

The typical profile of the drill-and-blast design for SBC and its charge structure are shown in Figs. 4 and 5, respectively. The drilland-blast parameters of SBC at Ertan hydropower station (Pan, 1994) are also listed in Table 6.

3.2.Horizontalsmoothblasting

Smooth blasting belongs to controlled contour blasting technology that is widely used in the excavation work of hydropower projects. Recently, horizontal smooth blasting for the PL excavation has been used in many large-scale water resources and hydropower projects, such as Three Gorges Project (Yangtze River, Hubei Province), Xiluodu hydropower station (Jinsha River, Sichuan Province and Yunnan Province), etc., and good results are achieved.

Fig. 4. Profile of blasting geometry for SBC.

3.2.1.Basicprinciples

One of the characteristics of explosive detonating in a borehole is that the energy of shock wave is transmitted from the borehole in a very non-discriminating fashion, which means that the shock energy will propagate from the hole to the surrounding rock mass independent of direction. Consequently, the fragmentation of targeted rock mass and the blasting-induced damage of the reserved rock mass will occur.

With intensive drilling on the designed contour line and other relative technical measures, energy will be guided to form the crack between boreholes on the designed contour line in the process of smooth blasting. As a result, the amount and the length of other cracks around the borehole will be reduced observably. Thus, blasting-induced damage of the reserved rock mass will be reduced and a smooth excavation surface will be achieved.

3.2.2.Technicalpoints

(1) Reasonable distance between the spacing and the overburden depth

Fig. 5. Charge structure of SBC. Lc, length of cushion material; Le, length of charge; Ls, length of stemming; D, diameter of borehole; d, diameter of charge.

Engineering experience shows that the quality of the foundation surface depends mainly on the relationship between the spacing (S) and the overburden depth (B). Generally,S/B≤ 0.8 is reasonable, which means that the overburden depth should not be much too small as compared to the spacing.

(2) Detonating at the same time

Cracks growing independently of direction will propagate in a borehole when using explosive detonating. If explosives in the adjacent boreholes are detonated at the same time, a break-through crack between adjacent boreholes will be formed more easily and the amount and the length of other cracks are reduced. It is shown in the experiments by Langefors and Kihlstr?m (1978) that the contour of instantaneous blasting and millisecond delay blasting (less than 100 ms) is superior to that of detonating hole by hole. In practical projects, detonating cord is usually used to reduce the delay of detonating.

(3) Decoupling charge

Decoupling charge is one of the main methods for smooth blasting. By decoupling charge, an optimum charge may be obtained, which is able to form a penetrated crack between adjacent boreholes but not bigger enough to cause unexpected damage to the reserved rock mass. In practical projects, radial decoupling and axial decoupling are achieved by string-shaped charge.

(4) Drilling precision

Drilling quality is another important aspect in smooth blasting. Due to the poor quality of drilling, poor excavation quality incidents sometimes may occur. Both of the deviation of drilling location and drilling angle will affect excavation quality. When the deviation is serious, the contour surface may not be well formed. According to the code DLT5389-2007, in smooth blasting, the deviation of drilling location should be limited in 50 mm, the deviation of drilling angle should be limited in 1?, and unevenness of the excavated surface should be less than 15 cm. Half-cast ratio is also strictly restricted, as shown in Table 7.

Table 6 Drill-and-blast parameters of SBC at Ertan hydropower station (Pan, 1994).

3.2.3.Typicaldrill-and-blastdesign

The typical profile of the drill-and-blast design for HSB and its charge structure are shown in Figs. 6 and 7, respectively. The drilland-blast parameters of HSB at Three Gorges Project (Wang, 2003) are also listed in Table 8.

4. Horizontal pre-split of dam foundation without protective layer

Since its first application in the dam foundation excavation of Dongjiang hydropower station (Xiangjiang River, Hunan Province) in 1979, horizontal pre-split of dam foundation without PL has been used in many water resources and hydropower projects, such as diversion tunnel of the Three Gorges Project (Yangtze River, Hubei Province), Jinshuitan hydropower station (Oujiang River, Zhejiang Province), etc.

