999精品在线视频,手机成人午夜在线视频,久久不卡国产精品无码,中日无码在线观看,成人av手机在线观看,日韩精品亚洲一区中文字幕,亚洲av无码人妻,四虎国产在线观看 ?

Investment Projects in Heilongjiang Province, China

2012-04-29 00:00:00
China’s foreign Trade 2012年9期

rbin Content and scale of project: The project covers 10 km2 with gross investment RMB 1.5 billion. It will be impleme","Introduction":"","Columns":"Information","Volume":"","Content":"

Name of project: University Town Project in the New Industrial Town,South of Harbin

Content and scale of project: The project covers 10 km2 with gross investment RMB 1.5 billion. It will be implemented in two stages. The stage one project’s planning area is 5 km2 to hold 3 to 4 colleges and universities and the stage two planning area 5 km2 land will serve as the construction land to introduce domestic and overseas famous universities. Project overview: 1. Stick to marketization operation, increase the policy support and build the Pingfang District University Town as a nationwide relatively influential open and garden university town in 5-10 years. Introduce 3-5 domestically famous universities or scientific research institutions to settle down in the University Town and warmly welcome famous universities and scientific research institutions at home and aboard to settle down and develop here. 2. Public utility system: including science technology museum, stadium, green belts, roads, water supply and power supply projects; 3. Service guarantee system: The logistics service facilities include dormitories of students, canteens, hospitals, middle and primary schools, kindergartens, etc. 4. By 2015, the number of school students and faculties will reach about 70,000. Investment and source: Gross investment is USD 219 million, and the investment promotion proportion is negotiable.

Cooperation means: Joint venture, cooperation, sole proprietorship, or other ways negotiable.

Estimated economic benefit: Regular annual business income is estimated to be RMB 1 billion and the profit will be RMB 500 million.

Brief introduction to domestic investor:

1. Name of investor: Pingfang District Investment Promotion Bureau

2. Address: New Industrial Town, South of Harbin

3. Contact: Zhao Haitao

4.Tel: 86-451- 86549077

5. Fax: 86-451-86527733

6. Email: zhtpingfang@163.com

Name of project: Industrialization of Large-Scale Wind Turbines in Harbin Economic Development Zone Content and scale of project: Build 20,000 m2 assembl workshops and warehouses in 2010, construct 3,000 m2 office and R D buildings, and realize the production and storage capacity of 850,000 Kw large-scale wind turbines every year.

Project overview: Harbin Hafei Industry Co., Ltd. has been devoted to design, manufacture, installation, debugging and technical service work of large-scale wind turbines since 2003 and it has finished installation and debugging of 1.0MW wind turbines and independent research development work of 1.5MW half-directdrive variable speed constant frequency wind turbines. The sample machine was finished with installation and debugging in Yilan Wind Power Farm in early 2009, and the combination to the power grid and power generation was realized. Currently it is the first half-direct-drive wind turbine generator system with the independent intellectual property rights in China and Hafei is the pioneer company that masters the half-direct-drive wind turbine technology in China at present. This project has been listed in 2008 key new product development projects of Harbin City, and meanwhile it is listed in the collective construction project of Heilongjiang Province and Harbin City. Investment and source: The cost for single wind turbines is high, the orders are quite many and the demand for working capital is relatively much. As for the scale with annual production of 100 sets, the total estimated investment is about $ 58. 56 million. Hafei Industry plans to launch capital RMB 100 million (pay about RMB 50 million in advance already) and get financing RMB 300 million in stage. Lease current factory workshops, and build warehouses properly. The financed capital will be largely used as working capital for mass production in addition to a small proportion for necessary fixed assets investment. The RMB 600 million financing in stage two will be mainly used to purchase the land, build factory workshops and serve as the working capital to realize the production capacity with annual production of 500 wind turbines. Cooperation means: Joint venture and cooperation Estimated economic benefit: If the annual production capacity is 100 sets, the sales income will be RMB 900 million and the net profit rate will be 10.57%. Brief introduction to domestic investor:

1. Name of investor: Harbin Hafei Industrial Co., Ltd.

2. Address: Concentration Area, Hap

ing Road, Harbin Economic Development Zone

3. Contact: Liu Guoli and Wang Qingwei

4. Tel: 86-451-82312246

5. Fax: 86-451-82310931

6. Email: zszhygy@hdz.com

Name of project: Harbin Dongan Mechanical and Electrical Manufacture Project

Project overview: The mechanical and electrical products for autos mainly are altogether more than 30 kinds of products including oil pump series, water pump series, distribu- tor series, scrubber series, sensor series, throttle body series, electrical generators, etc., which are principally applied in Dongan Auto Engine, Dongan Mitsubishi, Tangshan Aisin Gear, Jiangxi Jiangling Gear, Hafei, Changchun FAW, Changhe, Cherry, Shanghai General Motor, etc. In 2009, output of major auto products was as follows: 490,000 sets of oil pumps, 600,000 sets of water pumps, 80,000 sets of sensors, 210,000 sets of throttle body, 240,000 sets of electrical generators, 220,000 sets of scrubber, and 34,000 sets of distributor. Expand the current production scale of mechanical and electrical products for autos, including water pumps, oil pumps, throttle body assemblies, etc. Investment and source: Plan to build a new auto engine production line with annual investment RMB 8-10 million within two years to shape the annual production capacity of 20,000 sets, and the estimated output value is RMB 60 million. RMB 50 million investment promotion is needed. Cooperation means: Joint venture and cooperation Estimated economic benefit: With the capital investment and equipment updating, it is predicted to shape annual production capacity of 1,000,000 sets of water pumps, 800,000 sets of oil pumps, 300,000 sets of throttle body, 400,000 sets of electrical generators, etc. in 2011. With the increasingly updating and reconstruction, it is predicted to realize the annual scale production of 1,500,000 sets of water pumps, 1,400,000 sets of oil pumps, 1,000,000 sets of throttle body, 1,000,000 sets of electrical generators, and 500,000 sets of sensors and have a certain market share in domestic main auto mechanical and electrical accessory markets. The output value is predicted to be RMB 500 million. Currently the auto accessories produced by our company have been close or beyond the break-even point. With the growing output, the profit will see relatively dramatic increase after 2011. Brief introduction to domestic investor:

1. Name of investor: Harbin Dongan Mechanical and Electrical Manufacture Co., Ltd.

2. Address: Concentration Area, Hap

ing Road, Harbin Economic Development Zone

3. Contact: Sun Tieli

4. Tel: 86-451-82310934

5. Fax: 86-451-82295165

6. Email: suntl-hdz@163.com

Name of project: Industrial Logistics Base Project in the New Industrial Town, South of Harbin

Content and scale of project: The planning area is 8km2, and the planned investment for the industrial logistics base is RMB 1.5 billion. 100 enterprises are predicted to have settled down here by 2015. Main buildings are logistics management center hall, logistics business section, parking assembly factory, warehouse logistics center, hotels and social apartments. Project overview: The planning area is 8km2 and the plan has been approved, so substantial development and construction has been carried out in all-around way; fix the legal subject, establish a new development mecha- nism and implement the enterprise management mode; the entire land is in reserve, land use formalities are handled in order, and “7-connection and one leveling”municipal infrastructure construction is coming to an end. 100 enterprises are expected to settle down here by 2015 to cater for the logistics and warehouse demands of 2,000 enterprises in Pingfang District and exert the role of Heilongjiang Province as the traffic hub to access to Jilin, Liaoning and cities inside Shanhaiguan Pass. Cooperation means: Joint venture and cooperation Estimated economic benefit: The regular annual business income is estimated to be RMB 1 billion and the profit is RMB 200 million.