Table 7 Half-cast ratio required in technical specifications by National Development and Reform Commission of People’s Republic of China (2007).

4.1.Basicprinciples

The characteristics of pre-split holes are intensively drilled on the designed contour line and decoupling charged. In the process of pre-split blasting, the pre-split charge is firstly detonated to form pre-split crack. The main body of the rock mass is blastingexcavated under the protection of the pre-split cracks, in order to protect the rocks beneath the foundation surface.

The protective effect using the pre-split crack technique on remaining rock mass is mainly re flected in the following two aspects. First, shock wave transited to the remaining rock mass decays because of the re flection of the pre-split crack, so blasting vibration is mitigated. Second, the detonation cracks will be blocked by the pre-split crack and cannot extend to the remaining rock mass.

4.2.Technicalpoints

Both pre-split blasting and smooth blasting are controlled contour blasting techniques that are designed to reduce the BDZ, to control the generation and development of the detonation cracks, and to protect the remaining rock mass and form the excavationcontour surface. The basic concepts and the main technical points are similar, but the differences are the specific processes and the selection of parameters.

Fig. 6. Profile of blasting geometry for HSB.

Fig. 7. Charge structure of HSB. Lbis the length of bottom charge.

In addition, the excavation of pioneer slot should be conducted firstly in the process of horizontal pre-split blasting for the dam foundation excavation. It is helpful for the improvement of blasting quality, speeding up construction progress for site-specific terrain when excavating the pioneer slot.

Table 8 Drill-and-blast parameters of HSB at the Three Gorges Project (permanent shiplock foundation) (Wang, 2003).

4.3.Typicaldrill-and-blastdesign

The schematic diagram of the pioneer slot excavation in HPP at Laxiwa hydropower station (Dong et al., 2007) is shown in Fig. 8. The typical profile of the drill-and-blast design for HPP and its charge structure are shown in Figs. 9 and 10, respectively. The drill-and-blast parameters of HPP at the Three Gorges Project (spillway dam section) (Zhen, 2000) are also listed in Table 9.

Fig. 8. Schematic diagram of pioneer slot excavation in HPP at Laxiwa hydropower station (Dong et al., 2007).

Fig. 9. Profile of blasting geometry for HPP.

5. Comparison of different excavation methods of protective layer

The evaluation of rapid construction methods for dam foundation PL mainly includes blasting excavation effect, engineering construction speed, cost, etc. Specially, blasting excavation effect is mainly reflected in damaged zone of the remaining rock mass and the quality of the foundation surface.

Taking Wanan hydropower station (Ganjiang River, Jiangxi Province) and engineering practices in Yantan and Ertan hydropower stations for examples, it can be observed that good blasting excavation effect can be obtained by SBC. For the cases such as Longtan, Laxiwa, Xiangjiaba and Xiluodu hydropower stations, it can be shown that, using contour control blasting technologies, we can get a good excavation contour surface and good blasting effect by both HSB and HPP.

Blasting excavation process can be speeded up by using SBC, but compared to HSB and HPP, quality of the foundation surface is not so good and more subsequent work of foundation surface processing is needed. Good blasting excavation effect can be achieved by HPP, but construction progress is restricted by the excavation of the pioneer slot, and this method is appropriate only when foundation surface area to be excavated is relatively small or terrain condition is relatively good. Comparison between different dam foundation PL excavation methods is shown in Table 10. By using HSB, the excavation quality is guaranteed and the construction progress can be speeded up, thus HSB is suggested as a priority method for dam foundation PL excavation.

6. Problems for protective layer excavation in high in situ stress regions

Fig. 10. Charge structures of HPP.

Most of the large-scale hydropower projects under construction or to be constructed are located in the deep valley regions in Southwest China where high in situ stress is one of the challenges in dam engineering construction. Strong rock unloading and relaxation induced slabbing occurred in dam foundation excavation ofXiaowan hydropower station (Liu et al., 2008; Qi et al., 2008; Huang et al., 2010). Typical unloading fissure in the dam foundation excavation of Xiaowan hydropower station is shown in Fig. 11. During the dam foundation excavation at great depth, the high in situ stress is suddenly released and unloading fissures are consequently induced. The unloading fissures are roughly classi fied into three types, i.e. successive fissures stretching along the initial tectonic fissures, extending extensive fissures controlled by the initial tectonic fissures, and fresh fissures newly born during excavation or after excavation process (Qi et al., 2008; Ma, 2009).

Table 9 Drill-and-blast parameters of HPP at the Three Gorges Project (spillway dam section) (Zhen, 2000).

Table 10 Comparison between different dam foundation PL excavation methods.

In order to control unloading and relaxation deformation of dam foundation, main techniques in the dam foundation excavation process were used. First, the PL should be reinforced by anchors before blasting excavation. Then, foundation surface should be anchored timely with prestressed anchors before excavation. Finally, dam concrete should be employed immediately when excavation is completed to cover the foundation surface.

Fig. 11. Typical unloading fissure in the dam foundation excavation of Xiaowan hydropower station.

7. Conclusions

Foundation PL excavation is an important issue in the construction of hydropower projects in China. The safe operation of the whole project is directly affected by foundation excavation quality, and the construction schedule of the entire project is affected by foundation excavation speed.

The PL excavation often in fluences the construction schedule. Thus, related dam foundation PL excavation regulations should be strictly reinforced in China. Therefore, in the construction of hydropower projects, the engineering quality should be ensured to improve the construction speed.

At present, researches on the PL excavation are focusing on two issues: on the one hand, how to improve blasting quality and ef ficiency associated with the construction processes; on the other hand, further exploration on the blasting-induced damage failure criterion and the feasibility of the abolition of PL of dam foundation. At the same time, further research should be also carried out on the problems of dam foundation PL excavation encountered in alpine and gorge regions with high in situ stress.

Acknowledgements

This work is supported by the National Science Fund for Distinguished Young Scholars of China (51125037), the National Key Basic Research Program (973 Program) of China (2011CB013501), the National Natural Science Foundation of China (51279135 and 51079111) and the Doctoral Scienti fic Fund Project of the Ministry of Education of China (20110141110026). The authors wish to express their thanks to all supporters.

Bao YL, Wan JL. The innovation on foundation excavation for Laxiwa double arch dam. Journal of Northwest Hydroelectric Power 2006;22(5):79–81 [in Chinese].

Bastante FG, Alejano L, Gonzalez-Cao J. Predicting the extent of blast-induced damage in rock masses. International Journal of Rock Mechanics and Mining Sciences 2012;56:44–53.

Blümling P, Frederic B, Patrick L, Martin CD. The excavation damaged zone in clay formations time-dependent behaviour and influence on performance assessment. Physics and Chemistry of the Earth 2007;32(8–14):588–99.

Cai M, Kaiser PK. Assessment of excavation damaged zone using a micromechanics model. Tunnelling and Underground Space Technology 2005;20(4):301–10.

Chen SH, Wang GJ, Zhou H, Wang WM, Zou LC. Evaluation of excavation-induced relaxation and its application to an arch dam foundation. International Journal for Numerical and Analytical Methods in Geomechanics 2012;36(2):166–81.

Dong B, Hou XT, Wang YB. Foundation excavation of high double-curvature arch dam of Laxiwa hydropower station. Water Power 2007;33(11):59–61 [in Chinese].

Duan SH, Ren QW, Chen JP, Li Q. Study on the performance of arch dam influenced by relaxation of the foundations following excavation. Science China Technological Sciences 2011;54(5):1177–82.

Guan SJ, Yuan XC. Excavation construction and supervision for dam foundation of Jinping dam. Yangtze River 2009;40(18):61–3 [in Chinese].

Huang RQ, Lin F, Yan M. Deformation mechanism and stability evaluation for the left abutment slope of Jinping I hydropower station. Bulletin of Engineering Geology and the Environment 2010;69(3):365–72.