Brief introduction to domestic investor:

1. Name of investor: New Industrial Town, south of Harbin 2. Address: 98, Youxie Street, Pingfang District

3. Contact: Zhao Haitao

4. Tel: 86-451- 86549077

5. Fax: 86-451-86527733

6. Email: zhtpingfang@163.com

Name of project: International Automobile Trade Town Project in the New Industrial Town, South of Harbin Content and scale of project: The project covers 2 km2 with total investment RMB 16 billion. The project will be implemented in two stages and the main content of the planning is: 1. Automobile culture exhibition center; 2. Automobile repair maintenance area; 3. 4S stores of brand automobiles; 4. Automobile warehouse logistics area; 5. Comprehensive service areas and other five subsections for municipal auxiliary facilities. Project overview: As the leading industry in the New Industrial Town, south of Harbin, the automobile industry begins to take shape in south of Harbin. The planning and development leadership team of the New Industrial Town in south of Harbin plans to take 2km2 land in the northeast of the crossing of Yunlianghe and BeijingHarbin Expressway for the international auto trade market development plan, which will be largest auto trade market in Northeast Asia with an integration of automobile sale, accessories, automobile transportation, etc. Therefore the plan for the International Automobile Trade Town in south of Harbin emerges because of demand. Investment and source: Gross investment RMB 16 billion Cooperation means: Joint venture and cooperation, single proprietorship or other ways negotiable

Estimated economic benefit: The regular annual business income is estimated to be RMB 5 billion and the profit is RMB 3.5 billion

Brief introduction to domestic investor:

1. Name of Investor: New Industrial Town, south of Harbin

2. Address: 98, Youxie Street, Pingfang District

3. Contact: Zhao Haitao

4. Tel: 86-451- 86549077

5. Fax: 86-451-86527733

6. Email: zhtpingfang@163.com

主站蜘蛛池模板: 国产特一级毛片| 亚洲有无码中文网| 国产成人亚洲精品蜜芽影院| 免费一级成人毛片| 国产成人高清精品免费| 国产精品视屏| 日韩欧美国产成人| 国产91在线|日本| 97久久精品人人| 久久免费精品琪琪| 91视频青青草| 2021国产精品自拍| 日本福利视频网站| 久久亚洲精少妇毛片午夜无码| 日韩a级毛片| 国产美女91视频| 欧美va亚洲va香蕉在线| 亚洲欧洲日产无码AV| 亚洲色精品国产一区二区三区| 潮喷在线无码白浆| 欧美日韩午夜| 久久人搡人人玩人妻精品| 国产福利免费在线观看| 国产精品第三页在线看| 999国内精品久久免费视频| 亚洲天堂网2014| 国产成人AV大片大片在线播放 | 亚洲综合天堂网| 污污网站在线观看| 亚洲综合欧美在线一区在线播放| 精品国产成人a在线观看| 欧美日韩在线成人| 美女亚洲一区| 18禁不卡免费网站| 精品国产美女福到在线不卡f| 538国产视频| 99久久精品国产麻豆婷婷| 五月天在线网站| 亚洲系列无码专区偷窥无码| 成人福利在线视频| 色综合婷婷| 久久香蕉国产线看观看精品蕉| 99视频只有精品| 天天色综网| 制服丝袜在线视频香蕉| 鲁鲁鲁爽爽爽在线视频观看| 91青青在线视频| 精品国产免费观看| 亚洲高清免费在线观看| 亚洲国产系列| 无码福利视频| 欧美一区二区三区国产精品| 97综合久久| 欧美色伊人| 久久77777| 欧美区国产区| 伊人激情久久综合中文字幕| 国产精品3p视频| 日韩天堂视频| 高清国产va日韩亚洲免费午夜电影| 日本高清视频在线www色| 天天做天天爱天天爽综合区| 一本大道东京热无码av| 中文字幕精品一区二区三区视频| 亚洲高清国产拍精品26u| 中文字幕乱码中文乱码51精品| 五月天天天色| 精品国产免费观看一区| 久久免费精品琪琪| www.youjizz.com久久| 精品无码国产一区二区三区AV| 美女被躁出白浆视频播放| 91精品国产自产在线观看| 欧美伦理一区| 伊人久久综在合线亚洲91| 日韩小视频在线观看| 亚洲成A人V欧美综合天堂| 精品欧美视频| 国产乱人伦偷精品视频AAA| 毛片久久久| aⅴ免费在线观看| 高潮毛片无遮挡高清视频播放|