Jia JS, Yuan YL, Zheng CY, Ma ZL. Dam construction in China: statistics, progresses and concerned issues. Water Power 2010;36(1):6–10 [in Chinese].

Kühnel M. Leibis/Lichte dam in Germany. Engineering Geology for Infrastructure Planning in Europe 2004;104:585–92.

Langefors U, Kihlstr?m B. The modern technique of rock blasting. 3rd ed. Stockholm: John Wiley & Sons; 1978.

Li TC, Yang ZG, Wang RK, Zhao LH. Influence of construction method of arch dam foundation replacement block on dam safety. Earth and Space 2010: Engineering, Science, Construction, and Operations in Challenging Environments. In: Proceedings of the 12th international conference. Honolulu, Hawaii. United States: American Society of Civil Engineers; 2010. p. 777–86.

Liu J, Qiao LP, Li PJ, Yuan FB, Li P. Study of excavation disturbance and anchoring effects of high-geostress dam foundation slope of Laxiwa hydropower engineering. Chinese Journal of Rock Mechanics and Engineering 2008;27(6):1094–103 [in Chinese].

Luo YY, Shen SZ. Application of controlled blasting technology in dam foundation excavation of Longtan hydropower station. Hongshui River 2003;22(3):43–5 [in Chinese].

Ma HQ. Technical difficulties in the construction of Xiaowan hydropower station. Hydro-Science and Engineering 2009;4:11–6 [in Chinese].

Malmgren L, Saiang D, Toyra J, Bodare A. The excavation disturbed zone (EDZ) at Kiirunavaara Mine, Sweden—by seismic measurements. Journal of Applied Geophysics 2007;61(1):1–15.

Mgalobelov YB. Advanced techniques in design and building concrete dams. Hydrotechnical Construction 2000;34(8):415–22.

Ministry of Water Resources and Electric Power of People’s Republic of China. Construction technical specifications on rock-foundation excavating engineering of hydraulic structures (SDJ211-83). Beijing: China Water Power Press; 1983 [in

Chinese].

Ministry of Water Resources and Ministry of Electric Power Industry of People’s Republic of China. Construction technical specifications on rock-foundation excavating engineering of hydraulic structures (SL47-94). Beijing: China Water Power Press; 1994 [in Chinese].

Murphy DK, Levay J, Rancourt M. The LG-2 underground powerhouse. In: Rapid excavation and tunnelling conference. Las Vegas: Society of Mining Engineers of the American Institute of Mining, Metallurgical, and Petroleum Engineers; 1976. p. 515–33.

National Development and Reform Commission of People’s Republic of China. Construction technical specifications on rock foundation excavating engineering of hydraulic structures (DLT5389-2007). Beijing: China Water Power Press; 2007 [in Chinese].

Novozhilov MS, Oganesyan GA. Preparation of the foundation for a high rolled-fill earth dam. Power Technology and Engineering 1978;12(4):340–4.

Pan XF. Dam foundation excavation of Ertan hydropower station. Sichuan Water Power 1994(Suppl. 1):47–9 [in Chinese].

Qi SW, Wu FQ, Zhuang HZ, Liu T, Yan CG, Chai JF. Characteristics of unloading fissures in dam’s base of Xiaowan hydropower station. Chinese Journal of Rock Mechanics and Engineering 2008;27(Suppl. 1):2907–12 [in Chinese].

Wang GQ. Controlled blasting excavation technique of permanent lock of Three Gorges Project. Journal of Yangtze River Scientific Research Institute 2003;20(Suppl. 1):85–8 [in Chinese].

Wu FQ, Liu T, Liu JY, Tang XL. Excavation unloading destruction phenomena in rock dam foundations. Bulletin of Engineering Geology and the Environment 2009;68(2):257–62.

Xu NF, Lin WL. Dam foundation excavation and treatment design of Geheyan hydraulic project. Yangtze River 1999;30(7):18–20 [in Chinese].

Zhang ZY. Modern hydropower engineering blasting. Beijing: China Water Power Press; 2003 [in Chinese].

Zhao L, Tao M, Wu G. The excavation technique at the trenches of the dam abutment on left bank of the Xiluodu hydropower station on the Jinshajiang River. In: Proceedings of the 9th national conference on engineering blasting. Beijing: Metallurgical Industry Press; 2008. p. 203–10 [in Chinese].

Zhen HP. Excavation blasting of protective layer of rock foundation at floodway of Three Gorges. Blasting 2000;17(Suppl. 1):203–6 [in Chinese].

Zhen HP. Excavation of protective coverage for foundation rock of Three Gorges Dam. Blasting 1999;16(2):59–61 [in Chinese].

Yuzhu Zhangreceived his BS degree in Water Resources and Hydropower Engineering from Wuhan University, Wuhan, China. He is now a PhD student in Construction and Management of Water Resources and Hydropower Engineering from Wuhan University. His main research interest is construction technology of water resources and hydropower engineering. His research is centred in formation mechanism and detecting techniques of blasting-induced damage zone (BDZ). Currently his main focus is the improvement and application of sonic detection technique in rock.

?Corresponding author. Tel.: +86 27 68772221.

E-mail address: wblu@whu.edu.cn (W. Lu).

Peer review under responsibility of Institute of Rock and Soil Mechanics, Chinese Academy of Sciences.

1674-7755 ? 2013 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V. All rights reserved.

http://dx.doi.org/10.1016/j.jrmge.2013.08.002

主站蜘蛛池模板: 91精品综合| 91在线视频福利| 1级黄色毛片| 福利国产在线| 亚洲天堂网在线观看视频| 自拍亚洲欧美精品| 无码专区国产精品一区| yjizz视频最新网站在线| 免费毛片a| 久久a毛片| 亚洲最大福利网站| 国产精品人人做人人爽人人添| 国产黄在线观看| 色偷偷综合网| 久青草免费视频| 欧美中文字幕在线播放| 午夜高清国产拍精品| 日韩久草视频| 国产不卡国语在线| 美女潮喷出白浆在线观看视频| 欧美成人a∨视频免费观看| 亚洲不卡av中文在线| 精品乱码久久久久久久| 欧美激情,国产精品| 无码福利日韩神码福利片| 欧美成人a∨视频免费观看 | 91视频区| yy6080理论大片一级久久| 2020最新国产精品视频| 亚洲欧洲日产无码AV| 手机精品福利在线观看| 亚洲色欲色欲www网| 国语少妇高潮| 三区在线视频| 色综合天天综合| 伊人色婷婷| 亚洲成网777777国产精品| 亚洲a级在线观看| 亚洲清纯自偷自拍另类专区| 国产微拍精品| 国产网站免费看| 99久久亚洲精品影院| 亚洲第一区欧美国产综合| 国产日韩AV高潮在线| 欧美高清三区| 亚洲日韩日本中文在线| 午夜视频免费一区二区在线看| 成人午夜精品一级毛片| 国产精品专区第1页| 欧美精品一区在线看| 波多野结衣中文字幕一区二区| 人妻一本久道久久综合久久鬼色| 在线观看免费国产| 一本大道东京热无码av| 91精品国产无线乱码在线| 99re免费视频| 免费看av在线网站网址| 色悠久久综合| 国产精品专区第一页在线观看| 久久久久亚洲精品成人网 | 99er精品视频| 午夜性刺激在线观看免费| 欧洲高清无码在线| 88av在线| 国产综合精品日本亚洲777| 亚洲精品国产综合99| 成人av手机在线观看| 久久永久免费人妻精品| 国产成人无码久久久久毛片| 99人妻碰碰碰久久久久禁片| 久久久国产精品免费视频| 日韩欧美国产另类| 亚洲男人的天堂视频| 亚洲欧美成人在线视频| 国产精品成人不卡在线观看 | 国产精品福利一区二区久久| 国产真实乱子伦视频播放| 国产精品成人免费视频99| 国产真实乱子伦视频播放| 亚洲中文字幕日产无码2021| 99re免费视频| 亚洲欧州色色免费AV|